| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹35.4 LAccepted-AOC 715 B GANDHI NAGAR THANESAR DISTT KURUKSHETRA | THANESAR | KURUKSHETRA | HARYANA | 136118 | ₹35.4 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹36.4 L+₹1.0 L (2.84%)Rejected-Finance VILLAGE GUDHA DISTT KARNAL | KARNAL | HARYANA | ₹36.4 L+₹1.0 L (2.84%) | L2 | Rejected-Finance Reject |
| 3 | L3₹38.8 L+₹3.5 L (9.81%)Rejected-Finance HOUSE NO 104 SECTOR 13 KURUKSHETRA | KURUKSHETRA | HARYANA | 136030 | ₹38.8 L+₹3.5 L (9.81%) | L3 | Rejected-Finance Reject |
| 4 | L4₹40.4 L+₹5.1 L (14.3%)Rejected-Finance SHOP NO 5 WARD NO 12 132041 | KARNAL | KARNAL | HARYANA | 132041 | ₹40.4 L+₹5.1 L (14.3%) | L4 | Rejected-Finance Reject |
Tender Value
₹41.1 L
EMD Value
₹82,000
Closing Date
4 Jul 2026, 5:00 pmClosed
BHANWAR SINGH
Municipal Committee Taraori
Const. of RCC Road from Shop Bhula Ram Kabadi to H/o Shri Lalit Choudhary in ward no.15, MC Taraori. only for society
2026_HRY_531834_1
20266806EED8 9E35 41E4 B8FA 8F29894B7D98310ULB
Open Tender
Civil Works
Works
180 days
Taraori
Const. of RCC Road from Shop Bhula Ram Kabadi to H/o Shri Lalit Choudhary in ward no.15, MC Taraori.
2 documents required · 2 mandatory
₹4,000
₹82,000
Yes
1 Aug 2026
26 Jun 2026
6 Jul 2026
26 Jun 2026
4 Jul 2026
26 Jun 2026
26 Jun 2026 - 28 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | [13.29.2]Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 2. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works [Through Rate] | 880 | Kg. | 83 | ₹73,040 |
| 2 | [17.13]Granular Sub-Base (Mix in place) Construction of granular sub-base by providing Material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with Rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per technical clause 401 of MORT&H technical specifications [Through Rate] | 253.22 | cum | 1,094 | ₹2,77,022.68 |
| 3 | [17.70]Removal of existing IPB by manual means and disposal of dismantled material with all lead and lift as per technical specification clause 202.3. [Through Rate] | 1,665.92 | Sqm | 26 | ₹43,313.92 |
| 4 | [21.2.3]Dismantling existing drains of different sizes cunnettes, section only including recovery of all useable materials, stacking the same near site of dismantled works and disposal of all rubbish off site of works. 3. Type II Drain [Through Rate] | 2,000 | 10 Metres | 664 | ₹13,28,000 |
| 5 | [21.54]Constructing standard drain type II drain complete consisting of cement concrete drain moulded and laid over lime concrete foundation rendered and finished smooth with 6 mm thick rendering concrete to be 1:3:6 Paris by volume of cement sand stone Bajri and rendering to be 1:1 cement and mortar. [Through Rate] | 608 | Metre | 363 | ₹2,20,704 |
| 6 | [22.218.2]Providing and Supplying of class SN 8 structured wall Polyethylene Piping system (Pipe with online/ offline coupler and elastomeric sealing ring) with non smooth external annular corrugated and smooth internal surface (double wall) for non-pressure underground sewerage and drainage application as confirm to IS 16098 (part II):2013 including transportation, frieght charges, inspection charges, loading, unloading, complete as specified and directed by Engineer In-Charge. 2. 300 mm Internal Diameter [Through Rate] | 100 | Metre | 701 | ₹70,100 |
| 7 | [22.219.2]Lowering, Laying and jointing of class SN 8 structured wall (External Annular Corrugated and Smooth Internal Surface Polyethylene Piping and fitting with the help of coupler(online/ offline) attached with one end of pipes, sliding over the elastomeric sealing rubber ring placed on the specified valley of the corrugation at the spigot end, lowering the same into the trench, laying on the lower bedding (constructed at bottom of trenches) at prescribed gradient, depth and alignment, testing the water tightness of the joints, ensuring the continuity tests of specified pipe segment etc. complete as per drawing, specification and detailed engineering, including cartage of pipes and fitting etc. as per direction of Engineer-in-charge. 2. 300 mm Internal Diameter [Through Rate] | 100 | Metre | 130 | ₹13,000 |
| 8 | [3.1.1]By Mechanical Transport including loading, unloading and stacking 1. Lime, moorum, building rubbish [5km] | 782.31 | cum | 66 | ₹51,632.46 |
| 9 | [5.23.2]Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. 2. Nominal concrete 1:2:4 or leaner mix (i/c equivalent design mix) [Through Rate] | 32.9 | cum | 1,149 | ₹37,802.1 |
| 10 | [6.1.1]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 1. 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size) [Through Rate] | 379.83 | cum | 3,975 | ₹15,09,824.25 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.72 MB
BOQ_610893.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .