Tender Value
₹78.0 L
EMD Value
₹1.6 L
Closing Date
22 May 2026, 11:00 amClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
S AND T
16 conditions · 2 needing a document upload
GCC 2022 10.2. Financial Eligibility Criteria: The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
The balance sheet and all other financial documents attested/certified by Chattered Accountants (CAs) to substantiate fulfilment of Financial Eligibility Criteria should be with Unique Document Identification Number (UDIN), failing which the offer is likely to be rejected without any further reference.
GGCC, April 2022, 10.1 Technical Eligibility Criteria: (a) The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i) Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or (ii) Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or (iii) One similar work costing not less than the amount equal to 60% of advertised value of the tender.
Definition of Similar Nature of Work[Ref: Dy CSTE/HQ/GRC's Note No.- S&T SER/PL/1645(Tender Policy), Dtd. 19.10.2022]:- Similar nature of the work will be considered as :- (1) Track circuit or (2) LVCD or (3) L. C. Gate Interlocking or (4) Electro mech. Rehabilitation or (5) Panel Work (Outdoor) or (6) Panel Work (Indoor) or (7) Panel Work (Outdoor + Indoor) or (8) RRI Work (Outdoor) or (9) RRI Work (Indoor) or (10) RRI Work (Outdoor + Indoor) or (11) EI/SSI work (Outdoor) or (12) EI/SSI work (Indoor) or (13) EI/SSI work (Outdoor + Indoor)].
Note for Item 10.1: Work experience certificate from private individual shall not be considered. However, in addition to work experience certificates issued by any Govt. Organisation, work experience certificate issued by Public listed company having average annual turnover of Rs 500 crore and above in last 3 financial years excluding the current financial year, listed on National Stock Exchange or Bombay Stock Exchange, incorporated/registered at least 5 years prior to the date of closing of tender, shall also be considered provided the work experience certificate has been issued by a person authorized by the Public listed company to issue such certificates. In case tenderer submits work experience certificate issued by public listed company, the tenderer shall also submit along with work experience certificate, the relevant copy of work order, bill of quantities, bill wise details of payment received duly certified by Chartered Accountant, TDS certificates for all payments received and copy of final/last bill paid by company in support of above work experience certificate.
66 conditions · 8 needing a document upload
Mandate form should be uploaded duly filled in and signed.
IR General Conditions of Contract (GCC) Apr 2022 with upto date correction slip is applicable for this tender unless otherwise mentioned in the special conditions of contract, tender schedule and technical specification.
Documents testifying tenderer previous experience and financial status should be produced along with the tender. Tenderer(s) who is / are not borne on the approved list of the Contractors of S.E. Railway shall submit along with his /their tender.
(i) Certificates and testimonials regarding contracting experience for the type of job for which tender is invited with list of works carried out in the past.
(ii) Certificates which may be an attested Certificate from the client, Audited Balance Sheet duly certified by the Chartered Accountant etc regarding contractual payments received in the past.
(iii) The list of personnel /organization on hand and proposed to be engaged for the tendered work. Similarly list of Plant & Machinery available on hand and proposed to be inducted and hired for the tendered work.
BAR CHART,ACTIVITY WISE programme for completion of work in the time frame stipulated in the tender to be submitted in scanned pdf file format.
The tenderer should have valid PF code no, as per statutory conditions and extant rules. The details of EPF of Contractor should be uploaded.
Tenderers are required to upload copy of Permanent Account Number.
Special conditions of contract for mandatory updation of Labour data on Railways's shramikkalyan portal by contractor shall be done as per Rly. Bd. letter no. 2018/CE-I/CT/4, Dtd. 17.10.18 or latest guidelines.
Railway Board has directed for Online verification of Bank Guarantees through SFMS (Structured Financial Messaging System) platform now enabled on IPAS. For this, it is necessary that following details be entered into SFMS while issuing BG by Bank submitted by Vendors/Contractors in favour of Railways IFSC code (SBIN000RAIL), IFSC TYPE (BRANCH), BANK NAME (STATE BANK OF INDIA), CITY NAME (NAVI MUMBAI), ADDRESS ( SECTOR-11, CBD BELAPUR, NAVI MUMBAI), DISTRICT (NAVI MUMBAI), STATE (MAHARASHTRA), BG ENABLED (YES).This IFSC code is only valid for BG issuance and verification in favour of Railways.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Provisional/Registration GST certificate should be attached.
The option of payment through Letter of Credit (LC) has been enabled for all tenders published after 06.06.2018 18.00 Hrs whose value is equal to or greater than Rs.10 Lacs. in accordance with board's letter no. 2018/CE-I/CT/9 dated 04.06.2018.
If the tenderer/tenderers deliberately gives/give wrong information in his/their tender or creates/ create circumstances for the acceptance of his/their tender, the Railway reserves the right to reject such tender at any stage.
If working through contract labour, the contractor must register with commissioner of labour concerned and necessary license to be submitted along with offer, failing which the tender will not be considered on the ground that they have not complied with legal provisions of the said act .
Rights of the Railway to deal with Tender: The authority for the acceptance of the tender will rest with the Railway. It shall not be obligatory on the said authority to accept the lowest tender or any other tender, and tenderer (s) shall neither demand any explanation for the cause of rejection of his/ their tender nor the Railway to assign reasons for declining to consider or reject any particular tender or tenders.
The tenderers shall keep the offer open for a minimum period as mentioned in NIT from the date of opening of the tender, within which period the tenderers can not withdraw their offer. Validity of tender can be further extended if required on mutual consent from time to time. Any contravention of the above condition will make the tenderer liable for forfeiture of his security deposit for due performance of the foregoing stipulation.
All these conditions and specifications should carefully be studied by the tenderer / tenderers before submitting his/their tender. He/they should in his/their own interest be well acquainted with the site of work.
Should a tenderer find the discrepancies in, or omissions from the drawings or any of the tender forms or should be in doubt as to their meaning, he should at once notify the authority inviting tenders who may issue a corrigendum. It shall be understood that every endeavor has been made to avoid any error which can materially affect the basis of the tender and the successful tenders shall take upon himself and provide for the risk of any error which may subsequently be discovered and shall make no subsequent claim on account thereof
The drawings for the works can be seen in the office of the Divisional Railway Manager/ S&T /South Eastern Railway/Ranchi or Chief Signal and telecom engineer /Garden Reach, Kolkata at any time during office hours.
For settlements of disputes & Arbitration provision of relevant clauses of Indian Railway standard general condition of contract Apr 2022 and corrections up to-date will be followed.
If in any case, opening of the aforesaid tender is not possible on stipulated date as mentioned in NIT, it will be opened on the next working day at the same time and place.
Any amendment and corrigendum issued from time to time before opening is to be seen on website http://www.ireps.gov.in, which will be made available on website at least 15 days in advance from the date of opening of tender. The same should be submitted duly signed as enclosure of tender document. Tenderer shall be responsible for avoidance of such corrigendum.
Tenderers have to carefully study the various provisions made in IR GCC April 2022 with latest correction slips and submit their offers accordingly.
Tenderers(s) should read carefully the instructions given in the Tender Form (Second Sheet) and Indian Railway Standard General Conditions of Contract - Apr 2022 attached in the document section and submit all the required documents in compliance to the Instructions contained in the said Tender Form (Second Sheet)
Wages to Labour: The Contractor shall be responsible to ensure compliance with the provision of the Minimum Wages Act, 1948 (hereinafter referred to as the "said Act") and the Rules made thereunder in respect of any employees directly or through petty Contractors or sub-contractors employed by him for the purpose of carrying out this contract. If, in compliance with the terms of the contract, the Contractor supplied any labour to be used wholly or partly under the direct orders and control of the Railways whether in connection with any work being executed by the Contractor or otherwise for the purpose of the Railway such labour shall, for the purpose of this Clause, still be deemed to be persons employed by the Contractor. If any moneys shall, as a result of any claim or application made under the said Act be directed to be paid by the Railway, such money shall be deemed to be moneys payable to the Railway by the Contractor and on failure by the Contractor to repay the Railway any moneys paid by it as aforesaid within seven days after the same shall have been demanded, the Railways shall be entitled to recover the same from Contractor's bills/Security Deposit or any other dues of Contractor with the Government of India.
Provisions of Contract Labour (Regulation and Abolition) Act, 1970: 55-A. (1)The Contractor shall comply with the provision of the contract labour (Regulation and Abolition) Act, 1970 and the Contract labour (Regulation and Abolition) Central Rules 1971 as modified from time to time, wherever applicable and shall also indemnify the Railway from and against any claims under the aforesaid Act and the Rules. 55-A.(2)The Contractor shall obtain a valid license under the aforesaid Act as modified from time to time before the commencement of the work and continue to have a valid license until the completion of the work. Any failure to fulfill the requirement shall attract the penal provision of the Act. 55-A.(3)The Contractor shall pay to the labour employed by him directly or through sub-contractors the wages as per provision of the aforesaid Act and the Rules wherever applicable. The Contractor shall notwithstanding the provisions of the contract to the contrary, cause to be paid the wages to labour, indirectly engaged on the works including any engaged by subcontractors in connection with the said work, as if the labour had been immediately employed by him. 55-A.(4)In respect of all labour directly or indirectly employed in the work for performance of the Contractor's part of the contract, the Contractor shall comply with or cause to be complied with the provisions of the aforesaid Act and Rules wherever applicable. 55-A.(5)In every case in which, by virtue of the provisions of the aforesaid Act or the rules, the Railway is obliged to pay any amount of wages to a workman employed by the Contractor or his sub-contractor in execution of the work or to incur any expenditure on account of the contingent, liability of the Railway due to the Contractor's failure to fulfill his statutory obligations under the aforesaid Act or the rules, the Railway will recover from the Contractor, the amount of wages so paid or the amount of expenditure so incurred and without prejudice to the rights of the Railway under the Section 20, Sub-Section (2) and Section 2, Sub-Section (4) of the aforesaid Act, the Railway shall be at liberty to recover such amount or part thereof from Contractor's bills/Security Deposit or any other dues of Contractor with the Government of India. The Railway shall not be bound to contest any claim made against it under Sub-Section (1) of Section 20 and Sub-Section (4) of Section 21 of the aforesaid Act except on the written request of the Contractor and upon his giving to the Railway full security for all costs for which the Railway might become liable in contesting such claim. The decision of the Chief Engineer regarding the amount actually recoverable from the Contractor as stated above shall be final and binding on the Contractor
Provisions of Employees Provident Fund and Miscellaneous Provisions Act, 1952:The Contractor shall comply with the provisions of Para 30 & 36-B of the Employees Provident Fund Scheme, 1952; Para 3 & 4 of Employees' Pension Scheme, 1995; and Para 7 & 8 of Employees Deposit Linked Insurance Scheme, 1976; as modified from time to time through enactment of "Employees Provident Fund & Miscellaneous Provisions Act, 1952", wherever applicable and shall also indemnify the Railway from and against any claims under the aforesaid Act and the Rules.
55-C (i) Contractor is to abide by the provisions of various labour laws in terms of above clause 54, 55, 55-A and 55-B of Indian Railways Standard General Conditions of Contract. In order to ensure the same, an application has been developed and hosted on website www.shramikkalyan.indianrailways.gov.in'. Contractor shall register his firm/company etc. and upload requisite details of labour and their payment in this portal. These details shall be available in public domain. The Registration/updation in Portal shall be done as under: (a)Contractor shall apply for onetime registration of his company/firm etc. in the Shramikkalyan portal with requisite details subsequent to issue of Letter of Acceptance. Engineer shall approve the contractor's registration in the portal within 7 days of receipt of such request. (b)Contractor once approved by any Engineer, can create password with login ID (PAN No.) for subsequent use of portal for all Letter of Acceptances (LoAs) issued in his favour. (c)The contractor once registered on the portal, shall provide details of his Letter of Acceptances (LoAs) / Contract Agreements on shramikkalyan portal within 15 days of issue of any LoA for approval of concerned Engineer. Engineer shall update (if required) and approve the details of LoA filled by contractor within 7 days of receipt of such request. (d)After approval of LoA by Engineer, contractor shall fill the salient details of contract labours engaged in the contract and ensure updating of each wage payment to them on shramikkalyan portal on monthly basis. (e)It shall be mandatory upon the contractor to ensure correct and prompt uploading of all salient details of engaged contractual labour & payments made thereof after each wage period. (ii) While processing payment of any 'On Account Bill' or 'Final Bill' or release of 'Advances' or 'Performance Guarantee /Security deposit', contractor shall submit a certificate to the Engineer or Engineer's representatives that "I have uploaded the correct details of contract labours engaged in connection with this contract and payments made to them during the wage period in Railway's Shramikkalyan portal at 'www.shramikkalyan.indianrailways.gov.in' till ____Month, ____Year."
55-D.Provisions of "The Building and Other Construction Workers (Regulation of Employment and Conditions of Service) Act, 1996" and "The Building and Other Construction Workers' Welfare Cess Act, 1996": The tenderers, for carrying out any construction work, shall get themselves registered with the Registering Officer under Section-7 of the Building and Other Construction Workers Act, 1996 and rules made thereto by the concerned State Govt., and submit certificate of Registration issued by the Registering Officer of the concerned State Govt. (Labour Dept.). The Cess shall be deducted from contractor's bills as per provisions of the Act.
Schedule wise % Above/Below/At Par rate should be quoted. The rates quoted by contractor must be inclusive of all taxes (including GST), duties and any other charges as leviable by Govt. of India, State Government or any other agency as per provisions of works contract rules and regulations.
Provisions of Make in India Policy 2017 issued by Govt. of India, as amended from time to time, shall be followed for consideration of tenders.
Restrictions on the Employment of Retired Engineers of Railway Services Within One Year of their Retirement: The Contractor shall not, if he is a retired Government Engineer of Gazetted rank, himself engage in or employ or associate a retired Government Engineer of Gazetted rank, who has not completed one year from the date of retirement, in connection with this contract in any manner whatsoever without obtaining prior permission of the President and if the Contractor is found to have contravened this provision it will constitute a breach of contract and administration will be entitled to terminate the contract and forfeit his Performance Guarantee as well as Security Deposit.
Execution of Signaling and Telecom works in connection with Interlocking of mid- section Level Crossing Gate No. RT-11 (Km 437/1-2 between PIS-TGB, Controlling station-PIS) of Ranchi Division
ST-RNC-S17-LC-RT-11
ST-RNC-S17-LC-RT-11
Open
Works - General
6 Months
Ranchi, Jharkhand
₹0
₹1.6 L
22 May 2026
28 Apr 2026
8 May 2026
115 items across 4 schedules · ₹77,97,340.31 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | Design of circuits and plans to suit layout as per Signalling Interlocking Plan of IBS/ABS/LC GATE. This will include supply of Control cum Indication panel diagram, wiring diagrams (Indoor and outdoor), Relay rack/Relay arrangements, Bus bar details, Fuse analysis, contact analysis, Relay room tag block analysis, panel tag block analysis, Power panel diagram, IPS wiring diagram, Auto change over diagram, Power equipment arrangement Axle counter wiring diagram and all other relevant drawings. Submission of Two sets of prints with all correction for Railway's approval. Approved copy (06 Sets) of all drawings in plastic folders along with the original tracings in spiral bound with editable AutoCAD file latest version. | IBH/LC Gate/Auto Hut | 1.00 | 12,533 | 12,533 |
| 2 | Preparation of Station Working Rules (SWR) in English on the basis of station working rule diagram and gate working rule diagram to be supplied by the contractor. Submission of two draft copy to railway for checking and resubmission of draft in three copies for approval of division after making corrections. Editable Soft copy to be supplied in pen drive. | Set | 1.00 | 13,595 | 13,595 |
| 3 | Preparation of Station Working Rules (SWR) in Hindi/Regional Language of that station on the basis of station working rule diagram and gate working rule diagram to be supplied by the contractor. Submission of two draft copy to railway for checking and resubmission of draft in three copies for approval of division after making corrections. Editable Soft copy to be supplied in pen drive. | Set | 1.00 | 13,595 | 13,595 |
| 4 | Depth 1.2 meter, Width 0.5 meter. | Kilometre | 2.00 | 95,893 | 1,91,786 |
| 5 | Depth 1.0 meter, Width 0.3 meter. | Kilometre | 0.50 | 79,869 | 39,934.5 |
| 6 | Depth 0.8 meter, Width 0.3 meter. | Kilometre | 0.50 | 70,930 | 35,465 |
| 7 | Excavation of trenches including clearing of roots of trees etc. in hard/rocky soil by chiselling up to a depth of 0.5 meter to 0.8 meter and width 0.3 meter at the bottom. Supply & placing split RCC pipes with collar (for jointing pipes) of 100 mm nominal diameter to Spec. No. IS: 10262- 2019 or latest and IS-456-2000 as per SEM Drawing No. 15- D3 (Sheet-2) on sieved soil of 30 mm over cable and concreting(1:2:3) throughout the length upto a layer of 75mm approximately, then back filling the trench by digging and carrying earth from a distance of maximum 30 meters and then ramming of soil after cable laying. This also includes supply of collar and all the materials for concreting by the contractor. | Metre | 50.00 | 589 | 29,450 |
| 8 | Excavation of trench in all kinds of soils including soft rocky area and clearing of roots of trees, rocks etc. to a depth of 1 metre and width 0.3 metre. Track/Pucca road/Platform crossing/Level crossing as per SEM Drawing No.15-D5 or latest including supply, transportation and laying of RCC Pipes (full) with collar (for jointing pipes) Inner diameter/Outer diameter: 100mm/150mm to Specification No. IS:10262-2019 or latest and IS-456-2000. RCC structural drawings should be as per SEM Drawing No. 15-D3 (Sheet-2) and drawing of cable through RCC Pipes with collar (for jointing pipes) including back filling and ramming after cable laying as specified in Technical Circular No. 2 of 1988 & 01/2010 issued by CSTE/SER for S&T Cables or any latest guidelines. This includes repairing and plastering of platform/pucca road after cable laying. | Metre | 50.00 | 1,211 | 60,550 |
| 9 | Excavation of trench in all kinds of soils including soft rocky area and clearing of roots of trees, rocks etc. to a depth of 1 metre and width 0.3 mtr. Track/ Pucca road/Platform crossing/ Level crossing as per SEM Drawing No.15-D5 including supply, transportation and laying of DWC pipes (full) with collar(for jointing pipes) Inner diameter/Outer diameter:103mm/120mm to Specification No.14830 (Part-2):2001 as per SEM Drawing No. 15-D4 and drawing of cable through DWC pipes with collar(for jointing pipes) including back filling and ramming after cable laying as specified in Tech. Circular No. 2 of 1988 & 01/2010 issued by CSTE/SER for S&T Cables or any latest guidelines. This includes repairing and plastering of Platform/Pucca road after cable laying. | Metre | 50.00 | 691 | 34,550 |
| 10 | Cutting and smoothening of inside surface of sizes 80 mm deep and 170 mm width for single/multiple cable chase in concrete or hard rocks or platform or cemented floor. This work includes laying and covering of cable laid in the chase with standard sizes Second class/Fly Ash brick placed and embedded longitudinally and plastered on the top of the bricks and curing 72 hrs. as per Drawing No. Con/SK/T/1 Note: Sundries materials such as Bricks, sand, cement etc., shall be supplied by the contractor at site and to be inspected by Railway Site Engineer before placing in the chase. Note: In case, chase cutting & smoothening are other than prescribed depth & width, Proportionate payment shall be released. | Metre | 20.00 | 256 | 5,120 |
| 11 | 4 HDPE pipe | Metre | 200.00 | 1,964 | 3,92,800 |
| 12 | Supply, transportation and fixing of Galvanised Iron Pipe (make: TATA/Jindal or better) with threaded collars (for jointing pipe) of 100 mm nominal bore Specification No. IS: 1239, Pt-1, 2004 thickness 3.6 mm medium grade, on bridges, culverts, drain or at places as per instruction of the site Engineer including supply and transportation of materials required for fixing the pipe as per SEM Drawing No.15-D7 on culverts and others including drawing of cables inside the pipe with masonry work at bridge entry and exit of the culvert and curing for 72 hours and pipes are to be clamped at max. 2 meter apart with drilling of holes on the pipe at 10 cm apart for S&T Cables. Note: This also includes dismantling of released GI Pipe/Trough and released material should be returned at concerned store. | Metre | 20.00 | 1,128 | 22,560 |
| 13 | Supply, transportation and fixing of Galvanised Iron Pipe (make: TATA/Jindal or better) with threaded collars (for jointing pipe) of 100 mm nominal bore Specification No. IS: 1239, Pt-1, 2004 thickness 3.6 mm medium grade and fixing on girder bridges as per Drawing No. CON/SK/T/4 or latest including supply and transportation of channel, angle, iron brackets, Steel Nuts and bolts with hole and split pin of proper size for fixing of trough as per above drawings including drawing of cables inside the pipe with masonry work at bridge entry and exit of the Bridge and curing for 72 hours and pipes are to be clamped at min. 1.5 meter apart for S&T Cables. Note: This also includes dismantling of released GI Pipe/Trough and released material should be returned at concerned store. | Metre | 50.00 | 1,993 | 99,650 |
| 14 | Supply, Transportation and laying of Split RCC pipe as per Spec. No. IS: 10262-2019 or latest and IS-456-2000 & SEM Drawing No.15-D3 having plain ends with their jointing loose split collar half round of size 150 mm (inner diameter)/25mm thickness at site over the single/multiple cable laid in the trench. | Metre | 30.00 | 225 | 6,750 |
| 15 | Transportation and laying including supply of Split RCC pipe as per Spec. No. IS: 10262- 2019 or latest and IS-456-2000 & SEM Drawing No.15-D3 having plain ends with their jointing loose split collar half round of size 200 mm (inner diameter)/25mm thickness at site over the single/multiple cable laid in the trench. | Metre | 30.00 | 308 | 9,240 |
| 16 | Transportation of cables in rolls with or without wooden drums (S&T Cables) from concerned store to the site of works. Note: The unit Drum-KM indicates Drum X length of cable in that drum. It doesn't have any significance over the distance it has to be carried for execution of the work. | Drum-Km | 16.00 | 2,328 | 37,248 |
| 17 | Supply & laying of 300 mm X 300 mm pre- cast/cast in -situ RCC cable ducts including top cover as per RDSO drawing No. SDO/S&T/RCC DUCT/1018/1 & 2, dated 29.5.23 or latest. Note- The rate is inclusive of all type of transportation including labour till it is placed into trenches. The laying of cables shall be paid separately fulfilling the laying procedure as per above drawings. | Metre | 500.00 | 3,503 | 17,51,500 |
| 18 | Supply & laying of 1200 mm X 1200 mm X 1500 mm pre-cast/cast in -situ RCC chamber including top cover to connect cable ducts (300 mm X 300 mm and/or 300 mm X 100 mm or both individual) as per RDSO drawing No. SDO/S&T/RCC DUCT/1019/1 & 2, dated 29.5.23 or latest. Note- The rate is inclusive of all type of transportation including labour till it is placed into trenches. The laying of cables shall be paid separately fulfilling the laying procedure as per above drawings. | Numbers | 4.00 | 44,112 | 1,76,448 |
| 19 | Laying of S&T Cables (Signal/Quad/Power) in the excavated trench to Drawing No. CON/SK/T/5 or latest. Supply and transportation of 'U' clamps, anchoring of cable at every 10 metres interval with 'U' clamp on trench to Drawing No. CSTE/CON /CABLES/81 or latest. Supply, transportation, and placing of cable demarcating led belt to Drawing No. CON/SK/T/6 or latest punched at an interval of 30 metres and wrapped round each cable throughout the cable route and also at every track/Road/ platform crossing as above specified in Technical Circular No. 2/1988 & 01/2010 issued by CSTE/SER or as per latest guidelines and guarding the cables. Collecting empty drums with left over cable and to be returned to the stores of stock holder. Note: Cables will be meggered before & after its laying by contractor under supervision of Railway representative & Contractor will submit their reports. | Kilometre | 16.00 | 20,239 | 3,23,824 |
| 20 | Execution of Full Apparatus Case with earth excavation for pit, concrete foundation, surrounding earth work, erection and installation as per Drawing No. Con/SK/T/8 or latest and wiring to be done as per SEM Drawing No.19-D8 or as per direction of site engineer. Supply and fixing of Hylam sheet strip of appropriate size of 3 mm or 6 mm as required with hole for fixing of terminals, fuse blocks, relay and other accessories for signal/track circuit, termination of cable with number embossed ferrules, bunching of cables with PVC tape, proper soldering of cable armour with earth catenary wire, earthing of cable armour as required. Writing & terminal description including Painting of the apparatus case inside and outside after clearing the surface thoroughly and first coating of anticorrosive paint and subsequent two coats of Aluminium paint outside and red oxide inside and lettering etc. This also includes transportation of 25 mm/12mm Hylam sheet for shelf or as required and also includes minor modification in L/Boxes as per site requirement. The contractor shall supply 4 no. of foundation nuts & bolts of size 22 mm dia. x 450 mm long with 2 flat spring washers, with each nut & bolts, sand for filling up cable pit inside the apparatus case including plaster and bolts, nuts, screws, MS Clamps for fixing equipment/cable. Note: - Part payment shall be released after completion of- (i) Foundation- 40%, (ii) Erection - 10%, (iii) Wiring, earthing, testing - 20%, (iv) Painting, writings - 10%, (v) Plastering, sand filling & etc. - 10%, (vi) Commissioning - 10%. | Numbers | 12.00 | 9,147 | 1,09,764 |
| 21 | Installation, testing & commissioning of Fuse Auto Change Over System type-I / II along with audio visual indication as per RDSO spec. No. RDSO/SPN/209/2012 Ver.1.0 or latest. | Numbers | 3.00 | 1,210 | 3,630 |
| 22 | Transportation and installation of 2-Aspect Signal Post for MACLS as per drawing no. Con/SK/T/12 or SEM-Drawing No. 19-D3 or RDSO/M-00011RU dated 12.01.18 or latest complete with signal units, base, ladder and other fittings, excavation of earth pit, casting concrete foundation, erection of posts, thereof as specified in the note given in drawing, fixing of complete fittings of the signals with necessary earth screen protection arrangement as required including termination of cables, painting and lettering as required. Foundation nuts & bolts of appropriate size as per above drawings or latest as per RDSO Drawing No. SA-116 A/M confirming to IS: 226 and IRS:S- 10/78 Rev.8. or latest to be supplied. | Numbers | 6.00 | 10,788 | 64,728 |
| 23 | Fixing of 'P'/'G'/'C'/'A'/'AG'/'IB'/Marker/Arrow marker/ Signal Number plates with complete fittings as per site requirement. | Numbers | 10.00 | 196 | 1,960 |
| 24 | Alteration/Modification, testing, commissioning, two coat painting, wiring, lettering of the existing Multi aspect signals/Shunt/Calling-On Signals to suit the circuit as per approved wiring diagram. | Numbers | 1.00 | 2,692 | 2,692 |
| 25 | Transportation, Grouting/Erection, wiring as per approved wiring diagram on 19" Relay rack/Composite/Q-Series Relay Rack with subsequent alteration. This includes supply of 3/4 X 9" anchor nuts & bolts, washer, D- bracket & 60mm insulator, supply & fixing of M.S. ladder as per requirement for rack to rack connection, on CTR and control panel, fixing of plug boards, relays, terminal blocks, terminals, filter units, tag blocks, fuses, bus bars, shelves, strips, 6mm Hylam sheet of required length for writing terminal description etc., fixing and termination of cables on the relay racks with number embossed ferrules, bunching of cables with PVC tape, earthing of cable armour including painting and lettering. Wiring and testing of complete relay rack accommodating all relays as per wiring diagram. Cement, stone chips & sand as required for mounting to be provided by contractor. All materials such as eyelets, Hylam sheets, ferrules, trough etc., if required for modification of rack shall be supplied by the contractor and to be carried out at site with no extra cost to the Railway. | Numbers | 2.00 | 47,638 | 95,276 |
| 26 | Transportation, grouting/erection, fixing and installation of Cable Termination rack (CTR), fixing of MS Wiring ladder from relay rack to CTR, and on to top of the CTR- including supply of 3/6mm Hylam sheet of required size for fixing terminal blocks & writing terminal description, termination of cables, bunching of cables by PVC tape and earthing of cable armours, painting, lettering as required. The contractor shall draft terminal analysis chart on the white bond paper of appropriate size & supply wiring materials like eyelets of sizes, trough, condensers and resistances as per required capacity, HV protection cover with fixing top caps and danger symbol, soldering material of approved quality etc. shall be supplied by the contractor. Cement, stone chips and sand as required for mounting CTR, Sand for filling of cable pit and other required masonry work, Sundry materials such as MS plate/angles, MS wiring ladders as per approved Drawing, , Anchor bolt 5/8" X 9" with nut and washers -4 No., Nickel plated screws 2BA X1" with nuts and washers for fixing Hylam sheet, numbers embossed ferrules 2.5 sq. mm, PVC bunching tapes and buttons, paint synthetic enamel of smoke grey colour for painting, MS clamps with bolts and nuts of sizes, D-bracket and 60mm insulator, for fixing cables, screws of sizes as required shall be supplied by the contractor. Cables should be routed properly through ladder. | Numbers | 1.00 | 51,944 | 51,944 |
| 27 | Installation, Wiring, Testing, Validation and commissioning of Remote terminal unit with 128 Digital & 16 Analog inputs with modem as per Specification No. IRS:S-99/2006 (Amdt-3) or latest. | Set | 1.00 | 18,574 | 18,574 |
| 28 | Transportation, installation and wiring of Rotary key transmitters/KLCR on Hylam sheet board including wiring & fixing of push button bell switch on Hylam sheet of 12mm including termination, painting & lettering. The sundry materials such as Hylam sheet, push bell switch etc. to be supplied by contractor. | Numbers | 2.00 | 1,553 | 3,106 |
| 29 | Supply and Installation of Glass fronted Key box made of water resistant Engineered wood for Rotary key transmitter (RKT)/EKT/KLCR/SM's key box of appropriate size etc. with locking arrangement and 1 no. of Godrej make padlock. it should be done as per site supervisor instructions. After installation it should be painted and letter writing as per SER practice. | Numbers | 3.00 | 2,301 | 6,903 |
| 30 | Transportation, grouting and laddering of Integrated Power Supply (IPS) System including laying & termination of power & signalling cables through ladder on Hylam sheet, fixed on MS angle, by contractor on wall in panel/IPS room of adequate size, painting & lettering. Note: Transportation of batteries, electrolyte, bolts & nuts, screws, trough etc. and other sundry materials required for the above work shall be supplied by the contractor as required. The IPS to be commissioned by the OEM. | Set | 1.00 | 43,881 | 43,881 |
| 31 | Transportation, installation, testing and commissioning of Electric lifting barrier (ELB) which includes excavation of pit, casting of foundations, fixing of pedestals, Boom rest etc., installation and wiring of control panel, booms for level crossing gate complete in all respect including provision of boom locking arrangements with fixing of boom light box, stop board boom rest and equipment of operation of gate from control panel, painting, lettering with following accessories:- (i) 2 (two) nos. lifting barriers with all accessories. (ii)1 (one) Control panel (iii) Positive boom locking arrangements for above. (iv) Emergency crank handle attachment (v) Timer unit to adjust the time for operating the barrier (vi) Fixing of Hooters/Flashers on either side of gate barrier. | Set | 1.00 | 53,846 | 53,846 |
| 32 | Transportation, installation, testing and commissioning of Emergency Sliding Boom at LC gates which includes casting of total 10 nos. concrete foundation including surrounding earthwork, fixing of lock post, clamps, welding of channel, cutting of rail post if required as per site condition. Note: All materials to be supplied by the contractor except Sliding Boom gates & key lock 'E' type. | Set | 1.00 | 49,416 | 49,416 |
| 33 | Installation, wiring, testing and commissioning of the Control cum Indication panel type at Mid-section interlocked LC Gate/IBS/Siding motor operated point operation panel /Non-Interlocking panel of Single/Double line section as per approved interlocking plan, FPD, circuit diagram etc | Set | 1.00 | 6,062 | 6,062 |
| 34 | Erection of Earth Electrode as per Drg. No. RE/33/P/7021 (MOD. ''F'') or latest including connection of Earth Leads 50 mm X 6 mm mild steel and 8 SWG G. I. Wire as per Drg. No. RE/33/P/7021 (MOD. ''F'') or latest. | Numbers | 16.00 | 2,348 | 37,568 |
| 35 | Installation of Single Maintenance Free Earth pit as per RDSO Drawing No. SDO / RDSO/ E&B/001 which includes the following, a) Digging/Auguring/Boring of single earth pit of 100mm to 125mm dia. to the depth of approx. 3 meter. b) Insertion of 3.0 meter electrode and penetrating it minimum 150 mm by pushing gently with sledge hammer where the natural soil is assumed. (c) Filling of earth pit with Earth Enhancement Compound (EEC) in slurry form and backfilling. (d) Carrying out exothermic weld connection on single earth electrode to a copper tape of 200 x 25 x 6 mm. (e) Carrying out exothermic weld connection on the copper tape of 200 x 25 x 6 mm on Earth Electrode for connecting two 35 Sq. mm cables for redundancy. (f) The exothermic welding material for bonding the earth system shall be procured from RDSO approved firms, which includes graphite modules, clamps, weld metal powders etc. (g) The dimension of the chamber will be of 300 x 300 x 300 mm (inside dimension) of RCC with 50mm thick and fine finish, Inspection chamber should be as per IEC 62561-5 or latest. The top RCC cover size shall be 400 mm X 400 mm X 50mm. The date of testing and earth resistance value shall be written on the cover with black base with yellow paint or as per instruction of site engineer. | Set | 8.00 | 6,098 | 48,784 |
| 36 | Routing and connecting of all the equipment in the equipment/relay room to SEEB with 10 sq. mm copper cable using copper lugs with stainless steel nut and bolts and fixtures. The work includes laying and routing the copper cable in PVC / conduits and fixing them on wall. The PVC/conduit pipe to be supplied by Railway. | Metre | 50.00 | 58 | 2,900 |
| 37 | Routing and connecting of all the SPDs in the equipment room/SEEB to MEEB with 16 sq. mm copper cable using copper lugs with stainless steel nut and bolts. The work includes laying and routing the copper cable in PVC / conduits and fixing them on wall. The PVC/conduit pipe to be supplied by Railway. | Metre | 50.00 | 58 | 2,900 |
| 38 | Digging a trench to a depth of at least 0.5 meter and run the two 35 sq. mm earth conductor in protective PVC conduit pipe, procured against supply item, from Earth pit to MEEB. Routing and exothermic termination of two 35 sq. mm cable on earth conductors as well as on 300 mm X 25 mm X 6mm MEEB, which is to be fixed inside the equipment room with two 60mm insulation studs. The 60mm insulation studs have also to be supplied. | Metre | 50.00 | 90 | 4,500 |
| 39 | Installation of Class B & C Surge protection Device (SPD) -Type I & II. All fitting material to be provided by the contractor. | Set | 2.00 | 443 | 886 |
| 40 | Fabrication of stand/rack, installation, testing & commissioning of Earth Leakage Detector (ELD)- 8 channels as per Specification No. RDSO/SPN/ 256/2002 or latest. | Set | 1.00 | 5,947 | 5,947 |
| 41 | Execution of Straight joint on Quad cable/ jelly filled Telecom cable using Thermo- shrink/Universal jointing kit (RTSF). This includes excavation of cable joint pit of size 1.5 m X 1.5 m X 1.2 m for jointing of cables, back filling and ramming after jointing. After jointing, the cable through test such as insulation test, continuity test etc. to be carried out jointly with Railway Engineer. If any defect or any damage is observed during jointing the contractor has to redo the joint free of cost. Note: In case jointing is required to be done in the Location boxes, then 80% payment will be released. | Numbers | 5.00 | 1,437 | 7,185 |
| 42 | Splicing of Optical Fiber Core and routing in joint closure/FDMS as per instruction of site Engineer. | CORE | 96.00 | 152 | 14,592 |
| 43 | 20 pair C.T. Box/Krone type DP Box | Numbers | 6.00 | 916 | 5,496 |
| 44 | Preparation of yard diagrams/Auto section diagram/speed restriction board etc., printing in star flex/vinyl with glossy lamination and installation at site as per requirement. Note: (1) The contractor may submit a paper print of yard diagram/Auto section diagram/speed restriction board etc. for checking to Railway. The same paper print diagram with corrections will be returned to the Contractor. Then after incorporating all corrections the contractor submits another paper print to Rlys and will take permissions of Railway for final print. (2) The contractor should submit the final soft copies of yard diagrams in CD/Pen drive to Railway (3) This includes supply of board of suitable sizes with fixing arrangements on wall. (4) The printing should be clearly visible from 3-4 feet. | Square Foot | 12.00 | 776 | 9,312 |
| 45 | Fixing, testing & commissioning of MCB of any capacity to the location (Relay rack/CTR/Wall/others) as advised by Railway Engineer. The sundry materials required for fixing of the same to be supplied by the contractor. | Numbers | 50.00 | 73 | 3,650 |
| Schedule total | ₹39,12,100.5 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
16_ParallelingofRelaycontacts_23-01-25.pdf
ATTACHMENT
05_MandateForm_1.pdf
ATTACHMENT
SpecialTermsandConditionsTenderRT-11_28-04-26.pdf
ATTACHMENT
AnnxS_RT-11_28-04-26.pdf
ATTACHMENT
01_GCC_April-2022.pdf
ATTACHMENT
02_GCCCorrectionSlipNos1to10.pdf
ATTACHMENT
03_AnnexureVIB.pdf
ATTACHMENT
04_CertificateregardingRetiredRailwayEmployees.pdf
ATTACHMENT
1_PolicyGuidelineforSignalingWorkinSER_06-06-25.pdf
ATTACHMENT
4_2025-07-04-TAN3006ver3.1_RevisedTANonEarthing.pdf
ATTACHMENT
6_GuidelinesforEarthingBondingSurgeandLightningProtection.pdf Policy Guidelines
ATTACHMENT
13_Cable_duct_policy_st_29-03-23.pdf
ATTACHMENT
Policy Guidelines
ATTACHMENT
15_ProformaforconductingQualityAuditInspectionofSnTworks.pdf Policy Guidelines
ATTACHMENT
18_WritingatSignallingInstallations_06-11-23.pdf
ATTACHMENT
20_RBcallingonapproachboard2025.pdf
ATTACHMENT
6_GuidelinesforEarthingBondingSurgeandLightningProtection.pdf
ATTACHMENT
14_TechnicalCircular02-2024_GuidelinesforSTcablelayinginducts_29.02.2024.pdf
ATTACHMENT
15_ProformaforconductingQualityAuditInspectionofSnTworks.pdf
ATTACHMENT
21_Tele_Cir_9-2023.pdf
ATTACHMENT
22_JPOCableCut19Feb2024.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .