Tender Value
₹24.3 Cr
EMD Value
₹13.6 L
Closing Date
29 Jan 2026, 3:00 pmClosed
Yes (up to 2 members)
No
Two Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
90 days
Expenditure
Capital (Works)
Above/Below/Par
RE NNL
15 conditions · 2 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V'whichever is less; where V= Advertised value of the tender in crores of Rupees =Number of years prescribed for completion of work for which bids have been invited. Theaverage annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIII, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate
Bid Capacity: The tender/technical bid will be evaluated based on bid capacity formulated as Annexure-D. Tenderer shall furnish Annexure-V and annexure-XIX both duly certified by Chartered Accountant.
(a)The tenderer must have successfully completed/substentially completed any of the following during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i)Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or (ii) Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or (iii) One similar work each costing not less than the amount equal to 60% of advertised value of the tender. (b) (i) In case of composite works (e.g. works involving more than one distinct component, such as Civil Engineering works, S&T works, Electrical works, OHE works etc. and in the case of major bridges - substructure, superstructure etc.), tenderer must have successfully completed/substantially completed any of the following during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: Three similar works each costing not less than the amount equal to 30% of advertised value of each component of tender, or Two similar works , each costing not less than the amount equal to 40% of advertised value of each component of tender, ora One similar work, each costing not less than the amount equal to 60% of advertised value of each component of tender. Note: Separate completed works of minimum required values for each component can also be considered for fulfillment of technical eligibility criteria. (b) (ii) In such cases, what constitutes a component in a composite work shall be clearly pre-defined with estimated tender cost of it, as part of the tender documents without any ambiguity. Any work or set of works shall be considered to be a separate component, only when cost of the component is more than Rs. 2 crore each. The tenderer shall submit the completion certificate as per proforma given in annexure-IV-A or IV-B or IV-C as applicable or in the format containing all information as required as per the Annex. IV-A or IV-B or IV-C. Note :- Criteria for the completed work/Substantially completed has been given in the General instructions in the tender document.
Similar nature of work-Any Civil Engineering work involving construction of building and/ or construction bridge/ FOB
67 conditions · 51 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Mandatory in case Bid security amount is prescribed in STD Para 5.1.2 - The Bid Security shall be deposited in cash through epayment gateway or submitted as Bank Guarantee bond from a scheduled commercial bank of India or as mentioned in tender documents. The Bank Guarantee bond shall be as per AnnexureXXXII and shall be valid for a period of 90days beyond the bid validity period.
In case the tenderer is (i)Any firm recognized by Department of Industrial Policy and Promotion (DIPP) as 'Startups' - shall be exempted from payment of Bid security deposit and shall submit certified copy of the registration/ Valid document issued by DIPP (mandatory if applicable)
In case the tenderer is (iii) Labour Cooperative Societies - shall deposit only 50% of the Earnest Money Deposit and shall submit certified copy of the registration/ Valid document issued by the relevant Ministry/ Labour commission (mandatory if applicable).
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
I/We have read the various conditions to tender attached here to and agree to abide by the said conditions. I/We also agree to keep this tender open for acceptance for a period as mentioned in NIT header from the date fixed for opening the same and in default thereof, I/We will be liable for forfeiture of my/our "Bid security". I/We offer to do the work for North Western Railway, at the rates quoted in the attached schedule and hereby bind myself/ourselves to complete the work in all respects within time period as mentioned in the NIT Header from the date of issue of letter of acceptance of the tender
I/We also hereby agree to abide by the General Conditions of Contract-2022 corrected up- to- date and to carry out the work according to the Special Conditions of Contract and Indian Railways Unified Standard Specifications (Materials and Works)- 2021 as corrected up-to-date, Unified Standard Schedule of Rates of North-Western Railway - 2021 as corrected up-to-date & CPWD DSR-2021 and Specification-2019 (for the present contract)
Development of Goods Shed Siding at Khori Yard including Earthwork for New Line, P-Way Works, Construction of New Goods Platform with Covered Shed ,Construction of Building Complex (Labour Resting Room, Merchant's Room, etc. with Attached Toilets), and Development of Circulating Area
NWRSCCIVIL-102140549~NWR
NWRSCCIVIL-102140549
Open
Works - General
9 Months
Jaipur, Rajasthan
₹0
₹13.6 L
29 Jan 2026
7 Jan 2026
15 Jan 2026
267 items across 3 schedules · ₹37,26,19,575.83 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| Earthwork in filling in embankment, guide bunds, around buried type abutments, bridge gaps, trolley refuges, platforms etc. with contractor's own earth conforming to Soil Quality Class SQ1/SQ2/SQ3, after preparation of foundations as applicable, benching in existing banks wherever required, spreading in layers with motor grader, bringing the moisture content to OMC, mechanical compaction to specified density a n d dressing of bank to final profile as per RDSO Specifications: RDSO/2020/GE: IRS-0004 with latest correction slips. Note: 1) Foundation preparation, Benching including additional earthwork on account of this, wherever required, shall be paid extra under relevant schedule item for benching. 2) Payment for Earthwork under this item shall be made based on the cross section measurements calculated (i) with original ground profile of existing bank based on initial ground levels before doing benching and (ii) final profile of the bank worked out with final levels as per prevailing guidelines. | — | — | — | — | |
| 1 | Using Soil Class SQ2 | cum | 31250.00 | 227.72 | 71,16,250 |
| 2 | Mechanical manufacturing of blanketing material by using only hard and durable stone crushed in mechanical crusher to different gradations, wet mixing of the same in designed proportion in Pug mill or wet mix plant to have uniform gradation including all incidental transportation, laying over finished formation in uniform layer(s) with motor grader, compaction with suitable vibratory roller to specified density and finishing to correct profile, complete as per RDSO Specification No. RDSO/2020/GE: IRS-0004 with latest correction slips. Note: This item shall be used only when entire constituent of blanketing material is mechanically manufactured by crushing of hard and durable stone into desired gradation of designed proportion. | cum | 2500.00 | 1,728.03 | 43,20,075 |
| P r o v i d i n g portable fencing along running track where work is to be done in close vicinity of track, maintaining during execution of work and removing after completion of the work as per direction of the Engineer. Fencing shall consist of self supporting steel angles of size 50mm x 50mm x 6mm, 1.5m long provided with hooks etc. and embedded in CC 1:2:4 block of size 0.23m x 0.23m x 0.23m placed at c/c distance of 2m along track. 12mm dia rods in three horizontal layers shall be tack welded with angle posts. Note : Released material will be property of the contractor after completion of work. Cost of cement required for CC blocks shall be paid separately. | — | — | — | — | |
| 3 | With provision of one 50mm wide retro- reflective tape in horizontal direction, duly secured/tight with vertical posts. | Metre | 2000.00 | 264.41 | 5,28,820 |
| 4 | With provision of painting verticals & horizontals with red luminous paints / strips of 30cm each with a gap of 30 cm. | Metre | 500.00 | 136.03 | 68,015 |
| Earthwork in excavation by mechanical means (Hydraulic Excavator)/Manual Means for foundations and floors of the bridges, retaining walls etc. including setting out, dressing of sides, ramming of bottom, getting out the excavated material, back filling in layers with approved material and consolidation of the layers by ramming and watering etc. including all lift, disposal of surplus soil up to a lead of 300m, all types of shoring and strutting with all labour and material complete as per drawing and technical specification as directed by Engineer in charge. Note: This item will be used for excavation work in connection with other miscellaneous works also like side drains, foundation for OHE masts and other miscellaneous structures in connection with Gauge Conversion, Doubling, New lines. | — | — | — | — | |
| 5 | All kinds of soils | cum | 6400.00 | 210.9 | 13,49,760 |
| Providing and laying in position Plain cement concrete of specified Nominal M i x f o r miscellaneous works like side drains, foundation for OHE masts and other miscellaneous structures excluding the cost of Cement, centering and shuttering - All work up to plinth level : | — | — | — | — | |
| 6 | 1:4:8 (1 Cement : 4coarse sand (zone- III): 8 graded stone aggregate 40 mm nominal size). | cum | 450.00 | 2,976.96 | 13,39,632 |
| Providing and laying in position machine batched, machine mixed and machine vibrated Cement Concrete of specified grade as per approved Design Mix (mixed in Mobile Concrete Batching/Mixing Plant at site or RMC from approved plants) using 20mm graded crushed stone aggregate and coarse sand of approved quality for the following Reinforced cement concrete structural elements up to height of 9.0 m from foundation top level, including finishing, using Plasticiser in approved proportions (as per IS:9103), to modify workability without impairing strength and durability complete as per specifications and direction of the Engineer in charge. Note: 1. Payment for cement, reinforcement and shuttering shall be made extra under relevant item. 2. Plasticiser shall invariably be used in approved proportion to increase workability with minimum possible quantity of cement for all grade of Design Mix Concrete unless it is specifically approved citing reasons for not using plasticiser at the stage of Mix Design and in that case deduction shall be made as per relevant item. | — | — | — | — | |
| 7 | Wing wall and Return wall | cum | 1240.00 | 2,999.09 | 37,18,871.6 |
| Dry/Wet Sinking of Circular Wells (Other than pneumatic method) in all types of strata except hard rock requiring blasting including bailing and pumping out water, removal of excavated soil with all labour and material required for sinking as per drawing and direction of the Engineer in charge, disposal of surplus soil in the adjoining bank/embankment. | — | — | — | — | |
| 8 | From initial level of cutting edge & up to 3m depth | cum | 150.00 | 179.45 | 26,917.5 |
| 9 | Above 3m to 10m depth | cum | 344.00 | 289.99 | 99,756.56 |
| 10 | Above 10m to 15m depth | cum | 246.00 | 336.5 | 82,779 |
| Providing and laying in position machine batched, machine mixed and machine vibrated Cement Concrete of specified grade as per approved Design Mix (Cast in-Situ) using 20mm graded crushed stone aggregate and coarse sand of approved quality in the following elements of well including finishing, using Plasticiser in approved proportions (as per IS:9103), to modify workability without impairing strength and durability complete as per drawings and technical specifications as directed by Engineer. Note: 1. Payment for cement, reinforcement and shuttering shall be made extra under relevant item. 2. Plasticiser shall invariably be used in approved proportion to increase workability with minimum possible quantity of cement for all grade of Design Mix Concrete unless it is specifically approved citing reasons at the stage of Mix Design and in that case deduction shall be made as per relevant item. | — | — | — | — | |
| 11 | In Steining of wells | cum | 160.00 | 3,211.55 | 5,13,848 |
| 12 | Providing and casting machine batched, machine mixed and machine vibrated Cement Concrete of specified grade as per approved Design Mix, mixed in Mobile Concrete Batching/Mixing Plant at site or RMC from approved plants, (Cast in-Situ/Pre-cast) in bottom/top slab, side walls, toe wall and sumps haunch filling head walls, thrust bed or any other component using 20mm graded crushed stone aggregate and coarse sand of approved quality of RCC box of any size including finishing, Plasticiser in approved proportions (as per IS:9103), to modify workability without impairing strength and durability, complete as per drawings and technical specifications as directed by Engineer in charge. Note: 1. Payment for cement, reinforcement and shuttering shall be made extra under relevant item. 2. Plasticiser shall invariably be used in approved proportion to increase workability with minimum possible quantity of cement for all grade of Design Mix Concrete unless it is specifically approved citing reasons at the stage of Mix Design and in that case deduction shall be made as per relevant item. | cum | 365.00 | 3,211.55 | 11,72,215.75 |
| 13 | Providing and applying two coats of coal tar or bitumen confirming to IS:3117- latest version on the top and sides of RCC box/slabs @ 1.70 kg/sqm after cleaning the surface with all labour and materials complete job as directed by the Engineer. | Sqm | 1000.00 | 178.84 | 1,78,840 |
| Centering and shuttering including strutting, propping etc. and removal of form for : | — | — | — | — | |
| 14 | All types of bridge sub-structures, e.g. pier, abutment, wing wall, retaining wall, RCC box type foundations, Abutment cap, Pier Cap, Inspection Platform & Pedestal over Pier cap, Fender wall, Diaphragm wall etc. up to 5m above ground level | Sqm | 5100.00 | 715.17 | 36,47,367 |
| Supply and using Cement at Worksite | — | — | — | — | |
| 15 | Ordinary Portland Cement 43 grade approved brands/makes | MT | 88.00 | 7,801.51 | 6,86,532.88 |
| 16 | Ordinary Portland Cement 53 grade of approved brands/makes | MT | 644.00 | 7,968.76 | 51,31,881.44 |
| 17 | Pozzolana Portland Cement approved brands/makes | MT | 88.00 | 7,294.44 | 6,41,910.72 |
| Supply of steel reinforcement of approved brands/makes for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete. | — | — | — | — | |
| 18 | Thermo-Mechanically Treated bars of grade Fe-500D or more of approved brands/makes. | Kg | 104700.00 | 107.01 | 1,12,03,947 |
| 19 | Supplying of stone boulders weighing not less than 35 kg each at specified bridge locations. | cum | 300.00 | 1,202.81 | 3,60,843 |
| 20 | Providing and laying Pitching with Stone Boulders, weighing not less than 35kg each with voids filled with cement sand mortar 1:4 on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical Specifications (filter media to be paid separately under the relevant item). Rate is excluding cost of cement which shall be paid extra under relevant item. | cum | 200.00 | 3,091.44 | 6,18,288 |
| 21 | Providing Boulder Backing behind wing wall, return wall, retaining wall with hand packed boulders & cobbles with smaller size boulders toward the back including all lead, lift, labour & other incidental charges as complete work in all respect. Payment for boulder/cobbles will be done extra. | cum | 300.00 | 411.68 | 1,23,504 |
| Dismantling and removing rail of all section & length from track, laid on any type & density of sleeper by removing fish plates, fastenings & fish bolts and other materials including stacking all released materials within an average distance of 500 metres as directed by Engineer in-charge. Note: 1.Cutting of rails shall be paid separately. 2.Work to be done under traffic block. | — | — | — | — | |
| 22 | For Through Rail Renewal work | TRM | 1500.00 | 48.05 | 72,075 |
| Insertion of rails of all types & length in track, laid on any type & density of sleeper to the specified gauge under traffic block. Rates include fastening of rail with sleepers with standard set of fastenings and fixing of fish plates and bolts or, if required, providing gap for w e l d i n g and stacking of released material without infringement within 250m as directed by Engineer-in- Charge. Note: Rail drilling and cutting to be paid separately. | — | — | — | — | |
| 23 | For Through Rail Renewal work | TRM | 1500.00 | 49.55 | 74,325 |
| Replacement of any type of sleepers in track with PSC sleepers lying on cess or at Bridge Approaches for casual renewal at isolated locations with all fittings complete to specified gauge & cross level with contractor's tools including packing and dressing of ballast, as directed by Engineer in-charge. Released materials shall be neatly stacked and handed over at specified location within an average lead of 250 m or near either side of Bridge approaches as directed. | — | — | — | — | |
| 24 | Locations other than Ballasted Deck Bridge | Each | 1170.00 | 507.15 | 5,93,365.5 |
| 25 | Lubrication of gauge face of rail on curves, cross overs, points & crossings, turn-in curves and at locations as required with contractor's grease graphite grade "O" IS 408 and as directed. | RM | 3000.00 | 4.65 | 13,950 |
| 26 | Loading Railway's ballast, collected at yard / depot into Railway's BOB / BKH / any other type of open wagon, using Mechanical Loader or any other method with all lead and lifts, as directed by Engineer in-charge. | cum | 3700.00 | 41.37 | 1,53,069 |
| Unloading of ballast from Railway's Hopper Wagons, quantity distribution as per pre-defined site requirement, clearing infringements/jammed ballast, distributing the unloaded ballast uniformly over the track, profiling and boxing following all prescribed safety norms. | — | — | — | — | |
| 27 | Under Conditions not requiring Traffic Block: | cum | 3700.00 | 42.64 | 1,57,768 |
| Manufacturing, supply and stacking of machine crushed Track Ballast conforming to RDSO Specification (IRS- GE-1) with latest correction slips at Railway depot or nominated location. Note: Distance of nearest quarry mentioned in each sub-item is only for the purpose of selecting the items for preparation of estimates/tender schedule, based on the minimum distance between nearest quarry and centre of supply points and will not affect the selection of quarry during physical supply in any way till prescribed specification is met fully. | — | — | — | — | |
| 28 | When distance of nearest quarry is more than 10 km and up to 20 km | cum | 3700.00 | 1,004.7 | 37,17,390 |
| 25mm gap 'in-situ' welding during traffic block using Railway's welding portion and finishing of weld to meet the prescribed tolerances and pass all stipulated tests with all required labour, materials, consumables, tools, equipments etc. to complete the work in all respect as per IR's "Manual for Fusion Welding of Rails by Alumino - Thermic Process" with latest correction slips, including marking of welded joint, painting weld collar with anticorrosive paint, restoration of track near weld joint to original position and fixing of joggled fish plate at new weld, to be removed after passing of weld in USFD test as directed by Engineer in charge. Note: 1. Welding portion and related accessories as per Annexure - I shall be supplied by Railways. All other items required shall be supplied by the Contractor. 2. Welding shall be carried out only by trained welder having valid competency certificate. 3. Hydraulic Weld trimmer shall be used for chipping and profile Grinder for finishing. 4. Required nos. of Joggled fish plates shall be supplied by Railway at nearest P. Way Stores and the same shall be returned at nearest P. Way Store or at other location as per direction of Engineer-in-Charge after release from track. | — | — | — | — | |
| 29 | For 60 Kg Rail, Single shot crucible fitted with Automatic Tapping Thimble , 3 pieces Mould (Zircon washed) and Compressed Air Petrol/LPG pre heating technique | Each | 50.00 | 2,079.91 | 1,03,995.5 |
| 30 | Spreading of ballast, from existing stacks available along formation on top or at cess, in required uniform thickness, compaction of ballast layer laid on new formation at all the locations with smooth wheeled power roller of 8-10 tonne capacity to sufficient number of passes to form consolidated ballast bed of approximately 250mm thickness to a width of 4m symmetrical to centre line of proposed track in correct line & level with all ascents & descents, as directed by Engineer in-charge. Note: Item is inclusive of (a) providing ramp for taking roller to formation and removing the same & making good formation after completion of work; (b) redistribution & leveling of excess ballast while rolling to obtain uniform plane cambered surface. | cum | 3700.00 | 44.93 | 1,66,241 |
| 31 | Carrying out cut & connection to the existing PSC sleeper track under line block of any rail section and sleeper density to connect the same to newly linked track which is laid by the side, duly carrying out cutting of rails, insertion of additional PSC sleepers, if required, providing fish plated joints including drilling of holes, slewing required length of both tracks to prescribed alignment, adjusting sleeper spacing, providing continuity to track, spreading of ballast to provide cushion, shoulder ballast to the track stretch, giving one round of initial packing to make track fit for 20 kmph speed and boxing of ballast to profile as directed by Engineer in charge. | Each | 2.00 | 67,711.42 | 1,35,422.84 |
| First or Second Through Packing of track of all sleeper density including giving a general lift, as desired to eliminate sag after Deep Screening work, lifting of track, lowering of track and major realignment of curves and formation rehabilitation as per procedure prescribed in latest edition of IRPWM. Note: General lift is normally 25 mm and isolated lift may be up to 50 mm. | — | — | — | — | |
| 32 | For PSC Sleeper Track with Sleeper Density of 1660 | TRM | 1500.00 | 147.4 | 2,21,100 |
| Third or subsequent Through Packing of track for all sleeper density including picking of slacks, as required after second through packing, subsequent to Deep Screening work as per procedure prescribed in latest edition of IRPWM. This item can also be used after lifting/regrading/realignment works also. Note: General lift is normally 25 mm and isolated lift may be up to 50 mm. | — | — | — | — | |
| 33 | For PSC Sleeper Track with Sleeper Density of 1660 | TRM | 1500.00 | 113.38 | 1,70,070 |
| De-stressing of LWR/CWR track of any density under traffic line block with contractor's labours, tools, equipments and consumables inclusive of all lead & lift. Activities include cutting of LWR/CWR into convenient panels of specified length, removal of ERCs, liners, greasing of ERCs and liner contact area, lifting rails and keeping them on rollers provided at every 15 sleepers, working out elongation of rail ends depending on prevailing site conditions, pulling rails with the help of Hydraulic Tensor to achieve the desired elongation, cutting rails, as required, removing rollers and placing rail in position, re-fixing ERCs & liners and adjustment of gap at SEJs : Note: (1) Welding of rail joints will be paid separately. (2) Rail cutting and Hole drilling shall be paid separately. (3) Opening and closing of LC if required will be paid separately. (4) As per procedure prescribed in latest edition of IRPWM & CE's Circulars for destressing of LWR/CWR, if any. | — | — | — | — | |
| 34 | Without Rail tensor | TRM | 2000.00 | 42.59 | 85,180 |
| Anti-corrosive painting of rail outside track on rail bottom, web, foot and fishing plane with two coats of thickness of 100 microns each by bituminous black paint confirms to IS-9862 of reputed make including surface preparation, as a complete job as per procedure prescribed in latest edition of IRPWM. | — | — | — | — | |
| 35 | For 60 Kg Rails | RM | 1500.00 | 57.49 | 86,235 |
| Quick cutting with abrasive rail cutter of all types of rail sections including wear resistant, head hardened rails up to 110 UTS, with contractors tools & plants, equipment, consumable with all lead & lift etc. complete as directed by Engineer in-charge. Abrasive Rail Cutter will be as per RDSO Specification No. TM/SM/1 (Rev. 01 of 2012) with latest status of RDSO; Rail Cutting Wheel Abrasive Disc will be as per RDSO Specification No.TM/SM/2 (Rev. 01 of 2020) | — | — | — | — | |
| 36 | 60 Kg - 110/90 UTS - Outside Track | Each | 200.00 | 219.76 | 43,952 |
| Drilling holes of 16 mm to 32 mm dia. with Rail Drilling machine including chamfering with appropriate chamfering tools in all types of rail section with contractor's tools & plants, equipment, consumable with all lead & lift etc. complete, as directed by Engineer in- charge. Rail Drilling Machine will be as per RDSO Specification No. TM/SM/3, dated 24.04.1991. | — | — | — | — | |
| 37 | Outside Track | Each | 100.00 | 50.01 | 5,001 |
| Loading of rails of any section and length up to 1 3 metres in Wagons / Truck / trailer including lead up to 50 metres and lift up to 5 metres. | — | — | — | — | |
| 38 | In wagons during period of traffic block where handling by mechanical means is not possible | MT | 400.00 | 305.76 | 1,22,304 |
| Loading of tongue rail, stock rail, switch assembly and crossings of any section and length, SEJ, Glued joint etc. with / without P.Way fittings and fastenings, in Wagon / Truck / trailer including lead up to 250 metre and lift up to 5 metre. | — | — | — | — | |
| 39 | In Wagon where mechanical handling is possible and traffic block is not required or in Truck/trailer. | MT | 45.00 | 123.98 | 5,579.1 |
| Loading, unloading and hauling of 52Kg / 60Kg rail more than 13 metre and up to 39 metre length by Railway's Rail Dolly / Dip Lorry to the nominated location under traffic and line protection in case road carriage is not possible for different leads and lift up to 5 metre. | — | — | — | — | |
| 40 | For lead beyond 500 metre and up to 1 Km | MT | 50.00 | 675.16 | 33,758 |
| 41 | Extra to Items no. 171042 for lead beyond 1 Km for every subsequent Km or part thereof and up to 10 Km | MT | 450.00 | 84.44 | 37,998 |
| Unloading of rails of any section and length up to 13 metre, in neat manner for Railway usage from departmental material train (DMT) or contractor's / Railway's Truck/trailer including lead up to 50 metre, lift up to 5 metre and stacking in prescribed manner. | — | — | — | — | |
| 42 | From Wagon where mechanical handling is possible and traffic block is not required or in Truck / trailer. | MT | 350.00 | 92.69 | 32,441.5 |
| Unloading of rails of any section and length from 13 metre to 39 metre, in neat manner for Railway usage from departmental material train (DMT) including lead up to 50 metre and lift up to 5 metre. | — | — | — | — | |
| 43 | Not involving traffic block or in lines not opened to traffic | MT | 50.00 | 131.56 | 6,578 |
| Loading of 52kg / 60kg PSC normal line and special sleepers up to 2.75 metre length in Depot / Station / Mid-section between stations in a neat manner to departmental material train (DMT) or contractor's / Railway's Truck/Trailer with crane or any other means including crossing of one track with free lead up t o 250 metre and lift up to 5 metre, if required with contractor's labour, tools & plants, machinery, consumables etc. Note: In case of any damage to sleeper during loading, penalty @ 50% of the all inclusive cost of sleeper shall be levied. | — | — | — | — | |
| 44 | In Wagon where mechanical handling is possible and traffic block is not required or in Truck / trailer | MT | 800.00 | 95.87 | 76,696 |
| Loading of 52kg / 60kg PSC line and special sleepers beyond 2.75 metre length including existing fittings and fastenings in Depot / Station / Mid- section between stations in a neat manner to departmental material train (DMT) or contractor's / Railway's Truck/trailer with crane or any other means including crossing of one track with free lead up to 250 metre and lift up to 5 metre, if required with contractor's labour, tools & plants, machinery, consumables etc. Note: In case of any damage to sleeper during loading, penalty @ 50% of the all inclusive cost of sleeper shall be levied. | — | — | — | — | |
| 45 | I n Wagon/Truck / trailer where mechanical handling is possible and traffic block is not required. | MT | 215.00 | 123.54 | 26,561.1 |
| Loading, leading and unloading of PSC Sleepers of 52Kg / 60Kg by Railway's Rail Dolly/ Dip Lorry to the nominated location under traffic in case road carriage is not possible for different leads and lift up to 5 metres. | — | — | — | — | |
| 46 | For lead beyond 500 metre and up to 1 Km | MT | 100.00 | 474.19 | 47,419 |
| 47 | Extra to Items no. 172032 for lead beyond 1 Km for every subsequent Km or part thereof and up to 10 Km | MT | 900.00 | 49.44 | 44,496 |
| Loading, leading and unloading of all types of P.Way fittings and all other miscellaneous material except Rails, sleepers, switches, crossings, SEJs and Glued Joints by road vehicles for different leads. Note: Lead shall be the shortest motorable road length between the points of loading and unloading. | — | — | — | — | |
| 48 | Lead beyond 5 Km and up to 10 km | MT | 7.00 | 226.82 | 1,587.74 |
| 49 | Lead beyond 100 Km and up to 150 Km | MT | 15.00 | 990.6 | 14,859 |
| 50 | Extra for every Km per MT beyond 150 Km over item no. 172047 | MT-Km | 3000.00 | 3.29 | 9,870 |
| Transportation of Rails, sleepers, switches, crossings, SEJs and Glued Joints by road vehicles for different leads. Note: 1 . Lead shall be the shortest motorable road length between the points of loading and unloading. 2. Loading and unloading shall be paid extra under relevant items. | — | — | — | — | |
| 51 | Lead beyond 5 Km and up to 10 km | MT | 400.00 | 103.5 | 41,400 |
| 52 | Lead beyond 50 Km and up to 100 Km | MT | 50.00 | 546.3 | 27,315 |
| 53 | Lead beyond 100 Km and up to 150 Km | MT | 670.00 | 867.28 | 5,81,077.6 |
| 54 | Extra for every Km per MT beyond 150 Km over item no. 172057 | MT-Km | 134000.00 | 3.29 | 4,40,860 |
| Unloading of 52kg / 60kg PSC line and special sleepers up to 2.75 metre length in Depot / Station / Mid-section between stations in neat manner for Railway usage from departmental material train (DMT) or contractor's / Railway's Truck/Trailer with crane or any other means including crossing of one track and lead up to 250 metre & lift up to 5 metre with contractor's labour, tools & plants, machinery, consumables etc. Note: In case of any damage to sleeper during loading, penalty @ 50% of the all inclusive cost of sleeper shall be levied. | — | — | — | — | |
| 55 | From Truck / Trailer | MT | 800.00 | 91.41 | 73,128 |
| Unloading of 52kg / 60kg PSC special sleepers beyond 2.75 metre length in Depot / Station / Mid-section between stations in neat manner for Railway usage from departmental material train (DMT) or contractor's / Railway's Truck/Trailer with crane or any other means including crossing of one track and lead up to 50 metre & lift up to 5 metre with contractor's labour, tools & plants, machinery, consumables etc. Note: In case of any damage to sleeper during loading, penalty @ 50% of the all inclusive cost of sleeper shall be levied. | — | — | — | — | |
| 56 | From Truck / Trailer | MT | 215.00 | 94.08 | 20,227.2 |
| Unloading of Switches / Crossings / SEJ Rails / Glued Joints of any rail section and length with or without P.Way fittings & fastenings in neat manner for Railway usage from departmental material train (DMT) or contractor's / Railway's Truck/Trailer with lead up to 250 metre & lift up to 5 metres. | — | — | — | — | |
| 57 | From Truck / Trailer | MT | 45.00 | 124.13 | 5,585.85 |
| Hiring of machinery for minor miscellaneous works for short duration i n c l u d i n g operator/driver, fuel, lubricants and consumable. The contractor shall arrange all statutory permits as required by rules and regulations prevailing in the area of work. Payment shall be made for actual working hours at site. | — | — | — | — | |
| 58 | JCB Backhoe Loaders 3DX Plus or similar with minimum 1.10 cum bucket capacity | Hour | 150.00 | 864.02 | 1,29,603 |
| 59 | Hydra or similar tyre mounted Pick-n- Carry crane of 12T capacity for misc. works of handling of material | Hour | 100.00 | 964.49 | 96,449 |
| Schedule total | ₹5,06,04,987.38 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .