Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.9 CrAdmitted-Finance | -11.51% | ₹2.9 Cr | L1 | Admitted-Finance |
| 2 | Rejected-Technical | - | - | - | Rejected-Technical Non Responsive |
Tender Value
₹3.5 Cr
EMD Value
₹6.9 L
Closing Date
6 Aug 2026, 6:00 pmClosed
Commissioner Municipal Corporation, Bharatpur
Municipal Corporation, Bharatpur
Construction of Drain from Surajpole Chauraha to Jagheena Gate CFCD
2026_DLB_575215_1
Nit (10/2026-27) Municipal Corporation, Bharatpur
Open Tender
Civil Works
Percentage
365 days
Municipal Corporation
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
Commissioner Municipal Corporation, Bharatpur
₹6.9 L
Yes
Office Municipal Corporation Bharatpur
17 Sept 2026
15 Jul 2026
7 Aug 2026
15 Jul 2026
6 Aug 2026
15 Jul 2026
22 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Sludge clearance of drains, channels and canals with lift 1.5 Mtr and lead up to 50 Mtr. | - | Cum | 411 | - |
| 2 | Construction of embankment with approved material obtained from borrow pit with all lifts and leads, transporting to site, spreading, grading to required slope and compacting by vibratory roller 8-10 tonne to meet requirement of table 300-2 including cost of compensation for earth taken from private land complete as per MoRT&H specification clause 305. (Lead taken upto 5 km) | - | Cum | 178.5 | - |
| 3 | Providing Barricading for Trenches using 80 - 100 mm dia Wooden Ballies as vertical post, atleast 1.5m above ground level and atleast 30-45 cm below ground level at a spacing of 3 m. Two rows of PVC Tape (preferably red in colour) strip barricading horizontal strip securely tied by the vertical members. Vertical members shall be painted in red and white colour. Rate is inclusive removal and cleaning of site complete in all respect. | - | Metre | 113.5 | - |
| 4 | Providing and Fixing Minimum 0.63mm thick GI corrugated sheets (minimum width of each sheet shall be 60 cm) for covering the barricading in one/ two rows one above another and painting in red and white stripes as per the specifications and directions of the Engineer In-charge with proper fixing arrangements with GI limpet washers nuts and bolts complete in all respect. | - | Sqm | 147 | - |
| 5 | Add extra over item no 4.10.1, 4.10.2, 4.10.3 and 4.10.4 in RUIDP SOR for excavation in saturated soil, silt and sludge where pumping or bailing out of water is required including shoring strutting where required and dewatering, where width is upto 6 metre. Excavation from Encountered depth of water table 0.0 to 1.5 m | - | Cum | 45.9 | - |
| 6 | Carriage of Materials by mechanical transport including loading, unloading and stacking :: lead up to 5 KM | - | cum | 254.76 | - |
| 7 | Random rubble dry stone Kharanja (soling) under floor. | - | Cum | 2,270 | - |
| 8 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:4:8 (1 Cement : 4 fine/ coarse sand : 8 graded stone aggregate 40 mm nominal size). | - | Cum | 4,575 | - |
| 9 | Providing and laying structural plain/ reinforced cement concrete (design mix) of specified grade in substructure at all levels using batching plant, transit mixer, concrete pump and vibrator including cost of form work complete as per drawing and clause 1500, 1700 and 2200 of MoRT&H specification including all scaffolding, material, labour, machinery etc. including Providing /mixing of synthetic fibers compulsorily complying with IS 16481:2022 of 06 mm/12 mm length to be mixed @ 0.25% by weight of Cement i.e. 125 gms per 50 kg Cement up to 900 gms per cum of Concrete/ mortar.
RCC Grade M -30 | - | Cum | 6,620 | - |
| 10 | Centring and shuttering with plywood or steel sheet upto two stories ( each story of height upto 3.5 metre from floor level) including strutting, propping etc. and removal of form for :
Foundations, footings, bases of columns, etc. for mass concrete | - | Sqm | 236.5 | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.89 MB
Tendernotice_2.pdf
PDF • 0.52 MB
Tendernotice_3.pdf
PDF • 0.46 MB
Tendernotice_4.pdf
PDF • 0.36 MB
Tendernotice_5.pdf
PDF • 0.14 MB
Tendernotice_6.pdf
PDF • 0.08 MB
BOQ_1022964.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .