Loading…
Loading…
Tender Value
₹1.7 Cr
EMD Value
₹3.4 L
Closing Date
15 Sept 2026, 4:00 pm
Executive Engineer
RnB Division Qazigund
Upgradation of Manzmoh Bokadpathi road.
2026_PWDJK_322230_3
23//RnB/QZD/26-27/2849-2864 Dtd 28-08-2026
Open Tender
Civil Works
Percentage
730 days
Qazigund
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,600
O470010200000099
₹3.4 L
25 Aug 2026
25 Aug 2026
16 Sept 2026
26 Aug 2026
15 Sept 2026
26 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Preparation of sub Grade, Earthwork, Engagement of JCB & Cutting of Trees | |||||
| 2 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : | 1,170 | CUM | 164.21 | ₹1,92,125.7 |
| 3 | Banking excavated earth in layers not exceeding 20cm in depth, breaking clods, watering, rolling each layer with 1/2 tonne roller, or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up, in embankments for roads, flood banks, marginal banks, and guide banks etc., lead upto 50 m and lift upto 1.5 m in All kinds of soil: | 1,275 | CUM | 591.45 | ₹7,54,098.75 |
| 4Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunk and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. | |||||
| 4.01 | Beyond 30 cm girth upto and including 60 cm girth. | 40 | NO | 332.33 | ₹13,293.2 |
| 4.02 | Beyond 60 cm girth upto and including 120 cm girth. | 30 | NO | 1,475.55 | ₹44,266.5 |
| 5 | Engagement of JCB for Dismentalling old work, removal of tree trunks, cutting down of bushes trees and removal of boulder bunds etc including disposal of material | 20 | HOUR | 1,016.95 | ₹20,339 |
| 6 | Preparation of subgrade by excavating earth to an average of 22.5 cm depth, dressing to camber and consolidation with road roller of 8-12 tonne capacity including making good the undulation etc. and disposal of surplus earth upto 50 meters. | 4,000 | SQM | 134.14 | ₹5,36,560 |
| 7 | Shifting of utilities like electric poles, PHE pipes, Cables etc as directed by EIC | 1 | JOB | 42,372.88 | ₹42,372.88 |
| 8RBM/Nallah MUCK | |||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.36 MB
BOQ_1078842.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].