Loading…
Loading…
Tender Value
Refer Docs
Closing Date
21 Sept 2026, 3:00 pm
CPO-EAST ZONE
THIS TENDER IS FOR RVI CANOPY MAINTENANCE AND REPAIR WORKS AT RETAIL OUTLETS
2600027859-HD-07600
5100027859
Two Bid
Dibrugarh, Assam
10 Sept 2026
10 Sept 2026
21 Sept 2026
21 Sept 2026
12 Sept 2026 - 19 Sept 2026
15 Sept 2026
| Item No | Item Title | Description | Qty | Unit |
|---|---|---|---|---|
| 1 | ATTENDING TO M & R CALL 0- | ATTENDING TO M & R CALL 0- — M AND R CALL 0-50 KM ONE TIME: ATTENDING TO M AND R CALLS ON ADVICE OF SALES OFFICERS OR HPCL FOR ATTENDING COMPLAINTS AT OUTLETS RELATED TO DU PROBLEMS AND OTHER PIPELINE AND ELECTRICAL PROBLEMS. THE PARTY IS REQUIRED TO CARRY OUT JOB RELATED FULL INVESTIGATION AND JOB COST ESTIMATE AND TAKE APPROVAL FROM HPCL FOR RECTIFYING THE SAME. (THIS ITEM IS FOR OUTLETS LOCATED WITHIN 0-50 KM FORM SALES OFFICERS STATION OR FITTER'S STATION WHICHEVER IS NEARER. NOTE: THIS CHARGES WILL BE PAID ONLY ON ONE TIME BASIS OF COMPLAINT ATTENDING AND INVESTIGATION WHERE PROBLEMS ARE NOT IDENTIFIED BY HPCL OFFICERS. THE PARTY MUST TAKE PRIOR APPROVAL WHILE EXECUTING THIS ITEM. PARTY SHOULD ALSO NOTE THAT IN CASE OF PROBLEM AT THE PARTICULAR OUTLET BEING REPETITIVE IN NATURE, NO REPETITIVE CLAIM WILL BE ENTERTAINED. | - | Each |
| 2 | ATTENDING M & R CALL 50- | ATTENDING M & R CALL 50- — M AND R CALL 50-150 KM ONE TIME: ATTENDING TO M AND R CALLS ON ADVICE OF SALES OFFICERS OR HPCL FOR ATTENDING COMPLAINTS AT OUTLETS RELATED TO DU PROBLEMS AND OTHER PIPELINE AND ELECTRICAL PROBLEMS. THE PARTY IS REQUIRED TO CARRY OUT JOB RELATED FULL INVESTIGATION AND JOB COST ESTIMATE AND TAKE APPROVAL FROM HPCL FOR RECTIFYING THE SAME. (THIS ITEM IS FOR OUTLETS LOCATED WITHIN 50-150 KM FORM SALES OFFICERS STATION OR FITTER'S STATION WHICHEVER IS NEARER. NOTE: THIS CHARGES WILL BE PAID ONLY ON ONE TIME BASIS OF COMPLAINT ATTENDING AND INVESTIGATION WHERE PROBLEMS ARE NOT IDENTIFIED BY HPCL OFFICERS. THE PARTY MUST TAKE PRIOR APPROVAL WHILE EXECUTING THIS ITEM. PARTY SHOULD ALSO NOTE THAT IN CASE OF PROBLEM AT THE PARTICULAR OUTLET BEING REPETITIVE IN NATURE, NO REPETITIVE CLAIM WILL BE ENTERTAINED. | - | Each |
| 3 | ATTENDING M & R CALL 150- | ATTENDING M & R CALL 150- — M AND R CALL 150-300 KM ONE TIME: ATTENDING TO M AND R CALLS ON ADVICE OF SALES OFFICERS OR HPCL FOR ATTENDING COMPLAINTS AT OUTLETS RELATED TO DU PROBLEMS AND OTHER PIPELINE AND ELECTRICAL PROBLEMS. THE PARTY IS REQUIRED TO CARRY OUT JOB RELATED FULL INVESTIGATION AND JOB COST ESTIMATE AND TAKE APPROVAL FROM HPCL FOR RECTIFYING THE SAME. (THIS ITEM IS FOR OUTLETS LOCATED WITHIN 150-300 KM FORM SALES OFFICERS STATION OR FITTER STATION WHICHEVER IS NEARER. NOTE: THIS CHARGES WILL BE PAID ONLY ON ONE TIME BASIS OF COMPLAINT ATTENDING AND INVESTIGATION WHERE PROBLEMS ARE NOT IDENTIFIED BY HPCL OFFICERS. THE PARTY MUST TAKE PRIOR APPROVAL WHILE EXECUTING THIS ITEM. PARTY SHOULD ALSO NOTE THAT IN CASE OF PROBLEM AT THE PARTICULAR OUTLET BEING REPETITIVE IN NATURE, NO REPETITIVE CLAIM WILL BE ENTERTAINED. | - | Each |
| 4 | SUPPLYING&TRNSPT,FBRCTN 7040-GUWAHATI RETAIL RO | SUPPLYING&TRNSPT,FBRCTN 7040-GUWAHATI RETAIL RO — "SUPPLYING, TRANSPORTING, FABRICATING, ERECTING IN POSITION IN POSITION OF PRE- FABRICATED STEEL STRUCTURES AT ALL ELEVATIONS FOR CANOPY USING STRUCTURAL STEEL SECTIONS ISMB/ISMC/ISA CONFORMING TO IS:2062 AND IS 226 , INCLUDING CUTTING, WELDING OR BOLTING, SUPPLY OF BOLTS/NUTS/WASHERS ETC., COMPLETE AS PER DRAWINGS INCLUDING SURFACE PREPARATION AND APPLYING ONE COAT OF ZINC PHOSPHATE PRIMER BEFORE ERECTION, ONE COAT AFTER ERECTION AND TWO COATS OF SYNTHETIC ENAMEL PAINT AS PER SPECIFICATION AFTER ERECTION AND ALL MATERIALS AND LABOUR COMPLETE. ( NO WELDING IS PERMITTED AT SITE). THE RATE QUOTED SHALL INCLUDE COST OF BOLTS, NUTS, WASHERS, WELDING AND ELECTRODES AND ANY OTHER CONSUMABLES REQUIRED FOR COMPLETING THE WORK. NUT BOLTS SHALL NOT BE CONSIDERED FOR PAYMENT.THEORETICAL WIGHT OF STEEL SECTIONS SHALL BE CONSIDERED FOR PAYMENT..(.(NO MEASUREMENT SHALL BE TAKEN FOR NUT,BOLT,WASHER SPLICE PLATE & GUSSET PLATE) " | - | Metric ton |
| 5 | DISMANTLING - | DISMANTLING - — "PROVIDING & FIXING FOLLOWG. SIZE MEDIUM DUTY GI PIPES OF APPROVED MAKE CONFORMING TO IS-1239 CONCEALED IN THE WALLS/UNDER THE CONCRETE FLOORS INCLUDING MAKING CHASES IN THE WALLS/CONCRETE FLOORS,FIXING WITH CLAMPS AT EVERY 1M C-C, NECESSARY TEES,BENDS,ELBOWS,PLUGS,NIPPLES,UNIONS,TESTING OF PIPELINES FOR LEAKS UPTO A PRESSURE OF 6 KG/SQ CM , PAINTING THE PIPES WITH HOT BITUMEN, WRAPPING THE PIPES WITH HESSIAN CLOTH AND MAKING CHASES OF THE WALLS GOOD AFTER PIPING COMPLETE." | - | Metric ton |
| 6 | ERECT OF STRL STEEL | ERECT OF STRL STEEL — ERECTION OF CANOPY WITH HPCL SUPPLIED STRUCTURAL STEEL: ERECTION OF HPCL SUPPLIED STRUCTURAL STEEL MATERIAL TO THE EXISTING CANOPY STRUCTURE WITH NEW NUTS AND BOLTS AND ENAMEL PAINTING IF NECESSARY TO THE STEEL AS DIRECTED BY THE ENGINEER-IN- CHARGE AND THE CONSULTANT. JOB INCLUDES DISMANTLING STEEL WORK IN BUILT UP SECTIONS IN ANGLES, TEES, FLATS AND CHANNELS INCLUDING ALL GUSSET PLATES, BOLTS, NUTS, CUTTING RIVETS, WELDING ETC COMPLETE AS DIRECTED BY ENGINEER-IN-CHARGE. | - | meter |
| 7 | DISMANTLING - | DISMANTLING - — DISMANTLING AND REMOVAL OF THE CANOPY/HORDING PROVIDED ON THE OUTLET AND RE-FIXING THE SAME ON THE OUTLET AFTER COMPLETION OF JOB AS PER FIXING SPECIFICATION. | - | Kilometer |
| 8 | PROVIDING&INSTALLING,RBD | PROVIDING&INSTALLING,RBD — "PROVIDING AND INSTALLING ROOFING RIBBED ROOFING SYSTEM MANUFACTURED WITH HIGH STRENGTH STEEL GRADE OF G550( 550MPA) OF ZINCALUME STEEL OR APPROVED EQUIVALENT BARE GALVALUME HIGH TENSILE COLD ROLLED STEEL AS PER ASTM 117 A792M /AS 1397 COATING CLASS AZM 150 ( MINIMUM 150 GM/SQM ZINC-ALUMINIUM ALLOY COATING MASS TOTAL OF BOTH SIDES),OF YIELD STRENGTH 550 MPA THICKNESS OF BARE METAL (BCT): 0.40MM ,TOTAL COATED THICKNESS(TCT) : 0.45 MM .APPROXIMATE MASS OF ROOFING SHEET SHALL BE 4.17 KG/SQM. PANELS SHALL BE OF MIN. 900 MM WIDE AND MIN. CORRUGATION DEPTH OF 38 MM WITH VARYING LENGTHS AS PER SITE REQUIREMENTS RATE SHALL BE INCLUDING LAYING OF SHEETS WITH APPROVED FASTENERS AND ALSO ALL WEATHER SEALANT TAPE AS PER MFR'S RECOMMENDATIONSAND ALSO PROVIDING RIBBED GALVALUEME RIDGE PIECES OF THE SAME CLASS AS OF THE MATCHING CORRUGATION PROFILE OF THE ROOFING SYSTEM AS RECOMMENDED BY THE MFR.AND , HORIZONTAL/VERTICAL FLASHING NEAR ILLUMINATED BANDING ." | - | square meter |
| 9 | DISMAN EXISTING ROOFING | DISMAN EXISTING ROOFING — "PROVIDING AND FIXING 3M MAKE LINEAR DELINEATION SHEETING (LDS) COMPRISING OF PANELS OF SIZE 4"" WIDE AND 33"" LENGTH IN YELLOW COLOUR. THE PANEL IS TO BE CONSTRUCTED OF CUBE CORNER RETRO REFLECTIVE MATERIAL BONDED TO ALUMINIUM SUBSTRATE WITH MEMMED LATERAL EDGES. THE PANEL ASSEMBLY SHALL HAVE A REPEATING RAISED LATERAL RIDGE EVERY 2.25 INCH, 0.34 INCH IN HEIGHT. THE TYPICAL RETRO REFLECTIVE VALUES AT 88.5 DEGREE ENTRANCE ANGLE / 0.2 DEGREE OBSERVATION ANGLE TO BE 270, 162, 11080 (CANDELAS/ METER SQUARE / LUX) OF YELLOW COLOUR. THE FITTING WILL BE DONE ON BRICK MASONRY/CONCRETE WALLS AS PER MANUFACTURER SPECIFIED PROCEDURES AND APPROVED NAILS/FIXTURES IN LINE AND LEVEL AS PER ADVICE OF ENGG.-IN-CHARGE (EIC). POWDER COATED MS ANGLE EDGE PROTECTION SHALL BE PROVIDED TO MAKE IT THEFT RESISTANT. MEASUREMENT AND PAYMENT SHALL FOR PER NO. OF 33INCH LONG AND 4"" WIDE LDS PROVIDED AS PER EIC ADVICE. (REFER ATTACHED DRAWING)" | - | square meter |
| 10 | REFIXING OF CANOPY ROOF | REFIXING OF CANOPY ROOF — CANOPY ROOF SHEET REFIXING. | - | square meter |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
2600027859-HD-07600.pdf
TENDER_DOCUMENT • 29.97 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .