| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.2 CrAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹11.5 Cr+₹25.1 L (2.24%)Rejected-Finance 13 UTKARSH HOUSING SOCIETY SHARADA NAGAR CHOWK AMBAJOGAI ROAD LATUR 413512 | LATUR | MAHARASHTRA | 413512 | L2 | Rejected-Finance L2 | |
| 3 | L3₹11.6 Cr+₹36.4 L (3.25%)Rejected-Finance | L3 | Rejected-Finance L3 |
Tender Value
₹11.3 Cr
EMD Value
₹11.3 L
Closing Date
23 Dec 2022, 5:30 pmClosed
Addl.C.E.O.Z.P.Latur
Z.P. Latur
Construction of Government Quarters Type I,II,III,and IV At. P.S. Udgir Dist. Latur Providing E.I. in Type -I-4, Type- II -16, Type-III-04, Type -IV- 2 Quarters, Street Lighting in Qurters Premises for Panchayat Samiti, Udgir Dist.Latur
2022_LATUR_857856_1
ZPL/W/E-T/PS/50/2022-23
Open Tender
Civil Works
Percentage
730 days
At. Udgir Tq. Udgir
Please refer Tender documents.
4 documents required · 4 mandatory
₹20,000
₹11.3 L
10 Feb 2023
9 Dec 2022
26 Dec 2022
9 Dec 2022
23 Dec 2022
9 Dec 2022
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area & stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.5 m.) By Mechanical Means [ Type- I Quarter 4 Nos. ] | 702.83 | Cum. | 215.28 | ₹1,51,305.24 |
| 2 | Type- II Quarters = 16 Nos. | 780.14 | Cum. | 215.28 | ₹1,67,948.54 |
| 3 | Type- III Quarters = 4 Nos. | 517.65 | Cum. | 215.28 | ₹1,11,439.69 |
| 4 | Type- IV Quarter 2 Nos. | 691.8 | Cum. | 215.28 | ₹1,48,930.7 |
| 5 | Compound Wall | 203.13 | Cum. | 215.28 | ₹43,729.83 |
| 6 | Water main Storage with Borewell | 84.48 | Cum. | 215.28 | ₹18,186.85 |
| 7 | Excavation for foundation in hard murum including removing the excavated material upto distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.50 m) By Mechanical Means SSR 2022-23 ITEM NO. 21.06 & PAGE NO.197 Type- III Quarters = 4 Nos. | 35.58 | Cum. | 295.36 | ₹10,508.91 |
| 8 | Type- IV Quarter 2 Nos. | 40.38 | Cum. | 295.36 | ₹11,926.64 |
| 9 | Compound Wall | 38.99 | Cum. | 295.36 | ₹11,516.09 |
| 10 | Excavation for foundation in hard murum including removing the excavated material upto distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.50 m) By Mechanical Means [ Type- I Quarter 4 Nos. ] | 54.53 | Cum. | 295.36 | ₹16,105.98 |
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
BOQ_1489038.xls
BOQ Document • 1.17 MB
110505420.pdf
Tender Document • 0.13 MB
D.D.BELOW.pdf
Tender Document • 0.08 MB
110505422.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .