Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.8 CrAccepted-AOC | L1 | Accepted-AOC L1 Letter No. 4144(S)WE Date-03.11.2025 | |
| 2 | L2₹30.7 Cr+₹89.4 L (3.00%)Rejected-Finance | L2 | Rejected-Finance L2 Letter No. 4144(S)WE Date-03.11.2025 | |
| 3 | L3₹32.0 Cr+₹2.2 Cr (7.25%)Rejected-Finance DOBHI GAYA BIHAR | L3 | Rejected-Finance L3 Letter No. 4144(S)WE Date-03.11.2025 | |
| 4 | L4₹33.4 Cr+₹3.6 Cr (12.1%)Rejected-Finance | L4 | Rejected-Finance L4 Letter No. 4144(S)WE Date-03.11.2025 | |
| 5 | Rejected-Technical | - | Rejected-Technical Non Responsive |
| Sl No | Description | Qty | Unit | BANSHIDHAR CONSTRUCTION PRIVATE LIMITED L4 | M/s SILDILIYA CONSTRUCTION L1 | UNIVERSAL AGENCY RAMGARH PRIVATE LIMITED L2 | MS MANISHA CONSTRUCTION L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. (By manual means in area of light jungle).RCDSOR 2.03(i)A | 7.56 | Hect. | 78,555 ₹5,93,561.58 | 35,000 ₹2,64,460 Lowest | 57,204 ₹4,32,233.42 | 83,189.06 ₹6,28,576.54 |
| 2.00 | Cutting of Trees, including Cutting of Trunks, Branches and Removal (Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 mtrs and earth filling in the depression/pit.)(i) Girth from 300 mm to 600 mm.RCDSOR 2.01(A) + 2.01(B) | 26 | Each | 455 ₹11,830 | 2 ₹52 Lowest | 561.83 ₹14,607.58 | 575.28 ₹14,957.28 |
| 3.00 | Cutting of Trees, including Cutting of Trunks, Branches and Removal (Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 mtrs and earth filling in the depression/pit.)(ii) Girth from 600 mm to 900 mm.RCDSOR 2.01(A) + 2.01(B) | 167 | Each | 655 ₹1,09,385 | 2 ₹334 Lowest | 766.13 ₹1,27,943.71 | 869.5 ₹1,45,206.5 |
| 4.00 | Cutting of Trees, including Cutting of Trunks, Branches and Removal (Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 mtrs and earth filling in the depression/pit.)(iii) Girth from 900 mm to 1800 mm.RCDSOR 2.01(A) + 2.01(B) | 426 | Each | 1,055 ₹4,49,430 | 2 ₹852 Lowest | 1,026.51 ₹4,37,293.26 | 1,347.96 ₹5,74,230.96 |
| 5.00 | Cutting of Trees, including Cutting of Trunks, Branches and Removal (Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 mtrs and earth filling in the depression/pit.)(iv) Girth above 1800 mm.RCDSOR 2.01(A) + 2.01(B) | 55 | Each | 1,855 ₹1,02,025 | 2 ₹110 Lowest | 2,053.01 ₹1,12,915.55 | 2,390.42 ₹1,31,473.1 |
| 6.00 | Dismantling of Structures (Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres).By mechanical means.Dismantling Stone masonry parapet,wall.RCDSOR 2.04(ii)IB | 490.32 | cum | 225 ₹1,10,322 | 184 ₹90,218.88 Lowest | 292.46 ₹1,43,398.99 | 268.84 ₹1,31,817.63 |
| 7.00 | Dismantling of Structures (Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres).By mechanical means.Lime/ Cement concrete.By Manual means.Cement concrete Grade M-15 & M-20.RCDSOR 2.04(i)IB | 67.82 | cum | 415 ₹28,145.3 | 184 ₹12,478.88 Lowest | 462.13 ₹31,341.66 | 424.88 ₹28,815.36 |
| 8.00 | Dismantling of Structures (Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres).By mechanical means.RCC Slab.RCDSOR 2.04(i)IIB | 60.75 | cum | 257 ₹15,612.75 | 184 ₹11,178 Lowest | 880 ₹53,460 | 833.78 ₹50,652.13 |
| 9.00 | Dismantling of flexible pavements and disposal of dismantled materials upto a leadof 1000 metres, stacking serviceable and unserviceable materials separately.By mechanical means.Bituminous courses.RCDSOR 2.05(ii)A | 387.52 | cum | 207 ₹80,216.64 | 7.1 ₹2,751.39 Lowest | 239.03 ₹92,628.91 | 219.96 ₹85,238.9 |
| 10.00 | Dismantling of cement concrete pavement by mechanical means using pneumatic tools, breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials up to a alead of 1000 metres, stackiung serviceable and unserviceable materials separately.RCDSOR 4.06 | 261.24 | cum | 1,036 ₹2,70,644.64 | 184 ₹48,068.16 Lowest | 440 ₹1,14,945.6 | 415.48 ₹1,08,540 |
Tender Value
₹34.1 Cr
EMD Value
₹34.1 L
Closing Date
26 Dec 2024, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE ENGINEER RCD ROAD DIVISION CHATRA
EXECUTIVE ENGINEER RCD ROAD DIVISION CHATRA
Widening Strengthening Reconstruction of Ghanghri to Koleshwari Temple via Dantar Road from KM 0.00 to 10.935
2024_CECOM_96223_1
RCD/CHATRA/975/2024-25
Open Tender
Civil Works
Item Wise
365 days
Ghanghri to Koleshwari Temple via Dantar Road
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
₹34.1 L
Chief Engineer (Comm),RCD,Jharkhand,Ranchi
2 Jan 2026
4 Dec 2024
30 Dec 2024
4 Dec 2024
26 Dec 2024
4 Dec 2024
20 Dec 2024
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. (By manual means in area of light jungle).RCDSOR 2.03(i)A | - | Hect. | - | - |
| 2 | Cutting of Trees, including Cutting of Trunks, Branches and Removal (Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 mtrs and earth filling in the depression/pit.)(i) Girth from 300 mm to 600 mm.RCDSOR 2.01(A) + 2.01(B) | 26 | Each | - | - |
| 3 | Cutting of Trees, including Cutting of Trunks, Branches and Removal (Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 mtrs and earth filling in the depression/pit.)(ii) Girth from 600 mm to 900 mm.RCDSOR 2.01(A) + 2.01(B) | 167 | Each | - | - |
| 4 | Cutting of Trees, including Cutting of Trunks, Branches and Removal (Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 mtrs and earth filling in the depression/pit.)(iii) Girth from 900 mm to 1800 mm.RCDSOR 2.01(A) + 2.01(B) | 426 | Each | - | - |
| 5 | Cutting of Trees, including Cutting of Trunks, Branches and Removal (Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 mtrs and earth filling in the depression/pit.)(iv) Girth above 1800 mm.RCDSOR 2.01(A) + 2.01(B) | 55 | Each | - | - |
| 6 | Dismantling of Structures (Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres).By mechanical means.Dismantling Stone masonry parapet,wall.RCDSOR 2.04(ii)IB | 490.32 | cum | - | - |
| 7 | Dismantling of Structures (Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres).By mechanical means.Lime/ Cement concrete.By Manual means.Cement concrete Grade M-15 & M-20.RCDSOR 2.04(i)IB | 67.82 | cum | - | - |
| 8 | Dismantling of Structures (Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres).By mechanical means.RCC Slab.RCDSOR 2.04(i)IIB | 60.75 | cum | - | - |
| 9 | Dismantling of flexible pavements and disposal of dismantled materials upto a leadof 1000 metres, stacking serviceable and unserviceable materials separately.By mechanical means.Bituminous courses.RCDSOR 2.05(ii)A | 387.52 | cum | - | - |
| 10 | Dismantling of cement concrete pavement by mechanical means using pneumatic tools, breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials up to a alead of 1000 metres, stackiung serviceable and unserviceable materials separately.RCDSOR 4.06 | 261.24 | cum | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_129287.xls
BOQ • 0.34 MB
157822194.pdf
Tender Documents • 0.46 MB
157822196.html
Tender Documents • 0.05 MB
SBD.pdf
Tender Documents • 1.70 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .