Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹92.3 LAccepted-Finance | ₹92.3 L | L1 | Accepted-Finance L1 |
| 2 | L2₹96.1 L+₹3.8 L (4.06%)Accepted-Finance | ₹96.1 L+₹3.8 L (4.06%) | L2 | Accepted-Finance L2 |
| 3 | L3₹98.9 L+₹6.5 L (7.08%)Accepted-Finance | ₹98.9 L+₹6.5 L (7.08%) | L3 | Accepted-Finance L3 |
Tender Value
Refer Docs
EMD Value
₹2.0 L
Closing Date
2 Mar 2023, 3:00 pmClosed
General Manager (SEZ)
Office of the General Manager (SEZ), WAPCOS Limited (Madras Special Economic Zone Project Office), MEPZ-SEZ, Tambaram, Chennai
Rectification and Painting Works for Boundary/Compound Wall in MEPZ-SEZ, Tambaram Sanatorium, Chennai - 600 045
2023_MSEZA_733334_2
WAP/ENVT/MEPZ/2023/ET/01
Open Tender
Civil Works
Works
180 days
MEPZ-SEZ, Tambaram Sanatorium, Chennai
As per Tender Conditions
2 documents required · 2 mandatory
₹5,900
WAPCOS Limited
₹2.0 L
MEPZ SEZ, Tambaram Sanatorium, Chennai
14 Aug 2024
10 Feb 2023
3 Mar 2023
10 Feb 2023
2 Mar 2023
24 Feb 2023
18 Feb 2023
Amount
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
Felling trees of the girth (measured at a height of 1 m above ground level), including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. Beyond 30 cm girth upto and including 60 cm girth
Demolishing brick work In cement mortar manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.
Removing dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete.
Brick work with common burnt clay F.P.S. (non-modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in with Cement mortar 1:4 (1 cement: 4 coarse sand)
15 mm cement plaster on rough side of single or half brick wall of mix with 1:4 (1 cement: 4 coarse sand)
White washing with lime of approved brand to give an even shade with New work (three or more coats) and including all complete.
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more.
Fencing with angle iron post placed at required distance embedded in cement concrete blocks, every fifteenth post, last but one end post and corner post shell be strutted on poth side end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.3kg per 100m (minimum), between the two-post fitted and fixing with G.I. staples, turn buckles etc. complete. (Cost of post, struts, earth work and concrete work to be paid for separate). payment to be made for metre cost of total length of barbed wire used. With G.I. barbed wire.
Supplying at site angle iron post & strut of required size including bottom to be split and bent at right angle in opposite direction for 10cm legth and drilling holes upto 10mm dia.etc. complete.
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat with two coats of enamel paint of approved quality all complete as per the direction of Engineer-in charge
SSBA Builders
SRI RADHA CONSTRUCTIONS
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .