Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.8 CrAccepted-AOC | ₹3.8 Cr Quoted ₹4.5 Cr | 1 | Accepted-AOC only firm to qualify technically and firm gave 15 percentage discount on quoted rates |
| 2 | Rejected-Technical | - | - | Rejected-Technical Firm disqualify due to non submission of requisite documents |
| 3 | Rejected-Technical 1 VISHVAS NAGAR GONIANA ROAD P O NFL BATHINDA 151 003 | BATHINDA | BATHINDA | PUNJAB | 151003 | - | - | Rejected-Technical Firm disqualify due to non submission of requisite documents |
| 4 | Rejected-Technical 1 20 OCHERI ROAD AMMANOOR POST ARAKKONAM 631 002 | ARAKKONAM | RANIPET | TAMIL NADU | 631002 | - | - | Rejected-Technical HEWP contractor ID submitted by firm was prepare after due date of submission of Tender hence disqualified |
Tender Value
₹3.1 Cr
EMD Value
₹7.4 L
Closing Date
22 Apr 2024, 6:00 pmClosed
Pravin Kumar
CE RGTPP Khedar Hisar
Annual Maintenance Contract of Coal Mills (Bowl Mill HP-1103), Gravimetric Raw Coal Feeders (Belt Type) and Pulverized Fuel Piping for Unit-I and Unit-II at 2x600MW, RGTPP, Khedar, Hisar, Haryana
2024_HBC_369551_1
2024FEC94C47 4CED 4013 AFFC D91F6602E16E712PGC
Open Tender
Power/Energy Projects/Products
Works
825 days
KHEDAR
As per PQR of NIT
2 documents required · 2 mandatory
₹1,180
₹7.4 L
Yes
20 Jul 2024
15 Mar 2024
24 Apr 2024
15 Mar 2024
22 Apr 2024
15 Mar 2024
Amount
For Scope of work under Part-A, for First Year: Lump Sum Monthly Charges for both Units-I&II for Main Scope of work under Part-A (i.e. work of General / Routine / preventive/ breakdown Maintenance of Coal Mills (Bowl Type HP 1103) Gravimetric RC Feeders (Belt Type), PF Piping’s for 2x600 MW Unit-I&II at RGTPP, Khedar, Hisar as per scope of Work at Annexure-V)
For Scope of work under Part-B (Annexure-VI), for First Year (from 1.02 to 1.71)
Repair, replacement / servicing of 03 Nos. journal assy. including journal head liners, trunion bushes & all its components including alignment of bearings for all three nos. roller assy, oil seals and seal wear ring replacement and again installation and normalization including hard facing, if any without roller replacement.
Work same as above, for 1 no. roller assy.
Replacement / repair and servicing of spring assembly opening and re-fixing of all components. Setting the desired spring compression and normalization.
Removal of journal assembly from mill, Replacement of mills grinding roll and re-fixing (3 Nos.)
Work same as above, but for one roller assembly.
Replacement of trunion bush for 1 no. roller assy.
Rotation of trunion from one position to another for all three roller assembly of mill.
Replacement of worn-out bull ring segments and normalization.
Replacement of bowl extension ring segment's (Set of Eight pieces).
Work same as above, for one Bowl extension ring segments.
Replacement of complete worn-out vane wheel assembly consisting of Eight segments.
Work same as above, for one no. vane wheel segments.
Replacement of air restriction ring.
Replacement of air restriction ring.
Replacement of deflector liners support on all three sides of mills.
Replacement of deflector liners supports one side of mills.
Replacement of all deflector liners consisting of lower deflector liners & intermediate liners with weld plug arrangement.
Replacement of any type of the deflector liner/jr. assy. Guard/RLD/bottom liner/ with weld plug arrangement.
Repair/Replacement of upper & lower skirt assy. and normalization including cleaning of seal air ports.
Repair/Replacement of lower skirt assy. and normalization including cleaning of seal air ports.
Replacement of scrapper assembly.
Decoupling and Coupling of Mill including replacement of components, if required.
Replacement / Repair of mill motor coupling, mill motor alignment & normalization.
Replacement/servicing of Pulverized Coal Gate valve (Mill Discharhe Valves or MDVs).
Repair / Replacement of 1 No. MPO After removing of discharge gate valve including hard facing, if any, re-fitment / alignment of PC pipes & necessary locking of pipes.
Repair / Replacement of all 4 Nos. MPO after removing of all 4 nos. discharge gates, hard facing if required including locking of coal pipes.
Replacement / repair / hard facing of ventury and ventury collar.
Replacement/Repair/Rotations of inner cone and hard facing if required.
Servicing / Replacement of all the classifier vanes of coal mill.
Replacement / repair of ventury vanes set of 4 PCs & hard facing, if required.
Replacement of mill side liners & Wear Plate including providing the insulation.
Gap Setting of Clearance Air Seal Assy. including opening & refixing of air seal guard.
Complete overhauling of mill including all the works mentioned above, as per requirement of mill.
Repair of bowl/bowl hub or both.
Replacement of damaged bolts of mill base of mill after opening of bowl cover and related components including tilt out of roller assy., if required. Refixing and normalizing.
Replacement of Lube Oil after cleaning / flushing of oil tank and gear box. Diesel for flushing shall be arranged by the firm.
Replacement of bolts of inner cones / support pipes (03 Nos.) of inner cones of coal mills.
Servicing of raw coal gate (feeder inlet / feeder outlet / Bunker outlet).
Replacement / opening & refixing of belt including cleaning / servicing of head pulley/take up pulley /span rollers all the relevant components (full work).
Opening & refixing of all skirt plates including repairs if any.
Servicing /replacement of belt drive reducer gear box including replacement of components.
Decoupling/coupling of belt drive motor & its alignment with gear box.
Replacement / opening & refixing of dresser coupling of RC feeder.
Repair / Replacement of Down Spout/Cone of center feed pipe of RC Feeder.
Repair / servicing of cleanout conveyor chain by changing chain pin / link etc. and normalization of relevant components.
Repair / servicing / replacement of cleanout conveyor gear box including normalization.
Attending leakage by MS/SS welding in coal discharge feed pipe or any location for attending leakage by patch. The size of patch is Approx. up to 250X300 mm and 12mm thick.
Erection and removal of scaffolding to facilitate maintenance work at coal mill/PC piping/Raw & pulverized coal gates at any location above 3 mtr. Sqr.
Replacement of PC bends/elbow or transition piece / Spool piece with coupling or after fitting of 1meter straight pipe at both ends.
Replacement / opening and refixing of Victaulic coupling including replacement of rubber gasket.
Opening and refixing of expansion bellow assembly of pulverized coal pipe including repair of protection plate at inside.
Replacement of straight pieces of coal discharge pipe of diameter 28“/center feed pipe of mill.
Replacement/Repair / Servicing of wearable adjustable shrink hole (adjustable orifice) in pulverized coal piping.
Servicing of one no. power cylinder & reinstalling In its position.
Servicing of hot air regulating dampers including replacement of bearings of shaft/links if any (06 Nos.)
Servicing of cold air gate/ hot air gate including replacement of SS seals of hot shut off gates, if any
Servicing of cold air damper.
Replacement of Actuator installed at hot / cold / mix air damper and Feeder gates at any elevation.
Servicing of mechanical portion of actuator / replacement of actuator. Mechanical servicing of seal air damper/feeder outlet or inlet gate.
Replacement of water line valve/ airline valve/ flow-Sight (including servicing) up to I00mm.
Servicing of any seal air valve in mill/ RC feeder.
Clearing of choking of mill at duct inlet/scrapper body.
Replacement / repair of eroded MS sheet of duct.
Welding of air duct / Structure.
Repairing/servicing of hoist in coal mill areas. (16 Ton capacity single girder under slung beam motorized LT drive).Total hoists installed 28 Nos.
Alignment of the motor & gearbox of hoist.
Lube oil pump replacement/repair including opening and refixing of spider rubber / coupling and alignment.
Replacement / servicing of mech. Seal of lube oil pump, orifice replacement / preventive maintenance including replacement of spider rubber and alignment
Painting after thorough cleaning of surface (Two coats). Paint to be provided by HPGCL.
Fabrication and erection of Steel (Time as per indent).
For Scope of work under Part-A, for Second Year : Lump Sum Monthly Charges for both Units-I&II for Main Scope of work under Part-A (i.e. work of General / Routine / preventive/ breakdown Maintenance of Coal Mills (Bowl Type HP 1103) Gravimetric RC Feeders (Belt Type), PF Piping’s for 2x600 MW Unit-I&II at RGTPP, Khedar, Hisar as per scope of Work at Annexure-V)
For Scope of work under Part-B (Annexure-VI), for Second Year (from 2.02 to 2.71)
Repair, replacement / servicing of 03 Nos. journal assy. including journal head liners, trunion bushes & all its components including alignment of bearings for all three nos. roller assy, oil seals and seal wear ring replacement and again installation and normalization including hard facing, if any without roller replacement.
Work same as above, for 1 no. roller assy.
Replacement / repair and servicing of spring assembly opening and re-fixing of all components. Setting the desired spring compression and normalization.
Removal of journal assembly from mill, Replacement of mills grinding roll and re-fixing (3 Nos.)
Work same as above, but for one roller assembly.
Replacement of trunion bush for 1 no. roller assy.
Rotation of trunion from one position to another for all three roller assembly of mill.
Replacement of worn-out bull ring segments and normalization.
Replacement of bowl extension ring segment's (Set of Eight pieces).
Work same as above, for one Bowl extension ring segments.
Replacement of complete worn-out vane wheel assembly consisting of Eight segments.
Work same as above, for one no. vane wheel segments.
Replacement of air restriction ring.
Replacement of air restriction ring.
Replacement of deflector liners support on all three sides of mills.
Replacement of deflector liners supports one side of mills.
Replacement of all deflector liners consisting of lower deflector liners & intermediate liners with weld plug arrangement.
Replacement of any type of the deflector liner/jr. assy. Guard/RLD/bottom liner/ with weld plug arrangement.
Repair/Replacement of upper & lower skirt assy. and normalization including cleaning of seal air ports.
Repair/Replacement of lower skirt assy. and normalization including cleaning of seal air ports.
Replacement of scrapper assembly.
Decoupling and Coupling of Mill including replacement of components, if required.
Replacement / Repair of mill motor coupling, mill motor alignment & normalization.
Replacement/servicing of Pulverized Coal Gate valve (Mill Discharhe Valves or MDVs).
Repair / Replacement of 1 No. MPO After removing of discharge gate valve including hard facing, if any, re-fitment / alignment of PC pipes & necessary locking of pipes.
Repair / Replacement of all 4 Nos. MPO after removing of all 4 nos. discharge gates, hard facing if required including locking of coal pipes.
Replacement / repair / hard facing of ventury and ventury collar.
Replacement/Repair/Rotations of inner cone and hard facing if required.
Servicing / Replacement of all the classifier vanes of coal mill.
Replacement / repair of ventury vanes set of 4 PCs & hard facing, if required.
Replacement of mill side liners & Wear Plate including providing the insulation.
Gap Setting of Clearance Air Seal Assy. including opening & refixing of air seal guard.
Complete overhauling of mill including all the works mentioned above, as per requirement of mill.
Repair of bowl/bowl hub or both.
Replacement of damaged bolts of mill base of mill after opening of bowl cover and related components including tilt out of roller assy., if required. Refixing and normalizing.
Replacement of Lube Oil after cleaning / flushing of oil tank and gear box. Diesel for flushing shall be arranged by the firm.
Replacement of bolts of inner cones / support pipes (03 Nos.) of inner cones of coal mills.
Servicing of raw coal gate (feeder inlet / feeder outlet / Bunker outlet).
Replacement / opening & refixing of belt including cleaning / servicing of head pulley/take up pulley /span rollers all the relevant components (full work).
Opening & refixing of all skirt plates including repairs if any.
Servicing /replacement of belt drive reducer gear box including replacement of components.
Decoupling/coupling of belt drive motor & its alignment with gear box.
Replacement / opening & refixing of dresser coupling of RC feeder.
Repair / Replacement of Down Spout/Cone of center feed pipe of RC Feeder.
Repair / servicing of cleanout conveyor chain by changing chain pin / link etc. and normalization of relevant components.
Repair / servicing / replacement of cleanout conveyor gear box including normalization.
Attending leakage by MS/SS welding in coal discharge feed pipe or any location for attending leakage by patch. The size of patch is Approx. up to 250X300 mm and 12mm thick.
Erection and removal of scaffolding to facilitate maintenance work at coal mill/PC piping/Raw & pulverized coal gates at any location above 3 mtr. Sqr.
Replacement of PC bends/elbow or transition piece / Spool piece with coupling or after fitting of 1meter straight pipe at both ends.
Replacement / opening and refixing of Victaulic coupling including replacement of rubber gasket.
Opening and refixing of expansion bellow assembly of pulverized coal pipe including repair of protection plate at inside.
Replacement of straight pieces of coal discharge pipe of diameter 28“/center feed pipe of mill.
Replacement/Repair / Servicing of wearable adjustable shrink hole (adjustable orifice) in pulverized coal piping.
Servicing of one no. power cylinder & reinstalling In its position.
Servicing of hot air regulating dampers including replacement of bearings of shaft/links if any (06 Nos.)
Servicing of cold air gate/ hot air gate including replacement of SS seals of hot shut off gates, if any
Servicing of cold air damper.
Replacement of Actuator installed at hot / cold / mix air damper and Feeder gates at any elevation.
Servicing of mechanical portion of actuator / replacement of actuator. Mechanical servicing of seal air damper/feeder outlet or inlet gate.
Replacement of water line valve/ airline valve/ flow-Sight (including servicing) up to I00mm.
Servicing of any seal air valve in mill/ RC feeder.
Clearing of choking of mill at duct inlet/scrapper body.
Replacement / repair of eroded MS sheet of duct.
Welding of air duct / Structure.
Repairing/servicing of hoist in coal mill areas. (16 Ton capacity single girder under slung beam motorized LT drive).Total hoists installed 28 Nos.
Alignment of the motor & gearbox of hoist.
Lube oil pump replacement/repair including opening and refixing of spider rubber / coupling and alignment.
Replacement / servicing of mech. Seal of lube oil pump, orifice replacement / preventive maintenance including replacement of spider rubber and alignment
Painting after thorough cleaning of surface (Two coats). Paint to be provided by HPGCL.
Fabrication and erection of Steel (Time as per indent).
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .