| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.1 LAccepted-AOC | ₹7.1 L | L1 | Accepted-AOC L1 |
| 2 | L2₹7.1 LRejected-Finance | ₹7.1 L | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | MAYAKARPAGAINDUMATHY L1 | Muthumari L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation and depositing on bank with in initial lead lift in hard gravelly soil for foundation etc. complete. | 21.68 | Cum | 263.28 ₹5,707.91 | 264.78 ₹5,740.43 |
| 2.00 | Plain Cement concrete 1:4:8 mix using 40mm ISS metal including all cost and conveyance of all materials to site and all labour charges etc complete. | 10.3 | Cum | 5,520.2 ₹56,858.06 | 5,525.2 ₹56,909.56 |
| 3.00 | Random rubble masonry in cement mortar 1:5 mix with simultaneous pointing including cost and conveyance pf all materials to site and all labour charges etc complete for 10 cum | 11.17 | Cum | 5,880.19 ₹65,681.72 | 5,885.39 ₹65,739.81 |
| 4.00 | Brick work CM 1:5 mix using good country bricks including cost and conveyance of all materials to site and all labour charges etc complete. | 15.07 | Cum | 6,208.46 ₹93,561.49 | 6,209.46 ₹93,576.56 |
| 5.00Supplying and errecting centering are strutting including necessary supports for place surface for RCC columns footing pedestal beam criticals pears etc.,using mild steel angles of sizes 90 x 90 x 10 cm gauge stifness welded mild steel of sizes 25 x 25 x 3 cm for boarding laying over silver oak joists of single 10cm - 6.5cm space of 75cm ceter to center | |||||
| 6.00 | Plinth Beam | 4.16 | Sqm | 546.5 ₹2,273.44 | 547.5 ₹2,277.60 |
| 7.00 | Slab | 22.92 | Sqm | 1,095 ₹25,097.40 | 1,095 ₹25,097.40 |
| 8.00 | Providing and laying in position, standardised concrete Mix M-20 Grade in accordance with IS 456 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 325 kg/m3 and maximum water cement ratio of 0.55, including admixture (plasticiser / super plasticiser) in recommended proportions as per IS:9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability with about (5 cu.m.) 7730 kg. of 20mm machine crushed stone jelly and with about (3.3 cu.m.) 5156 kg. of 10-12mm machine crushed stone jelly and with about (4.79 cu.m) 7670 kg. of crushed stone sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor/ roof slabs wherever necessary without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS standards. (No separate payment will be made by the Department for the excess usage of materials). | 4.12 | Cum | 9,034.01 ₹37,220.12 | 9,134.01 ₹37,632.12 |
| 9.00 | Supplying and Fabrication of steel for RCC works including all cost of cutting bending and tying of steels and kept ready for concrete in position etc., | 480 | kg | 90.87 ₹43,617.60 | 95.87 ₹46,017.60 |
| 10.00 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work | 14.93 | Sqm | 309.45 ₹4,620.09 | 309.45 ₹4,620.09 |
Tender Value
₹7.9 L
EMD Value
₹7,930
Closing Date
3 Mar 2026, 3:00 pmClosed
Block Development officer
Block Development officer Tenkasi
Construction of Mini Community Sanitary Complex and water supply arrangement Near Ulagamman kovil Multipurpose building in Thenpothai Panchayat, Tenkasi Panchayat Union
2026_RDTN_666337_2
BDOBLK/111/2025-A2 DT 23.02.2026
Open Tender
Civil Works
TENKASI
Refer Tender Notice
3 documents required · 3 mandatory
₹0
₹7,930
13 May 2026
25 Feb 2026
3 Mar 2026
25 Feb 2026
3 Mar 2026
25 Feb 2026
Earth work excavation and depositing on bank with in initial lead lift in hard gravelly soil for foundation etc. complete.
Plain Cement concrete 1:4:8 mix using 40mm ISS metal including all cost and conveyance of all materials to site and all labour charges etc complete.
Random rubble masonry in cement mortar 1:5 mix with simultaneous pointing including cost and conveyance pf all materials to site and all labour charges etc complete for 10 cum
Brick work CM 1:5 mix using good country bricks including cost and conveyance of all materials to site and all labour charges etc complete.
Supplying and errecting centering are strutting including necessary supports for place surface for RCC columns footing pedestal beam criticals pears etc.,using mild steel angles of sizes 90 x 90 x 10 cm gauge stifness welded mild steel of sizes 25 x 25 x 3 cm for boarding laying over silver oak joists of single 10cm - 6.5cm space of 75cm ceter to center
Plinth Beam
Providing and laying in position, standardised concrete Mix M-20 Grade in accordance with IS 456 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 325 kg/m3 and maximum water cement ratio of 0.55, including admixture (plasticiser / super plasticiser) in recommended proportions as per IS:9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability with about (5 cu.m.) 7730 kg. of 20mm machine crushed stone jelly and with about (3.3 cu.m.) 5156 kg. of 10-12mm machine crushed stone jelly and with about (4.79 cu.m) 7670 kg. of crushed stone sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor/ roof slabs wherever necessary without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS standards. (No separate payment will be made by the Department for the excess usage of materials).
Supplying and Fabrication of steel for RCC works including all cost of cutting bending and tying of steels and kept ready for concrete in position etc.,
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work
Plastering with cement 1:5-12mm thick including cost and conveyance of al materials to site and all labour charges etc complete.
Finishing the top of roof with Best quality vitrified tiles of size 600mm x 600mm x 8mm of approved colour, shade & quality laid in CM 1:3 20mm thick and pointed with white cement mixed same colour pigments etc., and 2% of water profFing compound by weight of cement complying with standard specification.
Paving the floor with pre-polished concrete anti-skid tiles (Required shape and design) of 20mm thick of approved quality and colour laid in Cement Mortar 1:3 (One Cement and Three crushed stone sand) 20mm thick and pointed with white cement mixed with colouring pigment at the rate of 0.40 Kg. / sq.m., curing, etc., complete complying with standard specification and as directed by the departmental officers. (The make and brand of the tiles should be got approved by Executive Engineer before use on works) Using anti-skid tiles (Observed Data)
Dadooing walls with following best approved quality, white / colour glazed tiles of following sizes set in Cement Mortar 1:2 (One Cement and Two crushed stone M.Sand) 10mm thick and pointing the joints with white cement mixed with colouring pigments at the rate of 0.40 Kg. / sq.m. neatly in all floors, curing, etc.,
Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification.
Painting two coat with ready mixed plastic emulsion of first quality paint and of approved colour over a priming coat including thorogh scarpping clean removal of dirt etc., complete as per standard specification.
Cost and supply of IWC
Cost and supply of EWC
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks for 10 cum
110 mm dia pvc pipe M-0872
110mm PVC Door Elbow
110mm PVC TEE
2000 lit HDPE tank
Provision for Fencing arrangements
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Supply and Delivery of MS Iron Pipe including all cost and conveyance of materials and all labour charges etc complete.,
Supply and Delivery of 2" x 2" Chain links using 10 gauge galvanised iron wire of all sizes including all cost and conveyance of materials and all labour charges etc complete., M-0408
Labour charges for fixing of Iron pipes as per standard specification including all cost and conveyance of materials and all labour charges etc complete., W-0169
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
GST Amount for providing Service to Government Contract Works for the above RENEWAL Works. { GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.13 MB
BOQ_800404.xls
BOQ • 0.36 MB
doc2.pdf
Tender Documents • 0.10 MB
Download all tender documents and submit your bid