| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | H3₹7.3 LAccepted-AOC | ₹7.3 L | H3 | Accepted-AOC AOC |
| 2 | H1₹8.0 LRejected-Finance | ₹8.0 L | H1 | Rejected-Finance Highest |
| 3 | H2₹7.5 LRejected-Finance VILLAGE GOLHUIEN PO KILOD TEHSIL DISTT CHAMBA HP | CHAMBA | CHAMBA | HIMACHAL PRADESH | ₹7.5 L | H2 | Rejected-Finance Highest |
| Sl No | Description | Qty | Unit | Kamlesh Kumar H2 | Bharat Singh Verma H3 | Lokesh Kumar H1 |
|---|---|---|---|---|---|---|
| 2.00Desription | ||||||
| 3.00 | Excavation in foundation trenches etc.in earth work,lift up to 1.50 mtrs,stacking the excavated soil not more than 3 mtrs clear from the as of excavation and then returning the excavated soil in 15 cm layer when ewquired into plinths sodes of foundations etc. concolidating each deposited layer by ramming and watering and then disposing of all surplus excavated soil as directed within a lead of 20 mtrs. | 11.44 | Cum | 200 ₹2,288 Lowest | 400 ₹4,576 | 700 ₹8,008 |
| 4.00 | For Pipeline | 346.5 | Cum | 220 ₹76,230 Lowest | 300 ₹1,03,950 | 300 ₹1,03,950 |
| 5.00Providing and laying cement concrete 1:3:6 (1 cement : 3 sand : 6 graded stone aggregate 40mm nominal size) and curing complete excluding cost of form work in:- | ||||||
| 6.00 | Foundation and Plinth. | 3.61 | Cum | 5,500 ₹19,855 Lowest | 6,800 ₹24,548 | 8,000 ₹28,880 |
| 7.00Providing and laying cement concrete 1:1½:3 ( 1 cement : 1½ sand : 3 graded stone aggregate 20mm nominal size) and curing complete excluding cost of form work & reinforcement for reinforced concrete work in:- | ||||||
| 8.00 | Foundation and Plinth. | 2.76 | Cum | 7,200 ₹19,872 Lowest | 8,100 ₹22,356 | 8,000 ₹22,080 |
| 9.00 | Walls (any thickness but not less than 0.1 m thickness) attached pilasters, buttresses, plinth and string courses etc. from top of foundation level up to floor two level. | 5.12 | Cum | 7,200 ₹36,864 Lowest | 8,200 ₹41,984 | 8,000 ₹40,960 |
| 10.00Providing form work with steel plates 3.15 mm thick welded with angle iron in frames 30x30x5 mm so as to give a fair finish i/c centring ,shuttering, strutting and propping etc. with wooden battens & ballies, ht. of propping & centring below supporting floor to ceiling not exceeding 4 mtrs. & removal of the same for insitu-reinforced concrete work in : | ||||||
| 11.00 | Flat surfaces such as soffits and suspended floors, roofs , landing and the like:- | 11.48 | Sqm | 10 ₹114.8 Lowest | 380 ₹4,362.4 | 600 ₹6,888 |
Tender Value
₹22,000
EMD Value
₹22,000
Closing Date
27 Mar 2026, 11:00 amClosed
EE JAl Shakti Shimla Rural Division at Sunni
EE JAl Shakti Shimla Rural Division at Sunni
C/O RCC Intake Chamber, RCC Storage tank 20000 Ltrs. Cap. and Providing, L J of GI pipes of various dia
2026_HPIPH_132018_1
SNN-SML-003-740-Tdr-25 -47-53 dt 13.3.26
Open Tender
Civil Works - Water Works
Item Rate
60 days
EE Sunni
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
EE Suni
₹22,000
18 Jun 2026
19 Mar 2026
27 Mar 2026
19 Mar 2026
27 Mar 2026
19 Mar 2026
19 Mar 2026 - 27 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 2Desription | |||||
| 3Excavation in foundation trenches etc.in earth work,lift up to 1.50 mtrs,stacking the excavated soil not more than 3 mtrs clear from the as of excavation and then returning the excavated soil in 15 cm layer when ewquired into plinths sodes of foundations etc. concolidating each deposited layer by ramming and watering and then disposing of all surplus excavated soil as directed within a lead of 20 mtrs. | |||||
| 4For Pipeline | |||||
| 5Providing and laying cement concrete 1:3:6 (1 cement : 3 sand : 6 graded stone aggregate 40mm nominal size) and curing complete excluding cost of form work in:- | |||||
| 6Foundation and Plinth. | |||||
| 7Providing and laying cement concrete 1:1½:3 ( 1 cement : 1½ sand : 3 graded stone aggregate 20mm nominal size) and curing complete excluding cost of form work & reinforcement for reinforced concrete work in:- | |||||
| 8Foundation and Plinth. | |||||
| 9Walls (any thickness but not less than 0.1 m thickness) attached pilasters, buttresses, plinth and string courses etc. from top of foundation level up to floor two level. | |||||
| 10Providing form work with steel plates 3.15 mm thick welded with angle iron in frames 30x30x5 mm so as to give a fair finish i/c centring ,shuttering, strutting and propping etc. with wooden battens & ballies, ht. of propping & centring below supporting floor to ceiling not exceeding 4 mtrs. & removal of the same for insitu-reinforced concrete work in : | |||||
| 11Flat surfaces such as soffits and suspended floors, roofs , landing and the like:- | |||||
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.19 MB
BOQ_195236.xls
BOQ • 0.28 MB
FORM-8.pdf
Tender Documents • 0.67 MB
term.pdf
Tender Documents • 0.06 MB
FORM6.pdf
Tender Documents • 0.16 MB
od.pdf
PDF • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].