Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 11 SANJIV BAUG SOCIETY NEW SHARDA MANDIR ROAD PALDI AHMEDABAD GUJARAT 380007 | AHMADABAD | GUJARAT | 380007 | Admitted-Finance |
| 2 | Admitted-Finance 302 APOLLO ARCADE APOLLO ARCADE 7819 AHMEDABAD GUJARAT 380061 | AHMADABAD | GUJARAT | 380061 | Admitted-Finance |
Tender Value
₹22.5 L
EMD Value
₹45,080
Closing Date
3 Aug 2023, 6:00 pmClosed
Executive Engineer M and H, Dn. I Jaipur
Executive Engineer M and H, Dn. I Jaipur
SITC of Passenger cum bed Elevator for Trauma Center at Jaipuria Hospital, Jaipur
2023_MEDIC_354269_1
NIT 30/2023-24 EEM and H Dn. I Jaipur/
Open Tender
Electrical Works
Percentage
180 days
Jaipur
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
RTGS/NEFT/Any other money Transfer System
₹45,080
10 Aug 2023
28 Jul 2023
4 Aug 2023
28 Jul 2023
3 Aug 2023
28 Jul 2023
Amount
Supllying installation testing and commissioning of the passenger/goods/stretcher or bed elevator having following main features:
(a) MOTOR: Gearless life driver comprising of high starting torque lift duty 3 Phase 440 volt A.C. permanent magnetic synchronous mnotor of proper rating with high efficiency shall be used.
© Traction Media: main hoist flat coated steel belt/rope thimbles of spring permit adjustment of uniform tension for smooth operation of the elevator pulse belt monitoring system to avoid the cut in the belt.
(d)Car: car should be with MS platform with bracings of adquate size and to sustain the impact load cabin plus passengers with safety factor of fire for steel with anti skid PVAC flooring and side panels should be of stainless steel with hair line finish of sheet of grade 304 duty with S.S.handrails car ceiling shall be steel finish with aesthetic appearances with LED ceiling lights the size of the car shall be taken as per available lift well size and relevant BIS code of lifts . Car panel will also be of S.S> 304 grade finished with emergency stop device full length infra-red curtain in car door facility of auto/attended mode . All casr panel buttons and all floor switches must be with brail language as per lift act. Agency shall also provide & install one No. 2 MP IR, IP, based ceiling mounted Dome Camerain the car complete with connecting cables & accessories (To be connected with existing CCTV system in the building) . The inspection unit shall be provided at the top of the car.
(e) Landing Doors: All landing door shall be fully automatic centre opening/telescopic made of hair line finish stainless steel grade 304 with key holes and infrared curtains with unlocking facility from outside.
(F) Emergency light: Appropriate rechargeable battery operated LED emergency light in the car and along with alarm switch shall be provided.
(g) ARD: Automatic rescue device (ARD) shall be provided according to passenger capacity with SMF batteries of approved brands as per BSR.
(h) Audio-Visual indication : Audio Visual indication in the lift car showing over loading such that doors kept open till excess load is removed.
(i) Scrolling Indicators: Digital scrolling indicator system for up-down arrow with floor position indicator shall be provided inside the car and at all stops/floors.
(j) Buffers: spring buffers/PU buffers shall be provided.
(k) Car Fan: ENERGY EFFICIENT Car fan/blower with automatic sleep timer shall be provided.
(l) Voice Annunciator: Voice annunciator with suitable music shall be provided in lift car.
(m) Self diagnostics system for operational and safety parameters shall be provided in control panel
(n) Mechanical/Electronic over speed governor door key holes in the floor doors fireman switch shall be provided.
(o) Lift machine hoisting arrangement in the lift machine room counter balance to promote smooth and economic operation complete with steel guide rails for the car & counter weight Trap Door lifting hooks as reauired and monkey ladders for lift pit should be provided by the agency along with all other steel structure works foundations for the machine etc as required.
(q) All civil works related to installation of lift like finishing cleaning and levelling of lift pit white wash of lift well and in machine room shall be done by the lift erecting agency without any extra cost.
(R) Agency has to provide all working drawings and documents to comply latest BIS specifications and make proper liasion services for obtaining all necessary permissions.
20 passengers/1360kg 2 stops rated speed adjustable up to 0.5 mtr/sec with 5 years comprehensive maintenance / DLP
Omega Elevators
Omega Elevators
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .