Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.5 LQualified | L1 | Qualified MSE, MII, Category: General | |
| 2 | L2₹2.5 L+₹1,980 (0.80%)Qualified | L2 | Qualified MSE, MII, Category: General |
Tender Value
Refer Docs
EMD Value
Exempted
Closing Date
11 Jul 2022, 7:00 pmClosed
Soil testing
3569325
GEM/2022/B/2332537
Soil Testing,Soil Testing,Soil Testing
30 days
Punjab; Firozepur
Total value wise evaluation
BOQ
7 documents required · 7 mandatory
2 yrs
₹3 L
₹3 L
50%
Exempted
18 Jul 2022
9 Jul 2022
11 Jul 2022
| Item No | Item Title | Description | Qty | Unit | Consignee | Delivery (days) |
|---|---|---|---|---|---|---|
| 1 | Soil Testing | Determining SBC of soil by performing necessary test such as per STP/DCPT as per 2131-1981 whichever is suitable also recommended the type of fdn and SBC of soil at certain depth by performing bore hole up to 6.0 m depth with 01 Nos each trail pit of (sizr 1.2x1.2x3.0 m depth) 5.0 mtr away from bore hole (both centerally placed) or refusal whichever is earlier alongwith SPT at 1.0 m i bore hole. Collection of soil sample (disturbed/undisturbed) their complet Lab testing as per relevant IS code taking SSWL (if encounter) and other engineering and index properties and evaluation of soil within capcity and chemical analysis of soil sample to determine PH value sulphate and chlorides as per IS 456/2000 (for RCC frame structure in single storey bldgs) complete all as specified and as per IS. | 31 | Nos | [email protected] | 30 |
| 2 | Soil Testing | Determining SBC of soil by performing necessary test such as per STP/DCPT as per 2131-1981 whichever is suitable also recommended the type of fdn and SBC of soil at certain depth by performing bore hole up to 6.0 m depth with 01 Nos each trail pit of (sizr 1.2x1.2x3.0 m depth) 5.0 mtr away from bore hole (both centerally placed) or refusal whichever is earlier alongwith SPT at 1.0 m i bore hole. Collection of soil sample (disturbed/undisturbed) their complet Lab testing as per relevant IS code taking SSWL (if encounter) and other engineering and index properties and evaluation of soil within capcity and chemical analysis of soil sample to determine PH value sulphate and chlorides as per IS 456/2000 (for RCC frame structure in single storey bldgs) complete all as specified and as per IS. | 1 | Nos | [email protected] | 30 |
| 3 | Soil Testing | Determining SBC of soil by performing necessary test such as per STP/DCPT as per 2131-1981 whichever is suitable also recommended the type of fdn and SBC of soil at certain depth by performing bore hole up to 6.0 m depth with 01 Nos each trail pit of (sizr 1.2x1.2x3.0 m depth) 5.0 mtr away from bore hole (both centerally placed) or refusal whichever is earlier alongwith SPT at 1.0 m i bore hole. Collection of soil sample (disturbed/undisturbed) their complet Lab testing as per relevant IS code taking SSWL (if encounter) and other engineering and index properties and evaluation of soil within capcity and chemical analysis of soil sample to determine PH value sulphate and chlorides as per IS 456/2000 (for RCC frame structure in single storey bldgs) complete all as specified and as per IS. | 1 | Nos | [email protected] | 30 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_3569325.pdf
GEM_BID
dcs-for-seriveces_2022-07-08-18-29-31_807e6d35f9b08ee6b0e1a6d11b4dce3d.pdf
BOQ
boq_item4_2022-07-08-18-29-31_195940221b13d73504c008d850a2441a.csv
BOQ
gtc.pdf
OTHER
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .