| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.3 LAccepted-AOC | 1 | Accepted-AOC L1 | |
| 2 | 2₹2.4 L+₹1,590 (0.67%)Rejected-AOC | 2 | Rejected-AOC L2 |
Tender Value
₹2.3 L
EMD Value
₹2,200
Closing Date
1 Jun 2019, 6:15 pmClosed
SE / M-II / TTPS
Superintending Engineer, Mechanical-II, Tuticorin Thermal Power Station, Tuticorin
TTPS Mech II BM Unit III Replacement of Thermo couple at various locations of Boiler from 13 Mtr to 52 Mtr elevation in CRH HRH steam line Arresting of buck stay with water wall front side at 18 Mtr and 21 Mtr elevation in Unit III Boiler
2019_EB_126820_1
SE / M-II / TTPS / Spec.No.116 / 2019 - 20
Open Tender
Miscellaneous Works
Item Rate
12 days
TTPS
As per BQR conditions in NIT
7 documents required · 7 mandatory
₹0
₹2,200
Yes
14 Jan 2020
27 May 2019
3 Jun 2019
27 May 2019
1 Jun 2019
27 May 2019
Charges for renewal of defective boiler tubes of size 44.5mm OD inclusive of transportation, cutting of defective tubes, edge/spool preparation,welding with IBR welder and assisting for hydraulic test.
Charges for transporting of 1 No. sky climber from Boiler maintenance stores to site, erection of sky climber for cleaning of water wall in all sides of Boiler and removal of sky climber, return back to stores after completion of works.
Charges for shifting the sky climber inside the furnace for access of front water wall
Charges for leading, lifting and arranging platform and scaffolding wherever required in the boiler and dismantling after completion of work.
Charges for providing refractory over the CRH, HRH steam line including transportation of refractory from stores and water from 0mtr level to the required elevation, etc complete.
Charges for renewal and repairing of Damaged Insulation and Re-fixing of Skin casing inclusive of necessary Scaffolding arrangements.
Rectification of buck stay beams & supports by bringing to the original position, providing suitable locking pin and washer etc. and welding the scalloped bar, locking pin and washer and providing channels etc. charges inclusive of cost of scaffolding arrangements.
BINDHU ENTERPRISES
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .