Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹35.6 CrAccepted-AOC CMS LAKE CENTRE BHANDUP WEST MUMBAI MAHARASHTRA 400078 | MUMBAI SUBURBAN | MAHARASHTRA | 400078 | ₹35.6 Cr | L1 | Accepted-AOC LOWEST BID |
| 2 | L2₹37.3 CrRejected-Finance | ₹37.3 Cr | L2 | Rejected-Finance HIGHEST BID |
| 3 | L3₹44.0 CrRejected-Finance B 1201 1202 1301 MONDEAL HEIGHTS S G HIGHWAY S G HIGHWAY AHMEDABAD GUJARAT 380015 UDYAM GJ 01 0008746 24AABCI8023R1Z9 R M | AHMADABAD | GUJARAT | 380015 | ₹44.0 Cr | L3 | Rejected-Finance HIGHEST BID |
| 4 | Rejected-Technical NO 72 T H ROAD CHENNAI CHENNAI TAMIL NADU 600081 | CHENNAI | TAMIL NADU | 600081 | - | - | Rejected-Technical NOT ELIGIBLE |
Tender Value
₹45 Cr
EMD Value
₹22.5 L
Closing Date
22 Aug 2022, 5:30 pmClosed
D.R. LODHI SUPERINTENDENT ENGINEER
INDORE SMART CITY DEVELOPMENT LTD., NEHRU PARK, INDORE
Selection of Master System Integrator (MSI) for Implementation of Intelligent Integrated Traffic Management System (ITMS) for ISCDL, Indore
2022_UAD_208545_1
10/ISCDL/2022-23
Open Tender
Miscellaneous Works
2095 days
INDORE
AS PER TENDER DOCUMENT
4 documents required · 4 mandatory
₹50,000
₹22.5 L
INDORE
23 Jun 2023
31 May 2022
23 Aug 2022
31 May 2022
22 Aug 2022
22 Jun 2022
20 Jun 2022
ATCS (Adaptive Traffic Control System) for 50 Junction
ATCS (Adaptive Traffic Control System) for a 3 arm - Junction with complete hardware and software including but not limited to Camera based detector, traffic controller, Composite Pedestrian Walk Man and stop man, Disabled Friendly Audio Tactile Device, Network Switch, mounting infrastructure, UPS, Outdoor Cabinet with suitable mounting, earthing, surge protection arrangement, accessories, underground cabling, ducting, etc. as required. Integration with existing BRTS traffic signals, ATCS functionalities and required hardware and software, communication to meet the functional requirement. (for 3 BRTS 3 arm junction )
ATCS (Adaptive Traffic Control System) for a 4 arm - Junction with complete hardware and software including but not limited to Camera based detector, traffic controller, Composite Pedestrian Walk Man and stop man, Disabled Friendly Audio Tactile Device, Network Switch, mounting infrastructure, UPS, Outdoor Cabinet with suitable mounting, earthing, surge protection arrangement, accessories, underground cabling, ducting etc. as required. Integration with existing BRTS traffic signals, ATCS functionalities and required hardware and software, communication to meet the functional requirement.(For 8 BRTS 4 arm junction)
ATCS (Adaptive Traffic Control System) for a 5 arm - Junction with complete hardware and software including but not limited to Camera based detector traffic controller, composite Pedestrian Walk Man and stop man, Disabled Friendly Audio Tactile Device, Traffic Signals, Network Switch, mounting infrastructure, UPS, Outdoor Cabinet with suitable mounting, earthing, surge protection arrangement, accessories, underground cabling, ducting etc. as required. Integration with existing BRTS traffic signals, ATCS functionalities and required hardware and software, communication to meet the functional requirement.(For 3 BRTS 5 arm junction)
TRAFFIC ENFORCEMENT COMPONENTS
Traffic Enforcement System for 3 arm junctions: Red Light Violation Detection (RLVD), ANPR cameras, IR, Local Processing Unit, cabling, accessories & Mounting Infrastructure with Pole, Switches, Junction boxes, UPS, software licenses, underground cabling, ducting, earthing, surge protection etc. as required
Traffic Enforcement System for 4 arm junctions: Red Light Violation Detection (RLVD), ANPR cameras, IR, Local Processing Unit, cabling, accessories & Mounting Infrastructure with Pole, Switches, Junction boxes, UPS, software licenses, underground cabling, ducting, earthing, surge protection etc. as required
Traffic Enforcement System for 5 arm junctions: Red Light Violation Detection (RLVD), ANPR cameras, IR, Local Processing Unit, cabling, accessories & Mounting Infrastructure with Pole, Switches, Junction boxes, UPS, software licenses, underground cabling, ducting, earthing, surge protection etc. as required
SVD: Speed Detection System for covering 2 lanes in one direction with complete subcomponents including ANPR and evidence capturing capability, IR illuminator, non-intrusive speed. Sensor, with underground cabling, ducting, earthing, surge protection & mounting etc. as required
Traffic violation detector sensor for covering 2 lanes with ANPR capability with complete subcomponent including sensor, IR illuminator, underground cabling, ducting, earthing, surge protection and mounting infrastructure and required software with the capability of Speed violation, wrong side movement etc.
PA system including hardware, software mounting infrastructure, accessories etc. at junctions
RLVD (including Speed, No Helmet, Triple Ridding, Wrong direction, traffic count and classification etc.) Application Software at ICCC
ANPR Software Application at ICCC
SVD Software Application at ICCC
PA System Software Application at ICCC
Integration of existing ITMS control room system, Completed integration with E-Challan software(Central/State/Local), Application at ICCC, including integration with State RTO/ Vahan & Sarathi, Payment Portal, City Mobile App( Emergency vehicels priority, Indore 311, Citizen Cop etc.) / Payment portal and Gateway, PUC integration, SMS portal etc.
Surveillance
Surveillance - Bullet Cameras
Surveillance - Outdoor PTZ Camera
ICCC AND ITMS CONTROL CENTRE APPLICATIONS
Centralize traffic Information & Management Software at ICCC (Including but not limited to ATCS Application, ITMS application, Analytical dashboards, Map, reproting, Field equipment status, SLA reporting, software, licenses etc.features required as per RFP)
Video Management and Video Analytics software (1000 Cameras) Where MSI may provide separate video management system and video analytics software.
TRAFFIC CONTROL, INFORMATION AND MANAGEMENT
Smart traffic sensor for traffic management and Analysis
Smart traffic sensor application for traffic management and Analysis (Integrated with ITMS application)
Operation And Maintenance cost (OPEX)
1st Year
2nd year
3rd Year
4th Year
5th Year
Network Connectivity and Bandwidth Cost for 5 years
INDIVIDUAL COMPONENT LIST (Note: Bidders are advised to give Individual Component cost for below from S.No. 7.01 to 7.47 , however this cost will not be considered for evalution of financial bid )
ATCS Controller
ATCS Controller cabinet and other accessories inside the cabinet
ATCS Controller Cabinet foundation
ATCS traffic detector interface
Per meter cabling cost (cable from controller to pole)
Per meter underground ducting and reinstatement cost (duct from controller to pole)
Per meter micro-trenching and reinstatement cost
Traffic Signal Aspects RED
Traffic Signal Aspects AMBER
Traffic Signal Aspects GREEN
Vehicle Countdown Timer
Pedestrian Walk Man and stop man composite signal
Pedestrian audio tactile device
Smart Traffic Sensor
ATCS Traffic Detector
Junction Box
Earthing with material
Communication/Networking hardware per junction
Cantilever Poles along with foundation
Straight Pole along with foundation
Network Switch Ruggedized at field
IR Illuminator
Red Light Violation Detection (RLVD) sensors
ANPR camera
Local processing unit
Field Storage device 3 arm junction
Field Storage device 4 arm junction
Field Storage device 5 arm junction
UPS 3 arm junction
UPS 4 arm junction
UPS 5 arm junction
Battery
Mounting structure with pole, junction boxes etc.
SVD camera
VMS per camera licence
PA Controller
PA Speaker
Primary /Secondary Server
Firewall
Storage as per the solution requirement with 180 days backup
8 port switch
24 port switch
48 port switch
Load balancer
NVR for 1000 cameras
ATCS Application license
ITMS Application
KEY RESOURCES (Note: Bidders are advised to give Man Month cost for below from S.No. 8.01 to 9.05, however this cost will not be considered for evalution of financial bid )
Team Leader-cum-Program Manager
Solution Architect
Database Expert
Security Expert
Intelligent Traffic Management Expert
Network Expert
OTHER RESOURCES
Application Developer
Software Test Lead
Software Testing Engineer
Integration Expert
Support Staff
Technosys Security Systems Pvt Ltd
Amnex Infotechnologies Private Limited
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid