| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹39.9 LAdmitted-Finance | -26.54% | ₹39.9 L | L1 | Admitted-Finance |
| 2 | L2₹40.4 L+₹55,924.66 (1.40%)Admitted-Finance PLOT NO 31 418 SECTOR 3 ZONE 31 PRATAP NAGAR SANGANER JAIPUR | -25.51% | ₹40.4 L+₹55,924.66 (1.40%) | L2 | Admitted-Finance |
| 3 | L3₹40.7 L+₹77,642.98 (1.95%)Admitted-Finance | -25.11% | ₹40.7 L+₹77,642.98 (1.95%) | L3 | Admitted-Finance |
| 4 | L4₹41.5 L+₹1.6 L (4.06%)Admitted-Finance 37 RK PURAM COLONY SITAPURA JAIPUR RAJASTHAN 302022 | JAIPUR | RAJASTHAN | 302022 | -23.56% | ₹41.5 L+₹1.6 L (4.06%) | L4 | Admitted-Finance |
| 5 | L5₹42.8 L+₹2.9 L (7.39%)Admitted-Finance A 83 SAINI COLONY KARTARPURA JAIPUR RAJASTHAN 302015 | JAIPUR | JAIPUR | RAJASTHAN | 302015 | -21.11% | ₹42.8 L+₹2.9 L (7.39%) | L5 | Admitted-Finance |
Tender Value
₹54.3 L
EMD Value
₹1.1 L
Closing Date
28 Mar 2026, 6:00 pmClosed
EXECUTIVE ENGINEER SANGANER ZONE
JAIPUR NAGAR NIGAM PANDIT DEENDAYAL UPPADHYAY BHAWAN LALKOTHI TONK ROAD JAIPUR
SANGANER ZONE WARD NO. 102 REPAIR WORK IN MAHARANI JAYVANTA UDYAN, OPPOSITE SECTOR 83/57, SHAKUNTALA UDYAN, OPPOSITE SECTOR 83/175, PARK OPPOSITE SECTOR 68/415, PARK OPPOSITE SECTOR 68/181, PARK OPPOSITE SECTOR 68/189, PARK OPPOSITE SECTOR 68/42 PARK
2026_DLB_547084_1
269 EXECUTIVE ENGINEER SANGANER ZONE
Open Tender
Repair and Maintenance Works
Percentage
180 days
JAIPUR
As Per Bid Documents
3 documents required · 3 mandatory
₹1,770
ONLINE PAY IN JAIPURMC WEBSITE
₹1.1 L
Yes
2 Apr 2026
18 Mar 2026
30 Mar 2026
18 Mar 2026
28 Mar 2026
18 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | (2.4.1) Dismantling of existing structures like culverts, bridges, retaining walls, CC road and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 50 metres as directed by Engineer. Lime Concrete Cement Concrete Grade M-15 and above and PCC blocks | 51 | Cum | 275.5 | ₹14,050.5 |
| 2 | (4.2.1) Earth work in excavation for roadway, including trimming bottom and side slopes in accordance with requirement of line, grades and cross sections, including disposal of surplus material with all lift and lead upto 1000 metre as per MoRT&H specification clause 301. In all type of soil | 84.3 | Cum | 235.5 | ₹19,852.65 |
| 3 | (1.1.3) Carriage of Materials by mechanical transport including
loading, unloading and stacking :: Stone, boulders, gravelly material | 135.3 | Cum | 335.38 | ₹45,376.91 |
| 4 | (25.2) Random rubble masonry with hard stone in foundation and plinth : Cement mortar 1:6 (1 cement : 6 coarse sand) Extra for random rubble masonry with hard stone in superstructure above plinth level and upto two stories. | 90.58 | Cum | 5,830 | ₹5,28,081.4 |
| 5 | (32.3.2) Cement plastering including T&P, scaffolding, material and complete labour, including cost of water, curing, racking of joints etc. with 20 mm cement plaster of mix : including Providing /mixing of synthetic fibers compulsorily complying with IS 16481:2022 of 06 mm/12 mm length to be mixed @ 0.25% by weight of Cement i.e. 125 gms per 50 kg Cement up to 900 gms per cum of Concrete/ mortar 1:4 (1 cement : 4 fine/ coarse sand) | 1,016.4 | Cum | 315.5 | ₹3,20,674.2 |
| 6 | (32.35.1) Finishing walls with Acrylic Smooth exterior paint of required shade : New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including base coat of water proofing cement paint applied @ 2.20 kg/ 10 sqm). | 6,747 | Sqm | 144 | ₹9,71,568 |
| 7 | (32.50.1) Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : Two or more coats on new work | 643.5 | Sqm | 114 | ₹73,359 |
| 8 | (29.26.2) Steel work welded in built up sections/ framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. | 8,380 | Kg | 144.5 | ₹12,10,910 |
| 9 | (21.1.7) Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:4:8 (1 Cement : 4 fine/ coarse sand : 8 graded stone aggregate 40 mm nominal size). | 108.85 | Cum | 4,575 | ₹4,97,988.75 |
| 10 | (21.1.2) Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:1½:3 (1 Cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size). | 31.5 | Cum | 5,910 | ₹1,86,165 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.71 MB
EPROC269XENSNZ.pdf
Tender Documents • 5.12 MB
BOQ_975527.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .