| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹44.4 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹48.1 L+₹3.2 L (7.02%)Rejected-Finance | L2 | Rejected-Finance Other than lowest bidder | |
| 3 | Rejected-Technical | - | Rejected-Technical Due to not enlisted in approriate category |
Tender Value
₹49.5 L
EMD Value
₹99,000
Closing Date
25 Feb 2021, 6:00 pmClosed
GE (N) Bikaner
GE (N) Bikaner Mil Stn Bikaner
Outsourcing of services and comprehensive maintenance for filtration plant and Raw water under GE (N) Bikaner at Mil Station Bikaner
2021_MES_416938_1
GE (N) BKN-Token/62/2020-21
Open Tender
Miscellaneous Works
Item Rate
330 days
GE (N) Bikaner
Class D Category d(v)
8 documents required · 8 mandatory
₹500
Yes
GE(N) Bikaner
₹99,000
Yes
21 Jul 2021
29 Jan 2021
27 Feb 2021
29 Jan 2021
25 Feb 2021
11 Feb 2021
Amount
SECTION-I: (Note for SI No. 1.00 to 3.00 :- The rate quoted shall not be less than minimum wages as notified by Government of India/State Government/Local body whichever is higher . In case the rates quoted are less than the minimum wages as notified by the Government of India/State Government/Local body whichever is higher , his tender will be treated as NON BONAFIDE and will not be considered for acceptance. In such case, the lowest tender shall be determined by the lowest amount amongst valid / bonofied bids only) Outsourcing services for the installation at KLP filtration plant Bikaner with 03 FGM in a shift i.e. (0600 Hrs to 1400 hrs) and 02 FGM in a shift . (1400 Hrs to 2200 hrs) and 01 FGM in a shift (2200 Hrs to 0600 hrs) of the 8 hrs for three shifts round the clock all as specified and directed by Engineer-in-Charge :- Notes for srl item No. 1:- (i) The DG set shall be operated only in case of failure of electricity. (ii) DHPP & Engine Oil will be issued by the dept and transportation shall be provided by contractor for DG Set only. (iii) Timing of shifts shall be as directed by Engineer-in-Charge. (iv) General cleaning of pump house bldgs, Sub Stn bldgs, DG set rooms with cleaning of plant, machinery, LT panels etc installed in the buildings. (v) Cost of perishables & petty items such as gland dori, oiling/greasing to moving parts of pumps and motors, generators, PVC insulation tapes wherever required and cost of broom sticks, cotton waste dhoties etc for cleaning of machinery, LT panels, pumps, DG sets etc for installations. (vi) Cost of log sheets for pumping sets, DG sets, filter plants, chloronome plants etc for daily running records in booklet form for a calendar month complete all as directed by Engineer-in-Charge and as per sample supplied herein after in the CA. (vii) The job for operation of low lift pump house also included :- (a) Manning & operation of water treatment plant of capacity 2.10 lakh gallons per hours at KLP by regulating the valves/channels/gates for incoming water to flash mixer, clarifloculators, flow channels, filter beds & regulating the flow of clear water upto clear water reservoir. (b) Regulating the alum dose by operating alum dosing pumps upto flash mixers. (c) Operation & regulating chloronome plant gravity feed type or the plant of hypo chloride or mixing the bleaching powder by dissolving in CWR to obtain the required PPM in filtered water. The necessary T & P . testing kit for chlorine testing upto 2 PPM & the required chemicals reagents etc shall be arranged & procured by the contractor. The cost shall be deemed to be included in the unit rate of this item.. (d) Operating the motors for flash mixers, clarifloculators, running the walkway bridges with rotating the churners for proper floculations. (e) Filling the back wash O/H tank by operating the pumps, installed in filter house, backwashing the filter beds as and when required and as directed by Engineer-in-Charge.(f) Operation sludge pump house for dewatering the sludge tank. (g) The operator shall regularly/daily check the quality of water in the lab located in filter plant room and will record the results in a separate properly bound register . (h) The contractor shall maintain a register separately for daily consumption of alum, chlorine gas/bleaching powder. (j) The contractor will arrange electrician if required and cost is deemed to be included in the rate quoted under this item.
Outsourcing of installation mentioned at para 1 (a) to (k) with 06 helper every day on 24 hrs in a shift of 8 hours for 03 helper ( 0600 to 1400 hrs), 02 helper ( 1400 to 2200 hrs) 01 helper ( 2200 hrs to 0600 hrs) in three shifts round the clock and operating the valves of pumping sets at filteration plant, lower lift pump house, clear water sump & houses at KLP before starting and before shutting down the pump, general cleaning of all installed machines and pump house bldgs and complete filtration plant and surrounding area of filtration plant & raw water reservoirs all as directed by Engineer-in-Charge. Notes for item No.2 :- (i) The helper so deployed by contractor shall be responsible for cleaning, brooming, cutting/uprooting of bushes, shrubs, plants around the pump house water reservoirs, filter plant, earth embankment to raw water reservoirs and cutting the same and throwing away and to keep neat & clear building sub stn bldg, raw water reservoirs, filter plants earth embankment as directed by Engineer-in-Charge. (ii) The helper shall take out the floating materials such as organics, vegetation, algac from the raw water reservoir at KLP area so as to Keep inlet channel & brimlines of raw water reservoirs clear all the time for this purpose he shall make the arrangements for catching/pulling the floating materials manually with suitable length of bamboo arrangements from the outside raw water reservoirs safely. No extra amount shall be claimed/Paid to contractor on this account. (iii) The helper shall also provide all type of help/assistance to operators required while operation/maintenance during the shift. (iv) Contractor will provide the boats with operator and safety equipments for cleaning of algae including necessary equipments
Outsourcing of Raw water pumping set of capacity 150 HP with one FGM and one Valve man/helper in a shift of 8 hours for three shifts round the clock for pumping at Beechwal pump house No. 1 & 2 at Beechwal all as per directed by Engr - in - Charge. Notes:- Timing of shifts shall be as directed by Engr -in Charge (ii) General cleaning of pump house bldgs, Sub bldgs, plants machinery, LT panels etc installed in the buildings (iii) cost of perishable & petty items such as a gland dori, oiling/greasing to moving parts of pump and motors, PVC insulation tapes wherever required and cost of broom sticks, cotten waste, dhoties etc for cleaning of machinery, LT panels, pumps, DG sets etc for installations. (vi) Cost of log sheets for pumping in the unit rate quoted against this item (v) The contractor will arrange electrician if required and cost thereof will be deemed to be included in the unit rate quoted under this item complete all as directed by Engr -in- charge. (vi) The contractor shall be responsible for restoration of electric supply from JVVNL (v) Contractor will be maintain log sheet each pumping set ( New pump house and old pump house) seperately . Notes :- for item No 3 :- (i) The helper so deployed by contractor shall be responsible for cleaning, brooming, cutting/uprooting of bushes, shrubs, plants around the pump house ,water reservoirs, filter plant, earth embankment to raw water reservoirs and cutting the same and throwing away and to keep neat & clear building sub stn bldg, raw water reservoirs, filter plants earth embankment as directed by Engineer-in-Charge. (ii) The helper shall take out the floating materials such as organics, vegetation, algac from the raw water reservoir at KLP area so as to Keep inlet channel & brimlines of raw water reservoirs clear all the time for this purpose he shall make the arrangements for catching/pulling the floating materials manually with suitable length of bamboo arrangements from the outside raw water reservoirs safely. No extra amount shall be claimed/Paid to contractor on this account. (iii) The helper shall also provide all type of help/assistance to operators required while operation/maintenance during the shift. (iv) Contractor will provide the boats with operator and safety equipments for cleaning of algae including necessary equipments (v) Contractor will provide all water testing instruments ( Floculator (Jar test), BOD incubator, PH, Temp controller, digital Nephelo turbidity meter 132, Digital PH meter 335, Digital PH meter model 132-R and digital water marker in water testing lab, digital TDS meter, and testing display chart on wall . No extra amount shall be claimed /paid to contractor on this account.
SECTION-II : Dismantling from foundation base frame by disconnecting, suction/delivery lines & coupling, opening and re-assembling after repairs & welding as required of centrifugal pump set 150 HP capacity model 6 UP4 make Kirloskar and replacement of worn out spare parts as mentioned under respective item here in after. Notes :- (i) Replacement of petty/minor items other than specified in Sch ‘A’ such as shaft seal/ keys/seals/ sleeves studs and other minor repairs as ordered by Engr-in-Charge shall be deemed to be included under this item. (ii) The item/spare parts supplied shall be of make and type as per original make and as per type of the pumps of respective items. (iii) Spare parts replaced shall be measured & paid for under respective item Separately as “ supply only” here in after this schedule
Supply only the following spare parts for centrifugal pump of 150 HP capacity model 6 UP 4 (1600 GPM) required to be replaced under item No 4 above Make – Kirloskar : - Pump shaft stainless steel
Impellor brass/ bronze complete with impellor key
Shaft sleeve bronze with locking screw & lock nut
Bearing No 6309 make – SKF/NBC
Shoulder ring MS
Bearing Ring (DE & NDE) CI IS- 210 DG-200
Set of ‘O’ ring
CI gland cap with eye bolt complete
Split lantern ring CI
Bearing housing with cover “DE”
Bearing housing with cover ”NDE”
Gasket set
Dismantling from foundation base frame by disconnecting, suction/delivery lines & coupling, opening and re-assembling after repairs & welding as required of centrifugal pump set 125 HP capacity make :- Marathone and replacement of worn out spare parts as mentioned under respective item here in after. Notes for item No 6 :- (i) Replacement of petty/minor items other than specified in Sch ‘A’ such as shaft seal/ keys/seals/ sleeves studs and other minor repairs as ordered by Engr-in-Charge shall be deemed to be included under this item. (ii) Spray Painting to external surface of the pump with one coat of synthetic enamel paint over one coat of red oxide primer after cleaning the rusted surface is deemed to be included in the rate quoted by contractor under this item. (iii) The item/spare parts supplied shall be of make and type as per original make and as per type of the pumps of respective items. (iv Spare parts replaced shall be measured & paid for under respective item Separately as “ supply only” here in after this schedule
Supply only the following spare parts for centrifugal pump of 125 HP capacity model 12JOUP 150-45 (1332 GPM) required to be replaced under item No 6 above Make – Kirloskar: - Pump shaft stainless steel
Impellor brass/ bronze complete with impellor key
Shaft sleeve bronze with locking screw & lock nut
Bearing No 6309 make – SKF/NBC
Shoulder ring MS
Bearing Ring (DE & NDE) CI IS- 210 DG-200
Set of ‘O’ ring
CI gland cap with eye bolt complete
Split lantern ring CI
Bearing housing with cover “DE”
Bearing housing with cover ”NDE”
Gasket set
Dismantling from foundation base frame by disconnecting suction/delivery lines & coupling,opening and re-assembling of centrifugal pump set 75 HP capacity Model DSM 100-36 required to be replaced under respective item. Make: Kirlosker
Supply only the following spare parts for centrifugal pump of 75 HP capacity Model DSM 100-36 required to be replaced under item No 08. Make: kirlosker Pump shaft stainless steel
Impellor CI complete with impellor key
Shaft sleeve bronze with locking screw & lock nut
Bearing suitable for pump make – SKF/NBC
Shoulder ring MS
Bearing Ring (DE & NDE) CI
Set of ‘O’ ring
CI gland cap with eye bolt complete
Gasket set
Dismantling from foundation base frame by disconnecting suction/delivery lines & coupling,opening and re-assembling of centrifugal pump set 30 /40 HP capacity with discharge 15 LPS at 10 Mtr head of lift Pump/house and replaced worn out spare parts as mentioned under respective item. Make Kirlosker
Supply only the following spare parts for centrifugal pump of cap 30/40 HP with discharge 15 LPS at 10 Mtr head required to be replaced under item No 10 above make Kirlosker Pump shaft stainless steel
Impellor CI complete with impellor key
Shaft sleeve bronze with locking screw & lock nut
Bearing suitable for pump set make – SKF/NBC
Bearing Ring (DE & NDE) CI
Set of ‘O’ ring
CI gland cap with eye bolt complete
GM Gland sleeve bush
Gasket set
Dismantling from foundation base frame by disconnecting suction/delivery lines & coupling,opening and re-assembling of centrifugal pump set 20 HP capacity with discharge 22 LPS at 15 Mtr head of MAP P/house and replaced worn out spare parts as mentioned under respective item. Make Kirlosker
Supply only the following spare parts for centrifugal pump of cap 20 HP with discharge 22 LPS at 42 Mtr head required to be replaced under item No 12 above make Kirlosker Pump shaft stainless steel
Impellor brass/bronze complete with impellor key
Shaft sleeve bronze with locking screw & lock nut
Bearing suitable for pump set make – SKF/NBC
Bearing Ring (DE & NDE) CI
Set of ‘O’ ring
CI gland cap with eye bolt complete
GM Gland sleeve bush
Gasket set
Dismantling the following induction motor of 3 phase 415 volt from base foundation frame by disconnecting, electrically & mechanically taking out to work shop cutting down & removing existing burnt out copper windings cleaning slots and rewinding the motor with super enameled solid copper winding wire of existing and no. of turns complete including varnishing /overhauling and shifting the motor back form work shop and fixing in same position after rewinding and testing complete all as specified and directed by Engr-in-charge. Cap 150 HP Pump set Make :- Kirloskar
Cap 125 HP Pump set Make :- Marathone
Cap 75 HP Pump set Make :- Kirloskar
Cap 30/40 HP Pump set Make :- Kirloskar
Cap 25 HP Pump set Make :- Kirloskar
Cap 7.5 HP Pump set Make :- Kirloskar
Cap 5 HP Pump set Make :- Kirloskar
Cap 2/3 HP Pump set Make :- Kirloskar Note for Sl item No.14 :- (i)Rate quoted by contractor shall be deemed to be included taking out carefully the burnt/defective motor from the installation to place of winding , removing existing burnt copper wire and rewinding with new wire, fixing the motor in its original place of installation after repair testing etc complete all as specified . Contractor shall report attend and remove the motor with in 48 hrs of repairing & shall reinstall the motor after repair in its original location within 06 days from taking out motor from installation failing which panel recovery @ 1000/- per motor per day shall be made from the contractor payment. (ii) Cost of minor repairs /replacement such as fan guard, terminal plate, terminal box, fan etc as directed by Engineer-in-Charge are also included in unit rate of this item. (iii) Make of winding wire shall be Chetak/Devidayal and winding wire shall be conforming to IS and size/gauge of wire shall be as per existing winding wire. (iv) Cost of insulating material viz varnish, packing paper, cotton tape etc are deemed to be included in the rate quoted by contractor for this item. (v) Rate quoted by contractor shall be deemed to include opening of existing electric motor complete and taking out burnt coils from the slots of stator, cleaning of stator slots and rewinding with the same gauge of solid copper conductor ( winding wire) as the previous burnt winding , insulating paper, wooden strips in slots and varnishing the coils, binding with strong threads and reassembling the motor after rewinding. (vi) Contractor shall be taken proper gate pass for repair of motor/pump in out side, civil workshop and maintain record resigter after repair and refixing in existing place of motor/pumping set also inform to concern authority with date. (vii) All motors are issue to contractor undergate pass by AGE E/M office.
S & F in replacement of flexible rubber tyre of coupling suitable for following motor pumping set :- Cap 150 HP Motor pumping sets
Cap 125 HP Motor pumping sets
Cap 75 HP Motor pumping sets
Cap 30/40 HP Motor pumping sets
Cap 25 HP Motor pumping sets
Cap 7.5 HP Motor pumping sets
Cap 5 HP Motor pumping sets
Cap 3/2.5HP Motor pumping sets
S&F in replacement of star rubber coupling set suitable for following Motor pumping set. Cap 5 HP Motor pumping set.
Cap 7.5 HP Motor pumping set.
Cap 2/3 HP Motor gear set.
Replacement of U/S ball bearing suitable/ as per existing sizes for following electric Motors. Make: SKF/NBC Cap 150 HP
Cap 125 HP
Cap 75 HP
Cap 30 HP
Cap 25 HP
Cap 7.5 HP
Cap 5 HP
Cap 2/3 HP
Dismantling, opening and reassembling after repair/replacement of U/S parts of monoblock pumping set self priming type of cap 5 HP. Spare parts required shall be measured & paid for under respective item of this schedule. Job includes disconnection from base foundation frame, disconnecting electrically reconnection, refixing in position transportation to work shop & back and testing complete all as directed.
Supply only following spars parts for monoblock pump set of 5 HP as in item No 18 here-in-before cap:- Gland bush split type
Stainless steel shaft
Impeller CI complete with locking screw & nut
Pump bearing
S& F in replacement of U/S coupling set complete with nuts, & washers for following motor pump set:- For 150 HP motor pump set
For 125 HP motor pump set
For 40/30 HP motor pump set
For 25 HP motor pump set
Taking out dismantling carefully the following sluice valve after disconnecting rising type handle ,lever locks, un screwing the top cover bonnet, taking out valve seat/ ring cleaning , resurfacing with grinding & remettalling of spenidle cleaning inside ring/ seat space replacing, wedge , wedge nut, reassembling reinstalling back including, transportation to workshop & back to site and make serviceable compete all as specified & as directed. 600 mm bore
500 mm bore
450 mm bore
350 mm bore
250 mm bore
200 mm bore
150 mm bore
Taking out dismantling carefully following foot valves after disconnecting from suction and side of pumping set, unscrewing the top cover bonnet, taking out seat with lever and labour & material for replacement of leather of supirior quality ISI marked with washer of existing size & cleaning inside seat space reassembling reinstalling back. Compete all as directed by Engr-in-charge. Size 200/250 mm bore
Size 150 mm bore
M&L for dismantling, opening, rewinding , top of oil if required and reassembling complete after rewinding of following rated auto transformer for oil immeressed star/delta starter 415 Volt, 50Hz, 3 - Phase & make serviceable complete all as specified and directed . of following cap : Make-Jyoti , Capacity of 150 HP
Capacity of 125 HP
Capacity of 75 HP
Supply and fixing in replacement of non return valve cast iron flanged ends ISI marked (IS 5312) of size 450 mm bore with rubber or fibre board gasket including necessary nuts, bolts, and washers and submitt test report complete all as specified and directed by Engr-in-charge. MAKE : KIRLOSKAR / Uppadhayay/BIR
Supply and fixing in replacement of non return valve cast iron flanged ends ISI marked (IS 5312) of size 200/250 mm bore with rubber or fibre board gasket including necessary nuts, bolts, and washers and submitt test report complete all as specified and directed by Engr-in-charge. MAKE : KIRLOSKAR / Uppadhayay/BIR
Supply and fixing in replacement of non return valve cast iron flanged ends ISI marked (IS 5312) of size 150 mm bore with rubber or fibre board gasket including necessary nuts, bolts, and washers and submitt test report complete all as specified and directed by Engr-in-charge. MAKE : KIRLOSKAR / Uppadhayay/BIR
S&F in replacement of metallic antivibration pads with rubber cushion for 150/125/75 HP motor pumping set including drilling hole at necessary places on foundation base frame. MAKE: Dunlop
S & F in replacement of Cast Iron sluice valve ISI marked conforming to IS 14846:2000 complete with Gun metal spindle, flanged both ends, drilled CI gate with stainless steel spindle and iron wheel handle cast iron cap stuffing box etc. suitable for 150 mm bore CI pipe including joints and jointing materials ie, nuts, washers, rubbers inserting sheet complete all as specified and directed. MAKE : KIRLOSKAR / Uppadhayay/BIR
S & F in replacement of Cast Iron sluice valve ISI marked conforming to IS 14846:2000 complete with Gun metal spindle, flanged both ends, drilled CI gate with stainless steel spindle and iron wheel handle cast iron cap stuffing box etc. suitable for 200 mm bore CI pipe including joints and jointing materials ie, nuts, washers, rubbers inserting sheet complete all as specified and directed. MAKE : KIRLOSKAR / Uppadhayay/BIR
S & F in replacement of Cast Iron sluice valve ISI marked conforming to IS 14846:2000 complete with Gun metal spindle, flanged both ends, drilled CI gate with stainless steel spindle and iron wheel handle cast iron cap stuffing box etc. suitable for 250 mm bore CI pipe including joints and jointing materials ie, nuts, washers, rubbers inserting sheet complete all as specified and directed. MAKE : KIRLOSKAR / Uppadhayay/BIR
S & F in replacement of Cast Iron sluice valve ISI marked conforming to IS 14846:2000 complete with Gun metal spindle, flanged both ends, drilled CI gate with stainless steel spindle and iron wheel handle cast iron cap stuffing box etc. suitable for 350 mm bore CI pipe including joints and jointing materials ie, nuts, washers, rubbers inserting sheet complete all as specified and directed. MAKE : MAKE : KIRLOSKAR / Uppadhayay/BIR
S & F in replacement of Cast Iron sluice valve ISI marked conforming to IS 14846:2000 complete with Gun metal spindle, flanged both ends, drilled CI gate with stainless steel spindle and iron wheel handle cast iron cap stuffing box etc. suitable for 450 mm bore CI pipe including joints and jointing materials ie, nuts, washers, rubbers inserting sheet complete all as specified and directed. MAKE : KIRLOSKAR / Uppadhayay/BIR
S & F for supply, jointing, commisioning & testing DI spigot & socket ends suitable for rubber tyton joint centrifugally cast (spun) class K9 confirming to IS-8329-2000 in any length of size 450 mm bore complete all as specified,
S & F jointing materials of DI/CI upto 450 mm bore pipe line for reducer/bends (any type reducer and any angle ) tail piece any type, straight, bend, increasing/decreasing or double socket extra Tee pieces single branch 'Y' junction double branch,cross coller caps etc complete all as specified and directed.
Supply and fixing in replacement three phase DOL starter suitable for 2 HP Mono block pump set for clariflucators gear boxes, alum mixtures and alum dozers all as specified and directed by Engineer-in-Charge. Make : L&T/Semons/Havells
Dismantling, opening and reassembling complete after repair/replacement of unserviceable parts of oil immersed star delta starter of capacity 125/150 HP (Make : Jyoti) including cleaning of all parts of starter & replacement of worn out / US spare parts as mentioned under respective item all as directed by Engr-in-Charge. Note : spares required will be measured and paid under respective items
Supply only following spare parts for oil immersed star delta starter of capacity 150 HP ( Make : Jyoti) :- Spare kit of star delta starter 150/125 HP (set of male female 18 fingers) Cat Part No. 21801
Magnet Coil
Auxiliary switch type INO + INC contact
Set of wire shape with lugs from contactor
Moving bridge guide assembly with relay
Set of connector links between contactor and relay
CR Block
Electronic type single phase preventor
Taking down carefully of Reduction gear box horizontal type (Ratio 1/60) of walk way bridge from 3 HP three phase motor and movable walk way bridge foundation assambly and re- fixing the same position after rapair complete all as specified and directed .
Dismantiling & Repairing of Reduction gear box horizontal type (Ratio 1/60) of walk way bridge including cleaning of all parts of reduction gear box as directed by Engr -in Charge.
Supply and fixing in replacement of the following items against item No 38 & 39 above :- Link gear chain as per existing.
Brass Gear wheel as per existing.
Ball bearing as per existing.
Oil Seal as per existing.
Gear oil 30 W 40
Taking down carefully of Reduction gear box vertical type (Ratio 1/40) of Alum flash mixer and Alum chamber from 3 HP three phase motor and mixing MS rod and re fixing the same position after rapair and all as directed by Engineer in Charge .
Dismantiling & Repairing of Reduction gear box vertical type (Ratio 1/40) of Alum flash mixer and Alum chamber including cleaning of all parts of reduction gear box as directed by Engineer-in-Charge.
Supply and fixing in replacement of the following items against item No 41 &42 above:- Star cupling as per exiting
Brass gear wheel as per exiting
Ball bearing as per exiting
Oil Seal as per existing.
Supply and fixing in replacement of the following spare parts of panels:- Contactor ML 1.5 Make : L&T/C&F/Legrand
Relay as per sample
Main switch 32 Amp TPN (Make: Hawells/HPL/Siemense
ON/OFF Switch
Single Phase priventor
Timer
Supply and fixing of the following spare parts of slip ring with carbon contactor assambly of walk way bridge. Carbon of size No : 8
Slip ring of copper as per existing
Taking down carefully of reduction gear box, horizental type (Ratio 1/60) of walk way bridge from 3 HP motor three phase and movable walk way bridge foundation assembly and refixin of the same position after repair .
Fixing only reduction gear box vertical type (Ratio 1/60) testing complete all as specified and directed by Engr-in-Charge.
Fixing only of reduction gear box vertical type (Ratio 1/50) testing complete all as specified and directed by Engr-in-Charge.
Supply the following items against item No 46, 47 & 48 above:- Star coupling as per exiting
Brass gear wheel as per exiting
Ball bearing as per exiting Make: SKF/NBC
Oil Seal as per existing.
M&L for shifting of centrifugal pump set of capacity 150/125 HP Make : Kirloskar/Marathone from filteration plant to Beechwal or Beechwal to filteration as per requirement, including disconnecting all electric connection and fixing with electric connection & complete fittings. Note :- Rate quoted by contractor shall be deemed to be included taking out carefully the centrifugal pump set one place to other place including all T&P ( Crane and vehicle) and necessary PCC works CI/GI fitting as per requirement. (ii) If incase damage of centrifugal pump set during to the shifting, which panel recovery cost of motor pump shall be made from the contractor payment.
M&L in replacement of CI foot valve of size 150/200 mm dia including leather,nut,bolt, washer complete as per directed by Engr - in- charge Make: Kirloskar/BIR
Repair in replacement of Air release valve with sluice valve of size 80 mm dia including 80 mm GI pipe,nut bolt rubber sheet and all fitting accessories complete as per directed by Engr - in- charge Make: Kirloskar/BIR
M&L for cleaning of wash out reservoir of capacity 50,000 Glns by desludging,scraping the bottom, side wall and upper bottom with the help of scrapper/wire iron brush removing all scales, cracked earth, dirt, mud.silt, algae, fungus and minor repair (if required), other foreign deposit materials including dewatering the left over water two times in a contract period complete all as directed by Engr-in-Charge
Cleaning of intake chamber and canal water flow chanel by desludging,scraping the bottom, side wall and upper bottom with the help of scrapper/wire iron brush removing all scales, cracked earth, dirt, mud.silt, algae, fungus and other foreign deposit materials including dewatering the left over water complete all as directed by Engr-in-Charge
Supply and fixing in replacement of the capacity 400 Amps MCCB four pole 415 volts, 36 KA including replacement of necessary lugs/thimble of suitable size etc complete all as per directed by Engr - in Charge MAke: ABB/Siemens/L&T/C&S
Supply and fixing in replacement of the capacity 350 Amps MCCB four pole 415 volts, 36 KA including replacement of necessary lugs/thimble of suitable size etc complete all as per directed by Engr - in ChargeMAke: ABB/Siemens/L&T/C&S
Supply and fixing in replacement of the capacity 160 Amps MCCB four pole 415 volts, 36 KA including replacement of necessary lugs/thimble of suitable size etc complete all as per directed by Engr - in ChargeMAke: ABB/Siemens/L&T/C&S
Supply and fixing in replacement of the capacity 100 Amps MCCB three pole 415 volts, 36 KA including replacement of necessary lugs/thimble of suitable size etc complete all as per directed by Engr - in ChargeMAke: ABB/Siemens/L&T/C&S
Supply and fixing in replacement of the capacity 63 Amps MCCB four pole 415 volts, 16 KA including replacement of necessary lugs/thimble of suitable size etc complete all as per directed by Engr - in ChargeMAke: ABB/Siemens/L&T/C&S
Supply and laying in replacement underground XPLE insulated, armoured, heavy duty electric cable with stranded aluminium conductor 1100 volts grade cross sectional area 50 sqmm, 3.5 core conforming to IS, laid in trenches/ducts/pipes/ floor etc complete all as specified. Make : Havells/Polycab/Gloster.
S&F High density polyethylene pipes (HDPE) of pressure rating 6 kgf/cm2 of size 20 mm dia fixed complete to walls, ceilings or in floors etc. TATA/Jindal /Surya prakash
S&F High density polyethylene pipes (HDPE) of pressure rating 6 kgf/cm2 of size 80 mm dia fixed complete to walls, ceilings or in floors etc.Make: TATA/JINDAL/PRAKASH SURYA
Supply and fix PVC insulated and FR PVC rounded sheated ,copper conductor cable ,1100 volts grade ,3 core of size 10 sqmm. MaKe: Havells/Finolex/Plaza/Polycab/gloster
Supply and fix PVC insulated and FR PVC flat submersible ,copper conductor cable ,1100 volts grade , 3 core of size 16 SqmmMaKe: Havells/Finolex/Plaza/Polycab/gloster
RAJENDER ENTERPRISES
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .