| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹60.4 LAccepted-AOC | L1 | Accepted-AOC L1 BIdder. Hence Accepted | |
| 2 | L2₹63.4 L+₹2.9 L (4.88%)Rejected-AOC 1ST 2ND FLOOR PLOT NO 13 C 13 3 RAMA ROAD SIDE INDUSTRIAL AREA NAJAFGARH ROAD DELHI 110015 INDIA | WEST | DELHI | 110015 | L2 | Rejected-AOC L2, Bidder, Hence Rejected. | |
| 3 | L3₹73.0 L+₹12.5 L (20.7%)Rejected-AOC 2 SHANTI NAGAR SECTOR 3 HIRAN MARGI UDAIPUR 313002 | UDAIPUR | UDAIPUR | RAJASTHAN | 313002 | L3 | Rejected-AOC L3, Bidder, Hence Rejected. | |
| 4 | Rejected-Technical 2 65 GORWA UDAYPARK SOCIETY REFINERY ROAD VILLAGE TOWN VADODARA CITY VADODARA VADODARA GUJARAT 390016 INDIA | VADODARA | GUJARAT | 390016 | - | Rejected-Technical Not Recommended for Opening of Cover-II |
Tender Value
₹1.0 Cr
EMD Value
₹2.0 L
Closing Date
8 Apr 2024, 6:00 pmClosed
Rajith.V
Assistant General Manager (E-E), AAI, Madurai Airport
SITC of ALCMS and allied works including all inclusive Comprehensive Maintenance Contract, at Madurai Airport. Recall
2024_AAI_185164_1
AAI/E-E/MDU-392/NIT-14/23-24
Open Tender
Electrical Works
Item Rate
120 days
New ATC Tower
Refer tender document
17 documents required · 17 mandatory
₹1,180
₹2.0 L
2 Jul 2024
26 Feb 2024
10 Apr 2024
27 Feb 2024
8 Apr 2024
27 Feb 2024
27 Feb 2024 - 5 Apr 2024
Amount
Design, supply, installation, testing & commissioning of Airfield Lighting Control through HMI, Type 'L 890 BB' to the requirements of FAA Advisory Circular No. AC 150/5345 - 56B(Current edition) and additional circuits/mechanisms/interfaces for control & monitoring of constant current regulators (CCRs) & fixed circuits such as Landing - H, Wind cone, flood light towers & beacon to make them compatible with ALCMS, data & power cabling, earthing etc., including spare PLC and I/O modules, all hardware and software, licenses & other items as required for successful operation of the system in line with the scope of work, details of equipments, specification, performance criteria etc., Two vault processor should be provided both running in parallel for redundancy in operation at new CCR Hall, one vault Processor at ATC tower complete as required. ( Does not include the cost of communication cable) including cable termination provision of SPD, media converter, etc. complete as required.
Supply of Single mode 6 core, armoured Optic Fibre Cable (OFC) (ISI marked) conforming to ITU-T G.652 and IEC- 60794 with up to date amendments, etc., complete as required. through existing HDPE pipe of 40 mm dia.
Supply of PVC insulated (Heavy Duty) control cables of following size with copper conductor, working voltage 1.1kv grade armoured cable confirming to IS:1554 (part 1) with up to date amendments etc. as required. 61 core X 2.5 Sq.mm
Supply of PVC insulated (Heavy Duty) control cables of following size with copper conductor, working voltage 1.1kv grade armoured cable confirming to IS:1554 (part 1) with up to date amendments etc. as required. 8 core X 2.5 Sq.mm
Supply of following size DWC HDPE pipe ISI marked along with all accessories like socket, bend, couplers etc. conforming to IS 14930, Part II complete with fitting and cutting, jointing etc. OD-63 mm & ID-51mm nominal
Supply of following size HDPE pipe ISI marked along with all accessories like socket, bend, couplers etc. conforming to IS 14930, Part II complete with fitting and cutting, jointing etc. OD-40 mm & ID-32mm nominal
Laying of 63 mm / 40mm dia (OD-63mm & ID-51 mm / OD - 40mm & ID - 32mm nominal) DWC HDPE pipe/50mm dia GI Pipe direct in ground (75 cm below ground level) in all type of soil/hard rock/gravel/bitumen road including excavation and refilling the trench but excluding sand cushioning and protective covering etc. complete as required.
Laying of one number PVC insulated and PVC sheathed XLPE Control cable of 1.1 KV grade Multi core cable of size not exceeding 35Sqmm in the existing RCC/ HUME/METAL/GI/HDPE/DWC pipe etc. complete as required.
Laying of OFC cable through HDPE pipe in soft soil, HUME pipe, duct & on surface etc. complete as required.
Supplying and making end termination with brass compression gland copper lugs for following size of PVC insulated and PVC sheathed / XLPE aluminium conductor cable of 1.1kV grade as required. 61C X 2.5Sq.mm
Supplying and making end termination with brass compression gland copper lugs for following size of PVC insulated and PVC sheathed / XLPE aluminium conductor cable of 1.1kV grade as required. 8C X 2.5Sq.mm
SITC of vault processor to be kept at old CCR Room, for accepting data from old ATC tower (RCD) for controlling the 09nos- CCR by providing communication signal to New CCR Room. This vault processor shall also accept communication signals from new ATC tower / CCR Room to control fixed circuits such as landing H, Wind Sock, 11 Nos- High Mast and its associated connection, terminations etc. as required.
Supplying and installing following size of perforated painted with powder coating M.S. cable trays with perforation not more than 17.5%, in convenient sections, joined with connectors, suspended from the ceiling with M.S. suspenders/ fixing on wall using MS Clamps including bolts & nuts, painting suspenders etc as required. 150mm width X 50mm depth X 1.6 mm thickness
Laying and fixing of one number PVC insulated and PVC sheathed / XLPE power cable of 1.1 KV grade of following size on cable tray as required. Upto 35 sq.mm (Clamped with 1mm thick saddle)
Providing and fixing 6SWG dia GI wire on surface or in recess for loop earthing along with existing surface/recessed conduit/submain wiring/cable as required.
Providing and fixing 25mm X 5mm G.I. Strip on surface or in recess for connections etc. as required.
All Inclusive Comprehensive Maintenance Contract (AICMC) Airfield Lighting Control through HMI, Type 'L 890 BB' to the requirements of FAA Advisory Circular No. AC 150/5345 - 56B(Current edition) and additional circuits/mechanisms/interfaces for control & monitoring of constant current regulators (CCRs) & fixed circuits all hardware and software, 4 nos of vault processors, other items as required for successful operation of the system complete as required. First Year (After Completion of 1 year DLP) (3% of item no:1 + item no:2 + item no:13)
All Inclusive Comprehensive Maintenance Contract (AICMC) Airfield Lighting Control through HMI, Type 'L 890 BB' to the requirements of FAA Advisory Circular No. AC 150/5345 - 56B(Current edition) and additional circuits/mechanisms/interfaces for control & monitoring of constant current regulators (CCRs) & fixed circuits all hardware and software, 4 nos of vault processors, other items as required for successful operation of the system complete as required. 2nd Year (After Completion of 1 year DLP) (5% escalation on first year cost of item no:18)
All Inclusive Comprehensive Maintenance Contract (AICMC) Airfield Lighting Control through HMI, Type 'L 890 BB' to the requirements of FAA Advisory Circular No. AC 150/5345 - 56B(Current edition) and additional circuits/mechanisms/interfaces for control & monitoring of constant current regulators (CCRs) & fixed circuits all hardware and software, 4 nos of vault processors, other items as required for successful operation of the system complete as required. 3rd Year (After Completion of 1 year DLP) (5% escalation on Second year cost of item no:19)
All Inclusive Comprehensive Maintenance Contract (AICMC) Airfield Lighting Control through HMI, Type 'L 890 BB' to the requirements of FAA Advisory Circular No. AC 150/5345 - 56B(Current edition) and additional circuits/mechanisms/interfaces for control & monitoring of constant current regulators (CCRs) & fixed circuits all hardware and software, 4 nos of vault processors, other items as required for successful operation of the system complete as required. 4th Year (After Completion of 1 year DLP) (5% escalation on Third year cost of item no:20)
All Inclusive Comprehensive Maintenance Contract (AICMC) Airfield Lighting Control through HMI, Type 'L 890 BB' to the requirements of FAA Advisory Circular No. AC 150/5345 - 56B(Current edition) and additional circuits/mechanisms/interfaces for control & monitoring of constant current regulators (CCRs) & fixed circuits all hardware and software, 4 nos of vault processors, other items as required for successful operation of the system complete as required. 5th Year (After Completion of 1 year DLP) (5% escalation on Fourth year cost of item no:21)
vardhman Airport solutions pvt. Ltd.
MPC ELECTRICALS AND ENGINEERS
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .