Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | l1₹2.1 CrAccepted-AOC SP 52 MPPGCL COLONY BIRSINGHPUR DISTT UMARIA 484 552 M P | BIRSINGHPUR | UMARIA | MADHYA PRADESH | 484552 | ₹2.1 Cr | l1 | Accepted-AOC l1 |
| 2 | l2₹2.5 CrRejected-AOC PLOT NO 41 SECTOR D BAGRODA INDUSTRIAL AREA BHOPAL MP 462026 | BHOPAL | MADHYA PRADESH | 462026 | ₹2.5 Cr | l2 | Rejected-AOC l2 |
| 3 | Rejected-Technical KORBA CHHATTISGARH 495450 INDIA UDYAM CG 10 0000171 | KORBA | CHHATTISGARH | 495450 | - | - | Rejected-Technical Disqualfied |
| Sl No | Description | Qty | Unit | K K POWER CONSTRUCTION L1 | UNITED ENGINEERING L2 |
|---|---|---|---|---|---|
| 1.00section-A | |||||
| 1.10OVERHAULING MAINTENANCE OF ID FANS | |||||
| 1.11 | INSPECTION & SERVICING OF FAN BEARING | 8 | Nos. | 57,840 ₹68,251.20 | 65,200 ₹76,936 |
| 1.12 | INTERNAL,INSPECTION AND CLEANING OF FANS | 4 | Nos. | 21,000 ₹24,780 | 23,920 ₹28,225.60 |
| 1.13 | SERVICING OF OIL SYSTEM OF HYDRAULIC COUPLING/FLEXIBLE COUPLING INCLUDING COOLING WATER LINE VALVES AND COOLERS. | 4 | Nos. | 21,000 ₹24,780 | 24,600 ₹29,028 |
| 1.14 | HARD FACING OF IMPELLER | 4 | Nos. | 27,720 ₹32,709.60 | 33,000 ₹38,940 |
| 1.15 | REPLACEMENT OF SHAFT, IMPELLER & SET OF FAN BEARING. | 2 | Nos. | 60,000 ₹70,800 | 75,000 ₹88,500 |
| 1.16 | REPAIRING OF ID FAN CASING & ASSOCIATED CHAMBER DUCT | 4 | Nos. | 84,000 ₹99,120 | 93,920 ₹1.1 L |
| 1.17 | ALIGNMENT OF FAN WITH MOTOR | 4 | Nos. | 21,000 ₹24,780 | 24,840 ₹29,311.20 |
| 1.20MAINTENANCE OF SEAL AIR FANS | |||||
Tender Value
₹2.1 Cr
EMD Value
₹2.1 L
Closing Date
3 Jun 2022, 3:00 pmClosed
SE(PNW) SGTPS
SE(PNW) SGTPS
Work Contract for Annual Overhauling of Non-Pressure Parts of Boiler Unit No. 1 and 2 of PH -I at SGTPS,MPPGCL, Birsinghpur for FY 2022-23
2022_MPPGC_194672_1
194672
Open Tender
Electrical and Maintenance Works
75 days
SGTPS MPPGCL BIRSINGHPUR UMARIA
As per NIT PQR CLAUSE 5
15 documents required · 15 mandatory
₹5,000
Yes
₹2.1 L
Yes
13 Feb 2026
25 Apr 2022
7 Jun 2022
25 Apr 2022
3 Jun 2022
25 Apr 2022
section-A
OVERHAULING MAINTENANCE OF ID FANS
INSPECTION & SERVICING OF FAN BEARING
INTERNAL,INSPECTION AND CLEANING OF FANS
SERVICING OF OIL SYSTEM OF HYDRAULIC COUPLING/FLEXIBLE COUPLING INCLUDING COOLING WATER LINE VALVES AND COOLERS.
HARD FACING OF IMPELLER
REPLACEMENT OF SHAFT, IMPELLER & SET OF FAN BEARING.
REPAIRING OF ID FAN CASING & ASSOCIATED CHAMBER DUCT
ALIGNMENT OF FAN WITH MOTOR
MAINTENANCE OF SEAL AIR FANS
SERVICING/ REPLACEMENT OF FAN BEARING & COUPLING
OVERHAULING MAINTENANCE OF F.D. FANS
CHECKING & SERVICING / REPLACEMENT OF FAN BRGS.
COMPLETE ALIGNMENT OF MOTOR AND FAN ALONGWITH COUPLING.
OVERHAULING MAINTENANCE OF PA FANS
CHECKING & SERVICING / REPLACEMENT OF FAN BRGS.
COMPLETE ALIGNMENT OF MOTOR & FAN ALONGWITH COUPLING.
REPAIRING OF PA FAN CASING
REPLACEMENT OF IMPELLER SHAFT ASSEMBLY OF PA FAN
OVERHAULING OF TUBULAR AIR HEATER
CLEANING OF AIR HEATER INCLUDING TRANSPORTATION OF ASH
HYDROJET CLEANING OF AIR HEATER TUBES
REPLACEMENT OF AIR HEATER TUBES
APPLICATION OF REFRACTORY
EXPANSION OF ENDS OF :
NEW TUBE (FITTED IN INSTANT OVERHAUL)
OLD FITTED TUBES
FERRULING/SLEEVING IN AIR HEATER TUBES ( OLD/NEW)
REPAIRING OF HOPPERS, SUPPORT & STRUCTURE:
WITH STEEL
WITHOUT STEEL
REPAIRING INTERNAL OF AIR PRE-HEATER:
WITH STEEL
WITHOUT STEEL
REPAIRING OF DIVERSION PLATE OF AIR PRE HEATER:
WITH STEEL
WITHOUT STEEL
REPAIRING OF EXPANSION JOINTS OF ALL SIX PARTS OF APH:
WITH STEEL
WITHOUT STEEL
REPAIRING OF DUCT FROM OUTLET OF PA FAN TO INLET OF COAL MILL:
WITH STEEL
WITHOUT STEEL
INSTALLATION OF SCAFFOLDING IN HOPPER OF APH CLOD/INTERMEDIATE ZONE
MAINTENANCE WORKS OF LOP SYSTEM OF ID, FD & PA FANS
DECOUPLING, ALIGNMENT & COUPLING OF LUBE OIL PUMPS
CLEANING OF LUBE OIL TANK & REPLACEMENT OF LUBE OIL OF FANS & AIR PREHEATERS
CLEANING / SERVICING OF LUBE OIL COOLERS & COOLING WATER LINE VALVES
REPAIR/ MAINTENANCE OF DUCTINGS
CLEANING OF ASH FROM INSIDE THE DUCT (COMPLETE)
REPLACEMENT OF DIVERSION PLATES /FLUE GAS SPLITTER INSIDE THE DUCT & I/L OF ESP
REPAIR OF DUCTS BY PATCHING
WELDING OF STEEL STEEL PLATE
Section D
MAINTENANCE OF DAMPERS & GATES
CLEANING, INSPECTION & SEAL REPLACEMENT OF FLUE GAS/AIR PATH DAMPERS/GUILLOTINE GATES
INSTALLATION/ REPLACEMENT/REPAIR OF METALLIC EXPANSION JOINT (MEJ)
FABRICATION OF METALLIC EXPANSION JOINT.
ERECTION OF METALLIC EXPANSION JOINT.
REPLACEMENT OF NON METALLIC EXPANSION JOINTS OF DUCT AND APH
Section E
OVERHAULING MAINTENANCE OF COAL CIRCUIT
SERVICING & REPAIRING OF DRAGLINK RAW COAL FEED SYSTEM WITH ASSOCIATED SYSTEM (CLEANING, INSPECTION, REPAIRING, REPLACEMENT, PAINTING & TRIAL OF RCF)
REPAIRING/REPLACEMENT OF CENTRE FEED PIPE
REPLACEMENT / REPAIRING & SERVICING OF PIV GEAR BOX
REPLACEMENT / REPAIRING OF RCF CHUTE (BELOW RCF)
REPAIRING OF RCF BODY
WITH STEEL
WITHOUT STEEL
REPLACEMENT OF GEARED COUPLING/RESOFLEX COUPLING OF RCF
REPLACEMENT OF OIL SEAL OF OUTPUT SHAFT OF REDICON/FLANDER MAKE GEAR BOX OF RCF
SERVICING/ REPLACEMENT / REPAIRING OF RADCON/FLANDER MAKE GB OF RCF
A) REPLACEMENT OF 603 MM BORE BEND
B) REPLACEMENT OF 433 / 437 MM BORE BEND
A) REPLACEMENT OF 603 MM ID MS STRAIGHT PIPE
B) REPLACEMENT OF 603 MM ID CERAMIC LINED COAL PIPE
C) REPLACEMENT OF 433 MM / 437 MM MS STRAIGHT PIPE
D) REPLACEMENT OF 433 MM ID CERAMIC LINED COAL PIPE
REPAIRING OF NRV'S / SPLITTER / VENTURY / BEND
REPLACEMENT/SERVECING OF JOHNSON COUPLING/ GASKET OF COAL MILL OF 603/433/437MM
ROTATION OF STRAIGHT PIPE BY 180 DEGREE (603, 433, 437 MM)
REPAIRING & SERVICING OF COAL PIPES HANGERS & SUPPORTS
COAL PIPE & COMPONENTS PATCHING (IN R/MTRS)
REPLACEMENT OF VENTURI/ORIFIC PLATE
CUTTING & GRINDING OF FLANGES FROM OLD COAL PIPES/BENDS
REPLACEMENT OF SPLITTER
REPAIRING OF ISOLATING VALVE
REPLACEMENT OF ISOLATING VALVE
REPLACEMENT OF COAL CHUTE ABOVE CENTER FEED PIPE OF COAL MILL
P.F.DISCHARGE PIPE
CLEANING OF CHOCKED PF DISCHARGE PIPE OF COAL MILL
REPAIRING/REPLACEMENT OF COAL BURNER
SERVICING OF PF BURNERS
SERVICING OF PF NOZZLES
REPLACEMENT OF PF NOZZLES
SERVICING & REFITTING OF OIL GUNS
AIR RESISTER
SERVICING OF AIR RESISTERS IN POSITION (MAJOR)
SERVICING OF AIR RESISTERS IN POSITION (MINOR)
REPLACEMENT OF AIR RESISTER
MILLS
SERVICING & REPAIRING OF COAL MILL (CLEANING, INSPECTION, REPAIRING, REPLACEMENT, TRIAL OF MILL)
SERVICING & REPAIRING OF NITROGEN / OIL SYSTEM (INCLUDING REPAIRING OF DAMAGED LOADING CYLINDER)
SERVICING OF MILL GEAR BOX (IN- SITO CONDITION)
OVERHAULING OF ESP
CLEANING, INSPECTION & ALIGNMENT RECTIFICATION OF ESP PASSES
INTERNAL CLEANING OF ESP FIELDS & HOPPERS
CLEANING & INSPECTION OF SUPPORT INSULATOR & ITS HEATING ELEMENTS
ALIGNMENT OF EMITTING FRAME
REPLACEMENT OF DAMAGED COMPONENTS OF ESP
INSPECTION & RECTIFICATION OF PLAIN BEARING OR, BUSH BEARINGS & BUSH BEARING HOUSINGS
REPLACEMENT / REPAIRING OF RAPPING HAMMERS OF CERM / EERM /GDRM
REPAIR / REPLACEMENT OF SHOCK BAR
REPAIR / REPLACEMENT OF PIN INSULATORS
REPAIR / REPLACEMENT OF SUPPORT INSULATORS
REPAIR / REPLACEMENT OF EMITTING FRAME
REPAIR / REPLACEMENT OF G.D. SCREEN
REPAIRING & ALIGNMENT OF COLLECTING ELECTRODE
REPLACEMENT & ALIGNMENT OF COLLECTING ELECTRODE
REPLACEMENT & ALIGNMENT OF EMITTING ELECTRODES
REPAIR & RECLAMATION OF ESP COMPONENTS
REPAIR OF ESP MANHOLE DOOR
REPAIR OF ESP HOPPERS
REPAIR OF ESP CASING :-
(I) WITH STEEL
(II) WITHOUT STEEL
SERVICING & REPLACEMENT OF RAPPING GEAR BOXES
REPAIRING STRENGTHNING & STRAIGHTNING WORK OF DERM ROOF BEAM
SERVICING OF FUEL OIL PRESSURISING SYSTEM
SERVICING OF HFO PUMP
SERVICING OF LDO PUMP.
SERVICING OF HFO HEATER.
SERVICING / REPLACEMENT OF VALVES
UPTO 50 MM
ABOVE 50 MM
SAFETY VALVES
COMPLETE SERVICING OF HFO STRAINER/FILTER.
SERVICING OF HFO / LDO COMPLETE UNLOADING SYSTEM PUMPS FROM TANKER/ HEATER
UNITED ENGINEERING
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid