| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹83.8 Laccepted-aoc | accepted-aoc |
Tender Value
₹83.8 L
EMD Value
₹1.7 L
Closing Date
6 Apr 2026, 9:30 pmClosed
Rural Development and Panchayat Raj Department
Manjunath Sangavi
Construction of Road and CDs To Mustru Doddi (Honalli) in Shorapur Taluk, Yadgir District.
RDPR/2025-26/RD/WORK_INDENT25528
RDPR/2025-26/RD/WORK_INDENT25528
Open
Roads
Two Tender Document System(Two Cover)
RDPR Division Office Yadagiri
7 documents required · 7 mandatory
Minimum financial turnover (civil engineering construction works) not less than two times the annual payments from this contract (Rs. xxxxx Lakhs)
Satisfactoriy completed (atleast 90%) as prime contractor at-least one such similar work of value not less than Rs. xxxxxxx (80% of estimated cost of tender)
Executed in any one year the following minimum quantities of work (Cement Concrete - xxxx cum, Earthwork - xxxx cum, etc) (80% of peak rate of construction)
Tenderer or his identified Sub Contractor should possess valid Electrical License for executing building electrificatio works and should have executed similar electrical works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one year
Tenderer or his identified Sub Contractor should possess valid license for executing water supply / sanitary engineering works and should have executed similar works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one year
Owning the following key and critical equipment for this work (xxxx, xxxx, xxxx)
Liquid assets and /or availability of credit facilities of no less than Rs. xxxxxx Lakhs (estimated cash flow for 3 months of peak construction period)
Total value of civl engineering works executed and payments received in the last five years (year-wise)
List of existing commitments and ongoing works
List of works for which tenders already submitted
Banker Details for reference
Construction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awarded
Reports on the financial standing of the tenderer, such as profit and loss statements and auditor’s reports for the last five years
Qualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awarded
List of Financial Resources with Certificates
3.To qualify for award of this contract, Each tenderer in his name should have in the last five year from 2020-21 to 2024-25 Satisfactorily completed, as a prime contractor, for at least one similar work of value not less than Rs. 41.89 Lakhs attach certificate by not below rank of Executive Engineer with Indent No. from e-Procurement Portal.
4.To qualify for award of this contract, Each tenderer in his name should have in the last five year from 2020-21 to 2024-25 Satisfactorily executed quantities of works in any one year for continues period of 12 months 80 percent of tendered W D C having Quantities should be isuued from not below the rank of EE with complete Indent No. 1.Earth Excavation/Embankment 2963.19 Cum 2. GSB 294.40 Cum 3. WBM/WMM 220.80 Cum 4. RCC/PCC 564.56 Cum 5. Steel 0.88 M.T.
1.The Tenderer shall have valid class -III KPWD Licence
2.To qualify for award of this contract, Each tenderer in its name should have in the last five year 2020-21 to 2024-25 Achieved in at least Two financial years an average annual financial turnover not less than in all classes of civil engineering construction works only of Rs. 83.77 Lakhs. Attach certificated from C.A. on Letter Head Two times amount put to tender. with UDIN No. otherwise bid will be directly disqualified Turnover Certificate issued by CA.
5.Line of credit Rs. 25.13 Lakhs should be enclosed in prescribed format LOC issued by authorized Bank.
6.Bid Capacity on Letter of the contractor
₹2,100
₹1.7 L
6 Apr 2026
25 Mar 2026
8 Apr 2026
2 Apr 2026
2 Apr 2026
Construction of Road and CDs To Mustru Doddi (Honalli) in Shorapur Taluk, Yadgir District.
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable ...
Surface Drains in soil:- Construction of unlined surface drains of average cross sectional area 0.40 m2 in soil to specified lines, grades, levels and dimensions. Excavated material to be used in emb...
Excavation in Soil with Dozer with lead upto 100 m:- Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils &...
Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacte...
Construction of Embankment with Material Obtained from Roadway Cutting:- Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundat...
Construction of Embankment with Material Obtained from Borrow Pits:-Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior ex...
Construction of Subgrade and Earthen Shoulders:- Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreadi...
Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc Ordinary Kilometer Stone (Precast) PWD CSR 2023-24 I.N...
Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting.,PWD CSR 2023-24 Vol-3 I.NO 8.18 PgN...
Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc PWD CSR 2023-24 I.NO 8.16(III) PgNo 67.
Direction and place Identification signs upto 0.9 sqm size board :- Providing and erecting direction and place identification retroreflectorised sign as per IRC:67:2022 made of high intensity grade sh...
Retro-reflectorised Traffic Signs 600 mm Equilateral Triangle :- Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retr...
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC...
Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20m x 0.9m size made...
Construction of Granular Sub-Base by Mix in Place Method by providing well graded Gravel, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavato...
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory rolle...
Providing and constructing un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), c...
PIPE CULVERT 1000MM DIA ONE VENT HUME Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry,cement concrete, wood work, steel work, inclu...
Removing all type of Hume Pipes and Stacking including Earthwork and Dismantling of Masonry Works. PWD CSR 2023-24 I.NO 2.17.IX.A PgNo 192
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution li...
Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. T...
Percentage Additionalities for Formwork, Centering & Scaffolding 8%
Supplying, Fitting and Placing TMT FE 550/500D steel Reinforcement including cost of all materials machinery,labour, cleaning, straightening, cutting,bending, hooking, laping/welding joints,tying w...
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation,...
Back filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification (With Granular Material).PWD CSR 2023-2024 vol-3 I.NO 12.3.A PgNo 117
Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading,...
Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification PWD CSR 2023-24 ...
Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications PWD CSR 2023...
A toe wall for toe protection can either be in dry rubble masonry in case of dry rubble pitching or pitching with stones in wire crates or it can be in PCC M15 nominal mix if cement concert block have...
Percentage Additionalities for Formwork, Centering & Scaffolding 8%
CONSTRUCTION OF 500 MM DIA BURRIED CONDUITS 3 NOS.: Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including sett...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. T...
Addendum I Percentage Additionalities for Formwork, Centering & Scaffolding -8% Culverts (Head walls)
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tyin...
Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row 500mm dia Laying Cement Concrete Pipe NP3 (burried conduits) on first class bedding of granular materia...
Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading...
Back filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification, with all lead, lifts, loading & unloading charges, cost and conveyance...
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
kw-3-25528-1.doc
Tender Document • 1.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .