Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.6 LAccepted-AOC | L1 | Accepted-AOC Lowest Rate | |
| 2 | L2₹7.0 L+₹38,624.04 (5.83%)Rejected-Finance | L2 | Rejected-Finance Highest Rate |
Tender Value
₹8.0 L
EMD Value
₹7,980
Closing Date
21 Sept 2023, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
BLOCK DEVELOPMENT OFFICER
BLOCK DEVELOPMENT OFFICE,RADHAPURAM
Strengthening of Thoppuvilai Kurusadi to Burial Ground 0/0 - 0/280 in in K.Puthur Panchayat of Radhapuram Union
2023_RDTN_370665_1
A3/1710/2023
Open Tender
Civil Works
Item Rate
90 days
BLOCK DEVELOPMENT OFFICE, RADHAPURAM
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹7,980
3 Oct 2023
16 Sept 2023
21 Sept 2023
16 Sept 2023
21 Sept 2023
16 Sept 2023
Amount
Strengthening
Clearing andGrubbing road landing uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300mm,removal of the stumps such trees cut earlier and disposal of unserviceable materials and stacking of servicable materialsto be used or auctioned,upto lead of 1000m including and disposal of top organic soil not exceeding 150mm thicknes as per Technical specification Claus 201,(i) (A) -Scrub Jungle Clearance
Earthwork in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation fo bunds, breaking clods, sectioning etc., compelte.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Construction of Granular Sub base by providing well graded material(25mm to 4.75mm IRC HBG metal @65%,4.75 to 2.36mmIRC HBG metal @ 20 % & 2.36 mm below IRC HBG metal @15%)&(the materials passing 425 microns sieve shall have a liquid limit and plasticity index not more than 25 &6 % respectively) spreading uniform layer with mortor grader on prepared surface mixing by mix place method with rotovator at OMC and compacting with three wheel 80-100KN capacity and finished in accordance with requirement ofthe specification and thickness as per approved plans on as directed by the engineer
Aplying PRIMECOAT over WMM surface at 7.00KG of SS 1 Bitumen Emulsion including cost of bituminous emulsion which will b supplied by the department at section stores and its cost will be recovered asper special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulision by mechanical sprayer including hire and fuel charges for all roads and plants employed etc.,complete as per clause 503 of MORT specification
Proviiding and laying Tack coat over BT surface using 2.50 Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat by bitumen sprayer
Providing and laying of premix carpet 20mm thick using 0.18 cum of 13.2IRC machine crushed metal 0.09 cum of 11.2mm IRC machine crushed metal with 13.432 kg of bitumen with 1.168 kg of plastic waste for pre mxing 10 sqm of premix carpeet and laying seaal coat type A using 0.09cum of 6.70 mmIRC HBG chios with 9.80 kg of Bitumen for 10 sqm including cost and conveyance of materials o the departmental metric gauge for pre measure heating the bitumenetc
M MOHAMMED HAKKIM
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_442033.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .