Tender Value
₹2.1 Cr
EMD Value
₹2.0 L
Closing Date
6 Jul 2026, 9:30 pm
Directorate of Municipal Administration
Development and Rejuvenation work of Deshmukh lake in Aurad.B TP
297680
DMA/2026-27/OW/WORK_INDENT57955
Open
Other Works
DMA Town Municipal Council Aurad
5 documents required · 5 mandatory
Satisfactory completed, at least one similar Nature of work such as Comprehensive Development of Lake work of value not less than Rs. 117.56Lakhs as prime contractor. (last five years i.e., 2021-22 to 2025-26) (Work Done certificate with E-procurement Indent number and issued by the officer not below the rank of Executive Engineer or Equivalent in govt. entities)
Valid Contractor License PWD Class-III& above Contractor Certificate
Executed in any one year the following minimum quantities of work. Earth work excavation or Embankment 7093.67 Cum, Stone pitching 1184 Sqm, Cement concrete PCC and RCC 193.648 Cum, SSM or Rubble stone masonry 191.304 Cum, Steel reinforcement steel structure 11.712 Tonne. in last five years i.e., 2021-22 to 2025-26
List of existing commitments and ongoing works
Total value of civl engineering works executed and payments received in the last five years (2021-22 to 2025-26)
List of works for which tenders already submitted
Achieved in at least two financial years a minimum financial turnover of Rs.399.98 Lakhs (last five years i.e., 2021-22 to 2025-26)
Liquid assets and or availability of credit facilities of no less than Rs.59.78Lakhs Unconditional Credit lines/ letters of credit/ certificates from banks for meeting the fund requirement etc. As per the format provided in tender document
Banker Details for reference
Reports on the financial standing of the tenderer, such as profit and loss statements and auditors reports for the last five years
List of Financial Resources with Certificates
Not Applicable
List of Ongoing works
Not Applicable
Not Applicable
₹5,000
₹2.0 L
2 Jun 2026
2 Jun 2026
7 Jul 2026
4 Jul 2026
3 Jul 2026
Improvement of Main Bund
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut ...
Mechanical Means -
Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm a...
Earth work excavation by manual means for drains, canals, waste weir, draft, approach channels, key trenches, foundation of Buildings & bridges and such simillar works in all kinds of...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates ...
Providing Size Stone masonry with hard stone in foundation & plinth with
Cement mortar 1:6 (1 cement : 6 coarse sand)
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates ...
Earth work excavation by manual means for drains, canals, waste weir, draft, approach channels, key trenches, foundation of Buildings & bridges and such simillar works in all kinds of...
Kerb Stones - Supplying and fixing M15 grade precast cement concrete Kerb stones for Roadway, Sidewalls and gutters fixed with CM 1:3 fixed and finsihed in line as per direction of Engineer i...
Providing Water based glossy paint (Green certified product) to Kerb Stones as per IS 164:2015 technical specifications including cleaning & surface preparation. Ref to MoRT&H : IRC - IS 164:2015
Removing disturbed rough / size stone revetment 300 mm thick with 150 mm thick 40 mm down aggregate backing and resetting the same using the available stones and fresh aggregate from quarry including ...
Providing and constructing 450 mm thick hand packed rough stone revetment consisting of 300 mm thick rough stones with 400 to 450 mm long through stones at 1.5 m c / c over a backing of 150 mm thick 4...
Providing and laying Hariyala or other approved quality turfing sods for the slopes of earthen embankments over 20 mm thick sand backing including cost of all materials, machinery,labour including pre...
Providing casing embankment using semi-pervious / pervious approved soil from borrow areas in layers of 250 to 300 mm ( before compaction ) including cost of all materials, machinery, labour, all othe...
Formation of Pheripherial Bund
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut ...
Cost of Haulage Excluding Loading and Unloading - Case-1 : Surfaced Road - Taking output 18 t load and lead 10 km = 180 t.km
De-silting of Feeder Channel/Canal in dry condition by excavating the deposited bed material and disposing off the same by stacking/ formation of Embankment or as directed including cost of all machin...
De-silting of Feeder Channel/Canal in dry condition by excavating the deposited bed material and loading the same to transport vehicle ( excluding cost of transportation ) including cost of all machin...
Providing casing embankment using semi-pervious / pervious soil collected in embankment area in heaps as part of disposal of excavated soil from canal in layer of 250 to 300 mm (before compaction) inc...
Providing casing embankment using semi- semi-pervious / pervious approved soil from borrow areas in layers of 250 to 300 mm ( before compaction) including cost of all materials, machinery, labour, all...
Providing and laying Hariyala or other approved quality turfing sods for the slopes of earthen embankments over 20 mm thick sand backing including cost of all materials, machinery,labour including pre...
Construction of Inlet Box Culvert
Mechanical Means -
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, stru...
Mechanical Means -
Providing and Filling in foundation with granite / trap broken metal 100mm. and down size & with approved sand including hand packing, ramming, watering, including cost of all mater...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates ...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates ...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works fro...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works fro...
Providing Size Stone masonry with hard stone in foundation & plinth with
Cement mortar 1:6 (1 cement : 6 coarse sand)
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with PVC Pipe 110mm outer dia at 2 kg per m2, extending through the fu...
Back filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification - Granular material. Ref to MoRT&H : IRC - 710.1...
PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification. Ref to MoRT&H : IRC - 2700
Reinforced cement concrete M30 grade for approach slab including reinforcement and formwork complete as per drawing and Technical specification (Batching Plant). Ref to MoRT&H : IRC - 15...
Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and ...
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tyin...
Providing and constructing size stone pitching using 200 to 250 mm
size stones with pin headers at 2 per m2 set in CM 1 : 5 proportion
by volume with pointing joints in CM 1 : 3 proportio...
Providing and constructing dry rubble rock-toe using rubble and stone chips from approved source including cost of all materials, machinery, labour, hand packing rubble and stone chips, finishing to...
Construction of Sluice Gate
Mechanical Means -
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, stru...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates ...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works fro...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works fro...
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with PVC Pipe 110mm outer dia at 2 kg per m2, extending through the fu...
Back filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification - Granular material. Ref to MoRT&H : IRC - 710.1...
Providing Size Stone masonry with hard stone in foundation & plinth with
Cement mortar 1:6 (1 cement : 6 coarse sand)
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates ...
Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and ...
Providing and constructing load bearing wall with Solid Concrete blocks of size 400x150x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 con...
Providing 12 mm cement plaster with cement mortar 1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including co...
Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) and a top layer 6 mm thick cement plaster with cement mortar 1:3 ...
Providing & fixing of 2-track x 2-panel sliding windows made out of multi chambered UPVC (Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic...
Providing and fixing in position collapsible steel shutters with vertical channels 20x10x2 mm and braced with flat iron diagonals 20x5 mm size, with top and bottom rail of T-iron 40x40x6 mm, w...
Providing and fixing Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural ...
Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :Two coats on new work over an under coat of suitable shade with ordinar...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works fro...
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tyin...
Design, fabrication, supply, erection and commissioning of embedded
parts consisting of sill beam, wheel tracks, seal seats, guide rails, gate
groove liners with all accessories for pump house in...
Design, fabrication, supply, erection, testing and commissioning
of sliding type stoplog gate consisting of skin plate, horizontal and
vertical girders, lifting hooks, bronze padded slide b...
Supplying heavygaugePVCconduitpipe......mmdia..........mmthick
confirming toIS2509withsuitablesizebends,metal/PVCJunction
boxes,adhesivepasteetc.,andrunningbeforeconcretingtheslab. The
conduit shouldb...
Supplyingand fixing regularMCBdistributionboards onwall/ood
board/ flushmountingusingrequiredclamps, bolts, nuts etc.,with
provision for fixing suitable type capacityMCB's single phase/3
phase/singled...
Supplying, fixing andwiringResidualcurrentcircuitbreaker(RCCB)
240/450V upto 300mA sensitivity on existing wood/ panel board 32-40A 2 pole PWD ESR 2023-24 , P.18, Sl no 5.20.4
Mediumpointabove3Mtrupto6Mtrfromtappingpoint toout letvia
switch box PWD ESR 2023-24 , P.5, Sl no 2.2.2
Wiringfor lighting/powercircuitusingoneof FRLSPVCinsulated
1100Vgrade,multistrandcopperwirewithlowconductor resistance
singlecore inopenorconcealedsystemofwiringwithspecifiedIS
694:2010 4 mm2 PWD ESR ...
Supplying6Aflushtypesocket and6Aflush typeSPswitcheither
surface/flushmountinginexistinggangboxor in 4mmthickplastic
sheet andfixingover aflushmountedwoodenboxandwiringusing
necessary capacity wires a...
Supplying And fixing/replacing of 6/16/32A electrical
accessories on existing switch board 6A Bell Push PWD ESR 2023-24 , P.10, Sl no 3.14.9
Supplying And fixing/replacing of 6/16/32A electrical
accessories on existing switch board16/6A combined plug and socket with control switch PWD ESR 2023-24 , P.10, Sl no 3.14.15
Supplying of recess mounting non integrated type LED down
light.W luminaire comprising of pressure de cast/ extruded
tobeintegratedinthecircuit,THDlessthan20%,LifeasperLM79.
The operating i...
Raising of Marihal bamboo(Oxyten anthera stocksii)in Nursery beds of12Mx 1.20 M size a).Formation new beds
c).Application of ingredients (Manure and Sand) Bamboo Fencing- 50 plants in 1 bed
d) Purchase of Marihal bamboo (Delivery at Nursery site) Bamboo Fencing- 50 plants in 1 bed
e) Preparation of Marihal bamboo cuttings
c) Excavation of pits with vertically cut edges to make an uniform cube and heaping the excavated soil (1/3rd top soil on the upper side & 2/3rd on the lower side for (ii) Hard Soil Bamboo Fencing- 50...
g) Watering the beds twice a day
h) Weeding the seed beds / transplant beds
a) Digging of bamboo beds, uprooting of 1 to 2 year old bamboo Rhizomes, (without causing damage) tying in bundles and loading them into the lorry at nursery site (excluding cost of bags and fibre thr...
b).Transportation of bamboo Rhizome bundles in lorry from nursery to the plantation site and unloading up to 10 km distance
c) Conveyance of bamboo Rhizome bundles from roadside to pits at the rate of 2 rhizomes per pit
d) Opening of pits, filling with red earth up to 30 cms and planting Rhizomes
a) Preparation and delivery of stakes to planting site
b) Aligning in the planting area along the contours & marking for pit (without staking)
c) Excavation of pits with vertically cut edges to make an uniform cube and heaping the excavated soil (1/3rd top soil on the upper side & 2/3rd on the lower side for (ii) Hard Soil
d) Refilling of pits, cutting of edge of the pit on the lower side and refilling 75% or 100% of the pit as the case may be with the excavated soil, duly breaking the clods & arranging the remaining so...
Providing PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joint...
Supplying Specials for internal water connections, Ball valve / Tap - 10 % cost of the pipe
Total Amount Bamboo Fencing for Amount for 25mtr Bamboo Fencing Rs.7072. for total 51.60 mtr Rs.364915.2
Total Operation and Maintenance of Lake for 5 years
Cutting and burning or disposing off Apu / Jondu from marshy areas as directed with all other ancillary operations complete.
Providing cleaning Labour (UN SKILLED) for daily housekeeping activities such as cleaning of debris/floating waste from silt traps, sweeping of pathway, watering of plantation, maintaining of garden/l...
Providing cleaning Labour (UN SKILLED) for daily housekeeping activities such as cleaning of debris/floating waste from silt traps, sweeping of pathway, watering of plantation, maintaining of garden/l...
Providing Tractor-trolley for shifting of debris/silt/other materials with driver
Providing Backhoe loader 1m3 capacity for Cleaning purpose with driver
Cost of Haulage Excluding Loading and Unloading . Case-1 : Surfaced Road. B. Taking output 18 tonne load and lead of 15 km is considered.(Unit Tonne KM)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
DK 57955 KW-4.doc
Tender Document • 0.41 MB
Download all tender documents and submit your bid