Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹27.0 LAdmitted-Finance | -17.73% | ₹27.0 L | L1 | Admitted-Finance |
| 2 | L2₹27.4 L+₹40,013.86 (1.48%)Admitted-Finance | -16.51% | ₹27.4 L+₹40,013.86 (1.48%) | L2 | Admitted-Finance |
| 3 | L3₹30.3 L+₹3.4 L (12.4%)Admitted-Finance | -7.51% | ₹30.3 L+₹3.4 L (12.4%) | L3 | Admitted-Finance |
| 4 | L4₹31.5 L+₹4.5 L (16.8%)Admitted-Finance | -3.91% | ₹31.5 L+₹4.5 L (16.8%) | L4 | Admitted-Finance |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical No EMD or Fee received |
Tender Value
₹32.8 L
EMD Value
₹65,600
Closing Date
4 Aug 2026, 6:00 pmClosed
EO NP MANDAWA
NP MANDAWA
Construction of Gravel Road at different places from Ward 01 to 25, Mandawa
2026_DLB_577398_11
NPMANDAWA/1304/24-07-2026
Open Tender
Civil Works
Percentage
60 days
WORK
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
EO NP MANDAWA/MD RISL
₹65,600
Yes
15 Aug 2026
25 Jul 2026
5 Aug 2026
25 Jul 2026
4 Aug 2026
25 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dressing of earth work in surface excavation including cutting and filling upto 30cm depth including disposal of excavated earth upto 50m and lift upto 1.5 m. | 6,750 | Sqm | 41 | ₹2,76,750 |
| 2 | Construction of embankment with approved material obtained from borrow pit with all lifts and leads, transporting to site, spreading, grading to required slope and compacting by vibratory roller 8-10 tonne to meet requirement of table 300-2 including cost of compensation for earth taken from private land complete as per MoRT&H specification clause 305. (Lead taken upto 5 km) | 900 | Cum | 178.5 | ₹1,60,650 |
| 3 | Providing, laying, spreading and compacting of granular sub-base by providing close graded material (Table 400-1), spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per MoRT&H specification clause - 401 including all material, labour, machinery, lighting, guarding and maintenance of diversion.Grading - III Material | 1,350 | Cum | 1,157 | ₹15,61,950 |
| 4 | Providing laying, spreading and compacting stone aggregates of specific sizes as per Table 400-7 to Water Bound Macadam specification including spreading in uniform thickness; hand packing,rolling with power roller 8-10 tonnes, in stages to proper grade and camber, applying and brooming requisite type of screening (Table 400-8) binding materials to fill up the interstices of coarse aggregates, watering (with water browser) and compacting to required density, making necessary earthen bund to protect edges as per clause 404 of MoRT&H specification including all material, labour, machinery, lighting, guarding and maintenance of diversion complete.Crusher broken - Grade-III (53-22.4mm) | 675 | Cum | 1,897 | ₹12,80,475 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.32 MB
BOQ_1026269.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .