Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 CrAccepted-AOC | ₹1.9 Cr | L1 | Accepted-AOC Awarded |
| 2 | Rejected-Technical | - | - | Rejected-Technical Technically Non Responsive due to incomplete doument submission |
Tender Value
₹1.9 Cr
EMD Value
₹3.8 L
Closing Date
1 Mar 2021, 3:00 pmClosed
Executive Engineer, Jorhat Division (irrigation)
O/O The Executive Engineer. Jorhat Division (Irrigation), Jorhat-785001, Assam
Construction of Foot Bridge, Renovation of Main Canal, Construction Right Main Canal Construction of water course, Construction of Out Let, Construction of Tractor Crossing, Construction of cross-Drainage work etc.
2021_ID_21394_1
JD(I)/W-578/2020-21/001
Open Tender
Construction Works
Item Rate
180 days
Charaipani, Titabor Sub Division (Irrigation)
Please refer Tender documents.
4 documents required · 4 mandatory
₹4,000
₹3.8 L
Yes
18 Mar 2022
23 Feb 2021
2 Mar 2021
24 Feb 2021
1 Mar 2021
24 Feb 2021
Amount
CONSTRUCTION OF RCC FOOT BRIDGE
Earthwork in excavation trenches of walls, retaining walls, footing of columns, steps and septic tank including refilling (return filling) the quantity as necessary after completion of works, breaking clods in return filling, dressing, ramming, watering etc. and removal of surplus earth with all lead and lift upto 2 metre as directed and specified in following classification of soils, including bailing out of water where necessary upto depth below the existing ground level as mentioned in the approved drawing and complete as directed and specified.
CC work in proportion 1:4:8 in foundation/ abutment/ piers/ wing walls etc. with hard broken stone aggregate of size 13 mm to 38 mm including curing and dewatering with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
RCC work in slab, abutment cap and above abutment, pier cap, pedestals, dirt wall etc. in proportion 1:2:4 with hard broken stone aggregate of size 6 mm to 20 mm with proper reinforcement as per design including necessary curing, dewatering etc. with necessary timber shuttering, scaffolding etc. where necessary, complete as directed.
Supplying fitting fixing and laying reinforcement (TATA) in position in RCC work including cutting, bending, cranking with two piles 0.91 M (20 BWG) annealed wire hooking tying, complete as directed.
Centering and shuttering including propping etc where necessary and removal of forms after completion of CC and RCC works, complete as directed. (Measurement to be taken on the face area timbered).
Colum
12 mm cement plastering including clearing surface and curing, complete as directed. (ii) In proportion 1:4
Collection of one man size 25 cm to 30 cm hard river boulder including stacking CuM Rs. 911.06 in measurable stacks of not more than 1.00 M height at quarry site and making payment of forest royalty etc, complete as directed.
Labour charge for pitching with one man size boulder including dressing and ramming the seat to proper size and slope, pitching etc. with local carriage of boulders from a distance of 60 M with lift upto 3 M, complete as directed.
Renovation of Left Main Canal (C1) between Chainage 90m to 412 (3cusec)
Earthwork in excavation trenches of walls, retaining walls, footing of columns, steps and septic tank including refilling (return filling) the quantity as necessary after completion of works, breaking clods in return filling, dressing, ramming, watering etc. and removal of surplus earth with all lead and lift upto 2 metre as directed and specified in following classification of soils, including bailing out of water where necessary upto depth below the existing ground level as mentioned in the approved drawing and complete as directed and specified. (A) In ordinary soil
CC work in proportion 1:4:8 in foundation / abutment / piers / wing walls etc. with hard broken stone aggregate of size 13 mm to 38 mm including curing with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
1st class brick work in cement mortar in abutment and wing wall, parapet wall etc, including racking out joints and curing etc, complete as directed. (i) in proportion 1:4
Supplying fitting fixing and laying reinforcement (TATA) in position in RCC work including cutting, bending, cranking with two piles 0.91 M (20 BWG) annealed wire hooking tying, complete as directed.
WITH HARD BROKEN STONE AGGREGATE 6 MM TO 20 MM (i) RCC work in slab, abutment cap and above abutment, pier cap, pedestal, dirt wall etc. in proportion 1:2:4 with hard broken stone aggregate of size 6 mm to 20 mm with proper reinforcement as per design including curing etc. with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
Centering and shuttering including propping etc where necessary and removal of forms after completion of CC and RCC works, complete as directed. (Measurement to be taken on the face area timbered). (i) Shuttering with Prop.
(iii) Shuttering (Column)
Soling in foundation at all levels including filling intersides, ramming etc SqM complete as directed and of specified thickness with 9 cm brick on flat including sand packing.
WITH HARD BROKEN STONE AGGREGATE 13 MM TO 25 MM (ii) CC work in proportion 1:3:6 in foundation / abutment / piers / wing walls etc. with broken stone aggregate of size 13 mm to 25 mm including curing with timber shuttering, scaffolding etc. where necessary complete as directed. (Shuttering, scaffolding cost will be paid separately).
12 mm cement plastering including clearing surface and curing, complete as directed. (ii) In proportion 1:4
Earthwork in filling in all soils in plinth, canal embankment and bed filling as per design section and grade by truck carriage for a minimum distance of 4 KM including paying compensation of earth obtained from private land if any loading, unloading, spreading the same including light jungle, removing trees upto 15 cm dia and uprooting roots and stumps etc. from the seat of the embankment, breaking clods not more than 10 mm cube, ramming, profiling etc. with all lift, complete as directed. (Payment will be made after deduction of 12.50 % shrinkage allowance from the gross quantity).
Labour charge for dismantling of old CC works of canal structures and carriage the spoils and depositing the same in a safe distance as directed. : Carriage up to lead of 30 M and lift upto 1.50 M
Renovationof Left Main Canal (C5) between Chainage 30m to 422 (3cusec)
Earthwork in excavation trenches of walls, retaining walls, footing of columns, steps and septic tank including refilling (return filling) the quantity as necessary after completion of works, breaking clods in return filling, dressing, ramming, watering etc. and removal of surplus earth with all lead and lift upto 2 metre as directed and specified in following classification of soils, including bailing out of water where necessary upto depth below the existing ground level as mentioned in the approved drawing and complete as directed and specified. (A) In ordinary soil
CC work in proportion 1:4:8 in foundation / abutment / piers / wing walls etc. with hard broken stone aggregate of size 13 mm to 38 mm including curing with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
1st class brick work in cement mortar in abutment and wing wall, parapet wall etc, including racking out joints and curing etc, complete as directed. (i) in proportion 1:4
Supplying fitting fixing and laying reinforcement (TATA) in position in RCC work including cutting, bending, cranking with two piles 0.91 M (20 BWG) annealed wire hooking tying, complete as directed.
WITH HARD BROKEN STONE AGGREGATE 6 MM TO 20 MM (i) RCC work in slab, abutment cap and above abutment, pier cap, pedestal, dirt wall etc. in proportion 1:2:4 with hard broken stone aggregate of size 6 mm to 20 mm with proper reinforcement as per design including curing etc. with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
Centering and shuttering including propping etc where necessary and removal of forms after completion of CC and RCC works, complete as directed. (Measurement to be taken on the face area timbered). (i) Shuttering with Prop.
(iii) Shuttering (Column)
Soling in foundation at all levels including filling intersides, ramming etc SqM complete as directed and of specified thickness with 9 cm brick on flat including sand packing.
WITH HARD BROKEN STONE AGGREGATE 13 MM TO 25 MM (ii) CC work in proportion 1:3:6 in foundation / abutment / piers / wing walls etc. with broken stone aggregate of size 13 mm to 25 mm including curing with timber shuttering, scaffolding etc. where necessary complete as directed. (Shuttering, scaffolding cost will be paid separately).
12 mm cement plastering including clearing surface and curing, complete as directed. (ii) In proportion 1:4
Earthwork in filling in all soils in plinth, canal embankment and bed filling as per design section and grade by truck carriage for a minimum distance of 4 KM including paying compensation of earth obtained from private land if any loading, unloading, spreading the same including light jungle, removing trees upto 15 cm dia and uprooting roots and stumps etc. from the seat of the embankment, breaking clods not more than 10 mm cube, ramming, profiling etc. with all lift, complete as directed. (Payment will be made after deduction of 12.50 % shrinkage allowance from the gross quantity).
Labour charge for dismantling of old CC works of canal structures and carriage the spoils and depositing the same in a safe distance as directed. : Carriage up to lead of 30 M and lift upto 1.50 M
Renovation of Main Canal between Chainage 0m to 1080m(20cusec)
1st class brick work in cement mortar in abutment and wing wall, parapet wall etc, including racking out joints and curing etc, complete as directed. (i) in proportion 1:4
Supplying fitting fixing and laying reinforcement (TATA) in position in RCC work including cutting, bending, cranking with two piles 0.91 M (20 BWG) annealed wire hooking tying, complete as directed.
WITH HARD BROKEN STONE AGGREGATE 6 MM TO 20 MM (i) RCC work in slab, abutment cap and above abutment, pier cap, pedestal, dirt wall etc. in proportion 1:2:4 with hard broken stone aggregate of size 6 mm to 20 mm with proper reinforcement as per design including curing etc. with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
Centering and shuttering including propping etc where necessary and removal of forms after completion of CC and RCC works, complete as directed. (Measurement to be taken on the face area timbered). (i) Shuttering with Prop.
(iii) Shuttering (Column)
Soling in foundation at all levels including filling intersides, ramming etc SqM complete as directed and of specified thickness with 9 cm brick on flat including sand packing.
WITH HARD BROKEN STONE AGGREGATE 13 MM TO 25 MM (ii) CC work in proportion 1:3:6 in foundation / abutment / piers / wing walls etc. with broken stone aggregate of size 13 mm to 25 mm including curing with timber shuttering, scaffolding etc. where necessary complete as directed. (Shuttering, scaffolding cost will be paid separately).
12 mm cement plastering including clearing surface and curing, complete as directed. (ii) In proportion 1:4
Earthwork in filling in all soils in plinth, canal embankment and bed filling as per design section and grade by truck carriage for a minimum distance of 4 KM including paying compensation of earth obtained from private land if any loading, unloading, spreading the same including light jungle, removing trees upto 15 cm dia and uprooting roots and stumps etc. from the seat of the embankment, breaking clods not more than 10 mm cube, ramming, profiling etc. with all lift, complete as directed. (Payment will be made after deduction of 12.50 % shrinkage allowance from the gross quantity).
Labour charge for dismantling of old CC works of canal structures and carriage the spoils and depositing the same in a safe distance as directed. : Carriage up to lead of 30 M and lift upto 1.50 M
Renovation of Main Canal between Chainage 1080m to 1600m (18cusec)
Earthwork in excavation trenches of walls, retaining walls, footing of columns, steps and septic tank including refilling (return filling) the quantity as necessary after completion of works, breaking clods in return filling, dressing, ramming, watering etc. and removal of surplus earth with all lead and lift upto 2 metre as directed and specified in following classification of soils, including bailing out of water where necessary upto depth below the existing ground level as mentioned in the approved drawing and complete as directed and specified. (A) In ordinary soil
CC work in proportion 1:4:8 in foundation / abutment / piers / wing walls etc. with hard broken stone aggregate of size 13 mm to 38 mm including curing with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
1st class brick work in cement mortar in abutment and wing wall, parapet wall etc, including racking out joints and curing etc, complete as directed. (i) in proportion 1:4
Supplying fitting fixing and laying reinforcement (TATA) in position in RCC work including cutting, bending, cranking with two piles 0.91 M (20 BWG) annealed wire hooking tying, complete as directed.
WITH HARD BROKEN STONE AGGREGATE 6 MM TO 20 MM (i) RCC work in slab, abutment cap and above abutment, pier cap, pedestal, dirt wall etc. in proportion 1:2:4 with hard broken stone aggregate of size 6 mm to 20 mm with proper reinforcement as per design including curing etc. with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
Centering and shuttering including propping etc where necessary and removal of forms after completion of CC and RCC works, complete as directed. (Measurement to be taken on the face area timbered). (i) Shuttering with Prop.
(iii) Shuttering (Column)
Soling in foundation at all levels including filling intersides, ramming etc SqM complete as directed and of specified thickness with 9 cm brick on flat including sand packing.
WITH HARD BROKEN STONE AGGREGATE 13 MM TO 25 MM (ii) CC work in proportion 1:3:6 in foundation / abutment / piers / wing walls etc. with broken stone aggregate of size 13 mm to 25 mm including curing with timber shuttering, scaffolding etc. where necessary complete as directed. (Shuttering, scaffolding cost will be paid separately).
12 mm cement plastering including clearing surface and curing, complete as directed. (ii) In proportion 1:4
Earthwork in filling in all soils in plinth, canal embankment and bed filling as per design section and grade by truck carriage for a minimum distance of 4 KM including paying compensation of earth obtained from private land if any loading, unloading, spreading the same including light jungle, removing trees upto 15 cm dia and uprooting roots and stumps etc. from the seat of the embankment, breaking clods not more than 10 mm cube, ramming, profiling etc. with all lift, complete as directed. (Payment will be made after deduction of 12.50 % shrinkage allowance from the gross quantity).
River sand filling in plinth, canal bed, canal slopes, bases of structure, etc in layers not more than 150 mm thick including necessary carriage, watering etc, complete as directed as specified.
Labour charge for dismantling of old CC works of canal structures and carriage the spoils and depositing the same in a safe distance as directed. : Carriage up to lead of 30 M and lift upto 1.50 M
Renovation of Main Canal between Chainage 1600 to 2170m (15cusec)
Earthwork in excavation trenches of walls, retaining walls, footing of columns, steps and septic tank including refilling (return filling) the quantity as necessary after completion of works, breaking clods in return filling, dressing, ramming, watering etc. and removal of surplus earth with all lead and lift upto 2 metre as directed and specified in following classification of soils, including bailing out of water where necessary upto depth below the existing ground level as mentioned in the approved drawing and complete as directed and specified. (A) In ordinary soil
CC work in proportion 1:4:8 in foundation / abutment / piers / wing walls etc. with hard broken stone aggregate of size 13 mm to 38 mm including curing with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
1st class brick work in cement mortar in abutment and wing wall, parapet wall etc, including racking out joints and curing etc, complete as directed. (i) in proportion 1:4
Supplying fitting fixing and laying reinforcement (TATA) in position in RCC work including cutting, bending, cranking with two piles 0.91 M (20 BWG) annealed wire hooking tying, complete as directed.
WITH HARD BROKEN STONE AGGREGATE 6 MM TO 20 MM (i) RCC work in slab, abutment cap and above abutment, pier cap, pedestal, dirt wall etc. in proportion 1:2:4 with hard broken stone aggregate of size 6 mm to 20 mm with proper reinforcement as per design including curing etc. with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
Centering and shuttering including propping etc where necessary and removal of forms after completion of CC and RCC works, complete as directed. (Measurement to be taken on the face area timbered). (i) Shuttering with Prop.
(iii) Shuttering (Column)
Soling in foundation at all levels including filling intersides, ramming etc SqM complete as directed and of specified thickness with 9 cm brick on flat including sand packing.
WITH HARD BROKEN STONE AGGREGATE 13 MM TO 25 MM (ii) CC work in proportion 1:3:6 in foundation / abutment / piers / wing walls etc. with broken stone aggregate of size 13 mm to 25 mm including curing with timber shuttering, scaffolding etc. where necessary complete as directed. (Shuttering, scaffolding cost will be paid separately).
12 mm cement plastering including clearing surface and curing, complete as directed. (ii) In proportion 1:4
Earthwork in filling in all soils in plinth, canal embankment and bed filling as per design section and grade by truck carriage for a minimum distance of 4 KM including paying compensation of earth obtained from private land if any loading, unloading, spreading the same including light jungle, removing trees upto 15 cm dia and uprooting roots and stumps etc. from the seat of the embankment, breaking clods not more than 10 mm cube, ramming, profiling etc. with all lift, complete as directed. (Payment will be made after deduction of 12.50 % shrinkage allowance from the gross quantity).
River sand filling in plinth, canal bed, canal slopes, bases of structure, etc in layers not more than 150 mm thick including necessary carriage, watering etc, complete as directed as specified.
Labour charge for dismantling of old CC works of canal structures and carriage the spoils and depositing the same in a safe distance as directed. : Carriage up to lead of 30 M and lift upto 1.50 M
Renovation of Main Canal between Chainage 2170 to 3060m (11cusec)
Earthwork in excavation trenches of walls, retaining walls, footing of columns, steps and septic tank including refilling (return filling) the quantity as necessary after completion of works, breaking clods in return filling, dressing, ramming, watering etc. and removal of surplus earth with all lead and lift upto 2 metre as directed and specified in following classification of soils, including bailing out of water where necessary upto depth below the existing ground level as mentioned in the approved drawing and complete as directed and specified. (A) In ordinary soil
CC work in proportion 1:4:8 in foundation / abutment / piers / wing walls etc. with hard broken stone aggregate of size 13 mm to 38 mm including curing with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
1st class brick work in cement mortar in abutment and wing wall, parapet wall etc, including racking out joints and curing etc, complete as directed. (i) in proportion 1:4
Supplying fitting fixing and laying reinforcement (TATA) in position in RCC work including cutting, bending, cranking with two piles 0.91 M (20 BWG) annealed wire hooking tying, complete as directed.
WITH HARD BROKEN STONE AGGREGATE 6 MM TO 20 MM (i) RCC work in slab, abutment cap and above abutment, pier cap, pedestal, dirt wall etc. in proportion 1:2:4 with hard broken stone aggregate of size 6 mm to 20 mm with proper reinforcement as per design including curing etc. with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
Centering and shuttering including propping etc where necessary and removal of forms after completion of CC and RCC works, complete as directed. (Measurement to be taken on the face area timbered). (i) Shuttering with Prop.
(iii) Shuttering (Column)
Soling in foundation at all levels including filling intersides, ramming etc SqM complete as directed and of specified thickness with 9 cm brick on flat including sand packing.
WITH HARD BROKEN STONE AGGREGATE 13 MM TO 25 MM (ii) CC work in proportion 1:3:6 in foundation / abutment / piers / wing walls etc. with broken stone aggregate of size 13 mm to 25 mm including curing with timber shuttering, scaffolding etc. where necessary complete as directed. (Shuttering, scaffolding cost will be paid separately).
12 mm cement plastering including clearing surface and curing, complete as directed. (ii) In proportion 1:4
Earthwork in filling in all soils in plinth, canal embankment and bed filling as per design section and grade by truck carriage for a minimum distance of 4 KM including paying compensation of earth obtained from private land if any loading, unloading, spreading the same including light jungle, removing trees upto 15 cm dia and uprooting roots and stumps etc. from the seat of the embankment, breaking clods not more than 10 mm cube, ramming, profiling etc. with all lift, complete as directed. (Payment will be made after deduction of 12.50 % shrinkage allowance from the gross quantity).
River sand filling in plinth, canal bed, canal slopes, bases of structure, etc in layers not more than 150 mm thick including necessary carriage, watering etc, complete as directed as specified.
Labour charge for dismantling of old CC works of canal structures and carriage the spoils and depositing the same in a safe distance as directed. : Carriage up to lead of 30 M and lift upto 1.50 M
Construction of water course (2cusec)
Earthwork in excavation trenches of walls, retaining walls, footing of columns, steps and septic tank including refilling (return filling) the quantity as necessary after completion of works, breaking clods in return filling, dressing, ramming, watering etc. and removal of surplus earth with all lead and lift upto 2 metre as directed and specified in following classification of soils, including bailing out of water where necessary upto depth below the existing ground level as mentioned in the approved drawing and complete as directed and specified. (A) In ordinary soil
CC work in proportion 1:4:8 in foundation / abutment / piers / wing walls etc. with hard broken stone aggregate of size 13 mm to 38 mm including curing with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
1st class brick work in cement mortar in abutment and wing wall, parapet wall etc, including racking out joints and curing etc, complete as directed. (i) in proportion 1:4
Supplying fitting fixing and laying reinforcement (TATA) in position in RCC work including cutting, bending, cranking with two piles 0.91 M (20 BWG) annealed wire hooking tying, complete as directed.
WITH HARD BROKEN STONE AGGREGATE 6 MM TO 20 MM (i) RCC work in slab, abutment cap and above abutment, pier cap, pedestal, dirt wall etc. in proportion 1:2:4 with hard broken stone aggregate of size 6 mm to 20 mm with proper reinforcement as per design including curing etc. with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
Centering and shuttering including propping etc where necessary and removal of forms after completion of CC and RCC works, complete as directed. (Measurement to be taken on the face area timbered). (i) Shuttering with Prop.
(iii) Shuttering (Column)
Soling in foundation at all levels including filling intersides, ramming etc SqM complete as directed and of specified thickness with 9 cm brick on flat including sand packing.
WITH HARD BROKEN STONE AGGREGATE 13 MM TO 25 MM (ii) CC work in proportion 1:3:6 in foundation / abutment / piers / wing walls etc. with broken stone aggregate of size 13 mm to 25 mm including curing with timber shuttering, scaffolding etc. where necessary complete as directed. (Shuttering, scaffolding cost will be paid separately).
12 mm cement plastering including clearing surface and curing, complete as directed. (ii) In proportion 1:4
Earthwork in filling in all soils in plinth, canal embankment and bed filling as per design section and grade by truck carriage for a minimum distance of 4 KM including paying compensation of earth obtained from private land if any loading, unloading, spreading the same including light jungle, removing trees upto 15 cm dia and uprooting roots and stumps etc. from the seat of the embankment, breaking clods not more than 10 mm cube, ramming, profiling etc. with all lift, complete as directed. (Payment will be made after deduction of 12.50 % shrinkage allowance from the gross quantity).
construction of Canal Outlet
Earthwork in excavation trenches of walls, retaining walls, footing of columns, steps and septic tank including refilling (return filling) the quantity as necessary after completion of works, breaking clods in return filling, dressing, ramming, watering etc. and removal of surplus earth with all lead and lift upto 2 metre as directed and specified in following classification of soils, including bailing out of water where necessary upto depth below the existing ground level as mentioned in the approved drawing and complete as directed and specified. (A) In ordinary soil
CC work in proportion 1:4:8 in foundation / abutment / piers / wing walls etc. with hard broken stone aggregate of size 13 mm to 38 mm including curing with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
1st class brick work in cement mortar in abutment and wing wall, parapet wall etc, including racking out joints and curing etc, complete as directed. (i) in proportion 1:4
14.2 12 mm cement plastering including clearing surface and curing, complete as directed. (ii) In proportion 1:4
Supplying, fitting, fixing PVC pipes (IS 12818, 6 kg/cm2), joining pipes with relevant cement, levelling, testing leakages etc, complete as directed. (Cost of E/W foundation trenches will be paid separately). (i) For 110 mm dia
Supplying, fitting, fixing PVC bend pipe size joining with pipes with solvent cement, testing leakages etc, complete as directed. (i) For 110 mm / 900
Construction of 3.00m wide Tractor Crossing
Earthwork in excavation trenches of walls, retaining walls, footing of columns, steps and septic tank including refilling (return filling) the quantity as necessary after completion of works, breaking clods in return filling, dressing, ramming, watering etc. and removal of surplus earth with all lead and lift upto 2 metre as directed and specified in following classification of soils, including bailing out of water where necessary upto depth below the existing ground level as mentioned in the approved drawing and complete as directed and specified. (A) In ordinary soil
Soling in foundation at all levels including filling intersides, ramming etc SqM complete as directed and of specified thickness with 9 cm brick on flat including sand packing.
CC work in proportion 1:4:8 in foundation / abutment / piers / wing walls etc. with hard broken stone aggregate of size 13 mm to 38 mm including curing with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
WITH HARD BROKEN STONE AGGREGATE 6 MM TO 20 MM (i) RCC work in slab, abutment cap and above abutment, pier cap, pedestal, dirt wall etc. in proportion 1:2:4 with hard broken stone aggregate of size 6 mm to 20 mm with proper reinforcement as per design including curing etc. with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
Supplying fitting fixing and laying reinforcement (TATA) in position in RCC work including cutting, bending, cranking with two piles 0.91 M (20 BWG) annealed wire hooking tying, complete as directed.
Centering and shuttering including propping etc where necessary and removal of forms after completion of CC and RCC works, complete as directed. (Measurement to be taken on the face area timbered). (i) Shuttering with Prop.
(iii) Shuttering (Column)
12 mm cement plastering including clearing surface and curing, complete as directed. (ii) In proportion 1:4
Earthwork in filling in all soils in plinth, canal embankment and bed filling as per design section and grade by truck carriage for a minimum distance of 4 KM including paying compensation of earth obtained from private land if any loading, unloading, spreading the same including light jungle, removing trees upto 15 cm dia and uprooting roots and stumps etc. from the seat of the embankment, breaking clods not more than 10 mm cube, ramming, profiling etc. with all lift, complete as directed. (Payment will be made after deduction of 12.50 % shrinkage allowance from the gross quantity).
Labour charge for dismantling of old CC works of canal structures and carriage the spoils and depositing the same in a safe distance as directed. : Carriage up to lead of 30 M and lift upto 1.50 M
Construction of 0.9m dia HP Cross Drainage works
Earthwork in excavation trenches of walls, retaining walls, footing of columns, steps and septic tank including refilling (return filling) the quantity as necessary after completion of works, breaking clods in return filling, dressing, ramming, watering etc. and removal of surplus earth with all lead and lift upto 2 metre as directed and specified in following classification of soils, including bailing out of water where necessary upto depth below the existing ground level as mentioned in the approved drawing and complete as directed and specified. (A) In ordinary soil
CC work in proportion 1:4:8 in foundation / abutment / piers / wing walls etc. with hard broken stone aggregate of size 13 mm to 38 mm including curing with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
CC work in proportion 1:3:6 in foundation / abutment / piers / wing walls etc. with broken stone aggregate of size 13 mm to 25 mm including curing with timber shuttering, scaffolding etc. where necessary complete as directed. (Shuttering, scaffolding cost will be paid separately).
Centering and shuttering including propping etc where necessary and removal of forms after completion of CC and RCC works, complete as directed. (Measurement to be taken on the face area timbered). (i) Shuttering (Column)
Supply of NP 3# class Hume Pipe of 2.5m Length & 0.90m dia including carriage, loading & unloading.
12 mm cement plastering including clearing surface and curing, complete as directed. (ii) In proportion 1:4
Collection & Supply of one man size river boulder 25 to 30 cm size including stacking in measurable stacks of not more than 1.00m height including payment of FR and GST complete as directed.
Labour charge for pitching with one man size boulder including dressing and ramming the seat to proper size and slope, pitching etc. with local carriage of boulders from a distance of 60 M with lift upto 3 M, complete as directed.
Soling in foundation at all levels including filling intersides, ramming etc SqM complete as directed and of specified thickness with 9 cm brick on flat including sand packing.
1st class brick work in cement mortar in abutment and wing wall, parapet wall etc, including racking out joints and curing etc, complete as directed. (i) in proportion 1:4
Earthwork in filling in all soils in plinth, canal embankment and bed filling as per design section and grade by truck carriage for a minimum distance of 4 KM including paying compensation of earth obtained from private land if any loading, unloading, spreading the same including light jungle, removing trees upto 15 cm dia and uprooting roots and stumps etc. from the seat of the embankment, breaking clods not more than 10 mm cube, ramming, profiling etc. with all lift, complete as directed. (Payment will be made after deduction of 12.50 % shrinkage allowance from the gross quantity).
.Labour charge for dismantling / replacing the old damaged hume pipe up to 1000 mm dia of canal structure and carriage of the same upto a lead of 30 M and lift of 2.5 M and depositing the same in a safe distance as directed.
Construction of 0.3m dia HP Cross Drainage works
Earthwork in excavation trenches of walls, retaining walls, footing of columns, steps and septic tank including refilling (return filling) the quantity as necessary after completion of works, breaking clods in return filling, dressing, ramming, watering etc. and removal of surplus earth with all lead and lift upto 2 metre as directed and specified in following classification of soils, including bailing out of water where necessary upto depth below the existing ground level as mentioned in the approved drawing and complete as directed and specified. (A) In ordinary soil
CC work in proportion 1:4:8 in foundation / abutment / piers / wing walls etc. with hard broken stone aggregate of size 13 mm to 38 mm including curing with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
1st class brick work in cement mortar in abutment and wing wall, parapet wall etc, including racking out joints and curing etc, complete as directed. (i) in proportion 1:4
RCC work in slab, abutment cap and above abutment, pier cap, pedestal, dirt wall etc. in proportion 1:2:4 with hard broken stone aggregate of size 6 mm to 20 mm with proper reinforcement as per design including curing etc. with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
Supply of 0.30m dia Hume Pipe of 2.5m Length including carriage, loading & unloading.
Labour for fitting and fixing hume pipe in position with collars including joining the cement mortar in proportion 1:3 and curing, including carrying the same from godown to site and complete as directed. (i) For 30 cm to 60 cm dia
Construction of 0.75m dia HP Aqeduct
Earthwork in excavation trenches of walls, retaining walls, footing of columns, steps and septic tank including refilling (return filling) the quantity as necessary after completion of works, breaking clods in return filling, dressing, ramming, watering etc. and removal of surplus earth with all lead and lift upto 2 metre as directed and specified in following classification of soils, including bailing out of water where necessary upto depth below the existing ground level as mentioned in the approved drawing and complete as directed and specified. (A) In ordinary soil
CC work in proportion 1:4:8 in foundation / abutment / piers / wing walls etc. with hard broken stone aggregate of size 13 mm to 38 mm including curing with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
CC work in proportion 1:3:6 in foundation / abutment / piers / wing walls etc. with broken stone aggregate of size 13 mm to 25 mm including curing with timber shuttering, scaffolding etc. where necessary complete as directed. (Shuttering, scaffolding cost will be paid separately).
RCC work in slab, abutment cap and above abutment, pier cap, pedestal, dirt wall etc. in proportion 1:2:4 with hard broken stone aggregate of size 6 mm to 20 mm with proper reinforcement as per design including curing etc. with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately)
Centering and shuttering including propping etc where necessary and removal of forms after completion of CC and RCC works, complete as directed. (Measurement to be taken on the face area timbered). (i) Shuttering (Column)
Supply of NP#3 class Hume Pipe of 2.5m Length & 0.90m dia including carriage, loading & unloading.
12 mm cement plastering including clearing surface and curing, complete as directed. (ii) In proportion 1:4
Collection of Supply of one man size river boulder 25 to 30 cm size including stacking in measurable stacks of not more than 1.00m height including payment of FR and GST complete as directed.
Labour charge for pitching with one man size boulder including dressing and ramming the seat to proper size and slope, pitching etc. with local carriage of boulders from a distance of 60 M with lift upto 3 M, complete as directed
Construction of Cattle Crossing
1st class brick work in cement mortar in abutment and wing wall, parapet wall etc, including racking out joints and curing etc, complete as directed. (i) in proportion 1:4
Centering and shuttering including propping etc where necessary and removal of forms after completion of CC and RCC works, complete as directed. (Measurement to be taken on the face area timbered).
Supplying fitting fixing and laying reinforcement (TATA) in position in RCC work including cutting, bending, cranking with two piles 0.91 M (20 BWG) annealed wire hooking tying, complete as directed.
(A) WITH HARD BROKEN STONE AGGREGATE 6 MM TO 20 MM (i) RCC work in slab, abutment cap and above abutment, pier cap, pedestal, dirt wall etc. in proportion 1:2:4 with hard broken stone aggregate of size 6 mm to 20 mm with proper reinforcement as per design including curing etc. with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
12 mm cement plastering including clearing surface and curing, complete as directed. (ii) In proportion 1:4
(A) Earthwork in filling in all soils in plinth, canal embankment and bed filling as per design section and grade by truck carriage for a minimum distance of 4 KM including paying compensation of earth obtained from private land if any loading, unloading, spreading the same including light jungle, removing trees upto 15 cm dia and uprooting roots and stumps etc. from the seat of the embankment, breaking clods not more than 10 mm cube, ramming, profiling etc. with all lift, complete as directed. (Payment will be made after deduction of 12.50 % shrinkage allowance from the gross quantity).
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .