| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.2 LAccepted-Finance | L1 | Accepted-Finance Admitted | |
| 2 | L2₹8.3 L+₹8,505.20 (1.04%)Accepted-Finance | L2 | Accepted-Finance Admitted |
Tender Value
₹8.5 L
EMD Value
₹9,000
Closing Date
22 Jul 2020, 3:00 pmClosed
Project Director
DRDA Krishnagiri
Krishnagiri DT -SFC MI Tanks and Ponds 2019-20- Hosur Block Block -1 Works- Package No TN-04-KRI-103
2020_RDTN_171051_1
Roc_No_5732_2020_R4_15_06_20
Open Tender
Civil Works - Water Works
Item Rate
180 days
Krishnagiri
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹9,000
DRDA Krishnagiri
27 Jul 2020
11 Jul 2020
22 Jul 2020
11 Jul 2020
22 Jul 2020
11 Jul 2020
13 Jul 2020
Amount
1)Rejuvenation of Minor Irrigation Tank of Thimma Reddy Eri H/o Poonapalli -Rs. 8.51 lakhs
Clearing the light jungle and removed away from the site including all cutting charges and all labour charges as per standard specification
Earth work in all Soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100m deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete.
Formation of foreshore bund by dumping the excess earth excavated soil after bund strengthening in all soils except hard rock requiring blasting and conveying with initial lead of 0 to 100m deploying earth moving machineries and tippers for formation of bund in layers of suitable thickness, depending upon type of compaction equipment deployed and not exceeding 23cm thickness, benching of slopes prior to placement of earth fill, breaking clods, formation of bund, breaking clods and sectioning complete as per technical specification etc.,
Earth work in all Soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100m deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete.
Providing apron for existing Weir
Cement concrete 1:4:8 mix using 40mm I SS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the Departmental section stores
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Construction of Protection wall
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Cement concrete 1:4:8 mix using 40mm I SS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the Departmental section stores
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Collection and supply of Well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and levelling to required profile
Providing and fixing of boundary stone
Provision for Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
SA Constructions
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .