Tender Value
₹2.1 Cr
EMD Value
₹4.3 L
Closing Date
15 Jul 2026, 3:00 pm
Similar tender results from the same govt authority in the past 3 years.
1) Electrification of Unwired pit lines/sidings of Solapur Division. 2) Electrical TRD portion of work in connection with the proposed construction of 2 lane ROB in lieu of LC-40 at km 387/3-4 and LC-42 at km 391/8-9 of Daund- Solapur section in Solapur Division.
SUR-TD-T-2026-14R
SUR-TD-T-2026-14R
Open
12 Months
Solapur, Maharashtra
₹0
₹4.3 L
17 Jun 2026
17 Jun 2026
1 Jul 2026
01-Schedule Items
Item Breakup - 01-Schedule Items
Per Track Erection KM Total 88382.04 Supply and installation of SWR boards and Flexi sheets (Fixed on Decolumn sheets) at nominated Item- 02 places S No. Item Description of Item Unit Qty Rate Amount No
Square Erection Foot Total 348501.80 Item- 03 Cement concrete for foundation & plinth in other than hard soil & rock S No. Item Description of Item Unit Qty Rate Amount No
Erection Total 2194380.40 Item- 04 Cement concrete for foundation & plinth in hard soil & rock. S No. Item Description of Item Unit Qty Rate Amount No
Erection Total 447141.00 Item- 05 Supply of galvanised steel for structures S No. Item Description of Item Unit Qty Rate Amount No
Supply Total 3415344.75 Item- 06 Erection of galvanised steel for structures S No. Item Description of Item Unit Qty Rate Amount No
Erection Total 300589.92 Item- 07 Supply of galvanised small parts steel (SPS). S No. Item Description of Item Unit Qty Rate Amount No
Supply Total 1427974.68 Item- 08 Erection of galvanised small parts steel (SPS). S No. Item Description of Item Unit Qty Rate Amount No SOLAPUR DIVISION-ELECTRICAL/CENTRAL RLY
Erection Total 160123.92 Supply, Erection, Testing & Commissioning Guy rod Assembly (9.7/9.3/5.35) of all sizes complete Item- 09 with all fittings. S No. Item Description of Item Unit Qty Rate Amount No
Erection Total 212474.15 Supply, fabrication and erection of single bracket / cantilever assembly suitable for conventional Item- 10 OHE including ST & BT insulator. S No. Item Description of Item Unit Qty Rate Amount No
Erection Total 1824661.60 Supply & erection of Over head equipment ie contact & catenary (excluding cost of Supply of contact & catenary wires) jumper wire ,dropper wire ,contact/catenary clips fasteners and all other Item- 11 material required at turn out / overlaps / diamond crossings etc for commissioning of conventional OHE. S No. Item Description of Item Unit Qty Rate Amount No
Erection Total 184299.72 Item- 12 "Supply and erection of Anticreep arrangement for OHE. (Catenary wire will be supplied by Rly.) " S No. Item Description of Item Unit Qty Rate Amount No
Erection Total 51023.08 Supply, Erection, Testing & commissioning of materials for double OHE termination of conventional Item- 13 OHE complete with 9T porcelain insulator 1050 mm CD. S No. Item Description of Item Unit Qty Rate Amount No
Erection Total 24549.46 Item- 14 Splicing & extension of anchored overhead equipment. S No. Item Description of Item Unit Qty Rate Amount No
Erection Total 23310.60 Item- 15 Transfer of equipment from one mast or support to another including old bracket removal S No. Item Description of Item Unit Qty Rate Amount No
Erection Total 205425.00 Supply, Erection, Testing & commissioning of additional fittings at a turnout, diamond crossing & Item- 16 overlap. S No. Item Description of Item Unit Qty Rate Amount No
Erection Total 17622.84 Supply, Erection, Testing & commissioning of 9T solid core suspension porcelain insulator 1050 mm Item- 17 CD. S No. Item Description of Item Unit Qty Rate Amount No
Supply SOLAPUR DIVISION-ELECTRICAL/CENTRAL RLY
Erection Total 111235.20 Item- 18 Supply and erection of long Creepage post insulator. S No. Item Description of Item Unit Qty Rate Amount No
Erection Total 195579.80 Supply, Erection, Testing & commissioning of 3 Pulley Regulating Equipment assembly complete Item- 19 with all fittings for conventional OHE (Ref RDSO Spec. NO. TI/SPC/OHE/ATD/0060 with A&C slip no. 1&2 or latest) S No. Item Description of Item Unit Qty Rate Amount No
Erection Total 302220.52 Supply, Erection, Testing & commissioning of section insulator assembly conventional complete Item- 20 with all fittings and 9T porcelain insulator 1050 mm CD. (RDSO spec. No. ETI/OHE/27 (8/84) with A&C slip no.1 or latest.) S No. Item Description of Item Unit Qty Rate Amount No
Erection Total 215585.64 Item- 21 Supply and erection of a 25KV, 1250A rated single pole isolator assembly with earth heel. S No. Item Description of Item Unit Qty Rate Amount No
Erection Total 306565.68 Item- 22 Slewing of OHE S No. Item Description of Item Unit Qty Rate Amount No
Each Erection Span Total 542123.00 Supply & erection of single earth electrode with earth pit complete as per RDSO Drg. No. Item- 23 ETI/OHE/P/7020 or latest S No. Item Description of Item Unit Qty Rate Amount No
Erection Total 264402.40 Item- 24 Supply & Erection of Galvanized traction bond. S No. Item Description of Item Unit Qty Rate Amount No
Erection Total 441936.00 Item- 25 Supply & erection of GI Nut Bolt 16x50x38 mm. S No. Item Description of Item Unit Qty Rate Amount No
Erection Total 32137.00 Item- 26 Supply and Erection of caution/warning/Sigma Board for OHE S No. Item Description of Item Unit Qty Rate Amount No
Supply SOLAPUR DIVISION-ELECTRICAL/CENTRAL RLY
Erection Total 320381.15 Supply, Erection, Testing & commissioning of Retro-reflective number plates on structures. RDSO Item- 27 Spec.No. ETI/OHE/P/7503 S No. Item Description of Item Unit Qty Rate Amount No
Erection Total 168274.80 Item- 28 Painting of Rail marking, New implantation, height & stagger on structure. S No. Item Description of Item Unit Qty Rate Amount No
Erection Total 6859.00 Item- 29 Hiring of 15T crane on hourly basis S No. Item Description of Item Unit Qty Rate Amount No
Erection Total 41520.36 Item- 30 Hiring of JCB S No. Item Description of Item Unit Qty Rate Amount No
Erection Total 46632.30 Supply, Fabrication & erection of dropper assembly (conventional OHE) including removal of old Item- 31 droppering. S No. Item Description of Item Unit Qty Rate Amount No
Each Supply Span
Each Erection Span Total 207226.00 Supply, erection, oil filtration & testing of 25KV/240V/25 KVA Auxiliary Transformer complete with Item- 32 accessories like 25kv DO fuse assembly, Anti-climbing device, jumper and its fittings, 9-tonne cut-in insulators, Earthing station etc S No. Item Description of Item Unit Qty Rate Amount No
Erection Total 1081920.56 Item- 33 Providing LT junction box for AT S No. Item Description of Item Unit Qty Rate Amount No
Erection Total 176818.50 Item- 34 Providing 100mm diameter CI pipe under track by pushing method. S No. Item Description of Item Unit Qty Rate Amount No
Erection Total 651882.00 Item- 35 Providing LT cable marker S No. Item Description of Item Unit Qty Rate Amount No
Erection Total 2403.20 Item- 36 Provision of Auto Change over power panel for AT/ Local supply 150A S No. Item Description of Item Unit Qty Rate Amount No SOLAPUR DIVISION-ELECTRICAL/CENTRAL RLY
Supply & Erection Total 545701.16 Item- 37 Supply of 2 core 150sq.mm LT XLPE cable S No. Item Description of Item Unit Qty Rate Amount No
Supply Total 872165.00 Item- 38 Excavation of trench and laying of cable in open yard as per specification. S No. Item Description of Item Unit Qty Rate Amount No
Erection Total 243705.00 Item- 39 Excavation of cable across track/road, laying of cable in pipe as per specification. S No. Item Description of Item Unit Qty Rate Amount No
Erection Total 60680.00 Item- 40 Supply and fixing of RCC hume pipe 150 mm dia 2 mtrs long with one collar as per specification. S No. Item Description of Item Unit Qty Rate Amount No
Erection Total 50822.00 Item- 41 Provision of Horizontal drilling for track crossing. S No. Item Description of Item Unit Qty Rate Amount No
Erection Total 297229.00 Item- 42 Supply of Industrial Heavy Duty Portable Welding Machine. S No. Item Description of Item Unit Qty Rate Amount No
Supply Total 17400.00 Item- 43 Supply of Battery powered crimping tool, Crimping Force 50 kilonewton. S No. Item Description of Item Unit Qty Rate Amount No
Supply Total 62370.00 Item- 44 Supply of Portable Rail drilling machine. S No. Item Description of Item Unit Qty Rate Amount No
Supply Total 74096.58 Item- 45 Supply of Portable DG Set 3 KVA, 1 Phase S No. Item Description of Item Unit Qty Rate Amount No
Supply Total 495999.00 Supply of Hand Held Brush Cutter Battery Powered Electric Motor Brush Cutter with Cutting Blade/ Item- 46 Circular Saw Attachment. S No. Item Description of Item Unit Qty Rate Amount No
Supply Total 106200.00 Supply of Impact Torque Wrench along with two Batteries ( 5.0 AH), Fast Charger (18V) and Item- 47 Storage case. S No. Item Description of Item Unit Qty Rate Amount No SOLAPUR DIVISION-ELECTRICAL/CENTRAL RLY
Supply Total 69620.00 Supply, Erection, Testing & commissioning of cable avoidance tool kit or cable detector suitable for Item- 48 detecting and route tracing of buried cable, pipe etc. with all accessories necessary for detector of cable pipe meter. S No. Item Description of Item Unit Qty Rate Amount No
Supply Total 941286.00 Item- 49 Transportation of release material S No. Item Description of Item Unit Qty Rate Amount No
Erection Total 4424.00 Item- 50 Supply & spreading of stone metal 25mm in substation. S No. Item Description of Item Unit Qty Rate Amount No
Erection Total 322246.00 Removing of Electrical TRD bonds and erection of the bonds as per RDSO Drawing and Item- 51 specifications. S No. Item Description of Item Unit Qty Rate Amount No
Erection Total 4481.00 Measurement of Height on each dropper in one span. Measurement of stagger & implantation on Item- 52 structure before & after the Engineering track related work. S No. Item Description of Item Unit Qty Rate Amount No
Each Erection Span Total 72974.50 Stenciling of rail level, implantation, MRL, ERL telephone sockets & location number etc. (with Item- 53 paint) S No. Item Description of Item Unit Qty Rate Amount No
Erection Total 6358.00 Item- 54 Modification of catenary wire with false contact wire (contact wire will be supplied by railway). S No. Item Description of Item Unit Qty Rate Amount No
Erection Total 48931.50 Item- 55 Change of encumbrance / redropping of spans. S No. Item Description of Item Unit Qty Rate Amount No
Each Erection Span Total 114310.80 Item- 56 Supply & Erection of copper jumper (all types of "G" jumper) S No. Item Description of Item Unit Qty Rate Amount No
Erection Total 188277.60 Item- 57 Supply of heat shrinkable straight through joint kit S No. Item Description of Item Unit Qty Rate Amount No
Supply SOLAPUR DIVISION-ELECTRICAL/CENTRAL RLY Total 56300.20 Item- 58 Dismantling of 25 KV/230V, 10 KVA LT supply transformer including its accessories. S No. Item Description of Item Unit Qty Rate Amount No
Erection Total 16372.52 Dismantling of existing control & distribution Panel with auto change over Switch, for CLS supply, Item- 59 complete with box, including disconnection of cable connection. S No. Item Description of Item Unit Qty Rate Amount No
Erection Total 1861.03 Transporting and supply and installation of concrete (RCC) route indicators at intervals of 50 Item- 60 meters as per technical specification. S No. Item Description of Item Unit Qty Rate Amount No
Erection Total 122022.00 Item- 61 Power block charges @ 100 % extra on erection charges S No. Item Description of Item Unit Qty Rate Amount No
Erection of galvanised small parts steel (SPS).
Erection, Testing & Commissioning Guy rod Each Assembly (9.7/9.3/5.35) of all sizes complete with all fittings.
Erection of single bracket / cantilever assembly Each suitable for conventional OHE including ST & BT insulator.
Transfer of equipment from one mast or Each support to another including old bracket removal
Erection of dropper assembly (conventional Each OHE) including removal of old droppering. Span
Each Slewing of OHE Span
Modification of catenary wire with false contact Metre wire (contact wire will be supplied by railway).
Each Change of encumbrance / redropping of spans. Span
Erection of copper jumper (all types of "G" Numbers jumper) Total 653016.60
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
ProformaD.pdf
ATTACHMENT
ChecklistNew_1.pdf
ATTACHMENT
GCC_April-2022_2022.pdf
ATTACHMENT
GCCCCS1-11-compressed.pdf GCC correction slips
ATTACHMENT
Tenderbooklet2026-14R.pdf
ATTACHMENT
GCCCCS1-11-compressed.pdf
ATTACHMENT
Download all tender documents and submit your bid