| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹18.2 LAdmitted-Finance | +21.49% | ₹18.2 L | L1 | Admitted-Finance |
Tender Value
₹15 L
EMD Value
₹30,000
Closing Date
14 May 2026, 11:00 amClosed
EXECUTIVE ENGINEER BDA BIKANER
BDA CAMPUS BIKANR
E-BID-01-2026-27 WORK NO 05
2026_UITBK_555745_5
E-BID-01-2026-27
Open Tender
Civil Works
60 days
BIKANER
E-BID-01-2026-27 WORK NO 05
2 documents required · 2 mandatory
₹1,000
SECRETARY BDA BIKANER
₹30,000
Yes
27 May 2026
2 May 2026
14 May 2026
2 May 2026
14 May 2026
2 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In cement mortar. | 15 | CUM | 538 | ₹8,070 |
| 2 | Brick work with F.P.S. bricks of class designation 75 in superstructure above plinth level upto floor V level in all shapes and sizes in : Cement mortar 1 : 6 (1 cement : 6 coarse sand) | 60 | CUM | 5,250 | ₹3,15,000 |
| 3 | Providing and fabricating reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding (including cost of binding wire) all complete up to floor five level. ('Original producers' who manufacture billet directly from iron ores and roll the bilets to produce steel conforming to IS:1786) | 5,800 | KG | 77 | ₹4,46,600 |
| 4 | Centering and Shuttering with plywood or steel sheets including strutting, propping bracing both ways and removal of formwork for foundation , footings, strap beam, raft , bases of columns etc. Suspended floors, roofs, landings, staircases, balconies, girders, cantilevers, bands, coping bed plates, anchor blocks, sills, chhajjas, lintel, beam, plinth beam etc. | 380 | sqm | 340 | ₹1,29,200 |
| 5 | Providing and laying in position specified grade of cement concrete for RCC structural elements upto floor five level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers (if required ) excluding the cost of centering, shuttering and reinforcement for Walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc.M20 grade Nominal Mix / Design Mix | 10 | cum | 5,609 | ₹56,090 |
| 6 | Providing and laying in position specified grade of cement concrete for RCC structural elements upto floor five level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers( if required) excluding the cost of centering, shuttering and reinforcement for Beams,suspended floors, roofs, griders having slopes up to 15º,landings, balconies, shelves, chajjas, lintels, bands, plain windows sills, staircases and spiral staircases etc.M20 grade Nominal Mix / Design Mix | 50 | cum | 5,185 | ₹2,59,250 |
| 7 | Plaster on new surface on walls in cement sand mortar 1:4 including racking of joint etc. complete fine finish :20mm thick. | 910 | SQM | 202 | ₹1,83,820 |
| 8 | Providing and applying white cement based putty over plastered surface to prepare the surface even and smooth complete New Plastered Surface (three or more coats) | 450 | SQM | 84 | ₹37,800 |
| 9 | Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade including all scaffolding:New work (two or more coats) over and including scrapping and priming coat with cement primer. | 910 | SQM | 75 | ₹68,250 |
| 10 | Precast terrazo tiles of approved make, 20mm thick with marble chips of size upto 6mm laid in floors, and landing, jointed with neat cement slurry mixed with pigment to match the shade of the tiles, including rubbing and polishing complete on 20mm thick bed of cement sand mortar 1 : 4. Light shade using white cement. | 230 | SQM | 542 | ₹1,24,660 |
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.45 MB
BOQ_989695.xls
BOQ • 0.33 MB
CON05.pdf
Tender Documents • 3.03 MB
Download all tender documents and submit your bid