| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹38.7 LAccepted-AOC | 1 | Accepted-AOC CONTRACT AWARDED DUE TO LOWEST BIDDER | |
| 2 | 2₹41.5 L+₹2.2 L (5.57%)Rejected-Finance | 2 | Rejected-Finance overall L2 bidder | |
| 3 | Rejected-Technical | - | Rejected-Technical PQC NOT QUALIFIED |
Tender Value
₹38.4 L
EMD Value
₹77,000
Closing Date
12 Mar 2022, 6:00 pmClosed
SUPERINTENDING ENGINEER
O/o SE OMC IV BTPS OBRA
PREVENTIVE BREAKDOWN MAINTINANCE OF TRANSFORMER GENERATOR AUXILLIARY INSTALLED IN 5X200MW BTPS OBRA TPS
2022_RVUNL_675792_1
T 02/OMC IV/EMD I/BTPS/2022 23
Open Tender
Electrical Works
Fixed-rate
365 days
EMD I BTPS OBRA
AS PER TENDER DOCUMENTS
3 documents required · 3 mandatory
₹2,360
DY CAO CFA BO BTPS OBRA
₹77,000
6 Apr 2022
12 Feb 2022
14 Mar 2022
12 Feb 2022
12 Mar 2022
12 Feb 2022
Amount
Following works are to be carried out in connection with preventive and Breakdown maintenance of power & service transformers of 200MW units BTPS, Obra
Pre overhauling, centrifuging activities:
O/H & Centrifuging of 250/240MVA 400/15.75KV GT or 400/220/33kV ICT
O/H and centrifuging of 15MVA,15.75/6.9KV UAT:
O/H and internal inspection of OLTC of UAT, complete dismantling and reassembly:
O/H & centrifuging of 1.6MVA,6.6/0.4KV Service transformer:
Painting of 1.6MVA,6.9/0.4KV service transformer complete with radiator, conservator with one coat red oxide metal and two coat spray painting with smoke grey color acolyte enamel paint after thoroughly cleaning the surface of the equipments to be done as per procedure.(Approx. area of each transformer 175 square mtr.).
Pre centrifuging activities like shifting of C/F machine, hose pipe, power supply boards, filled & empty drums:
Centrifuging of 50MVAR, 400KV shunt reactor and attending oil leakage. ( Approx. 40 KL oil capacity)
Pre centrifuging activities like shifting of C/F machine, hose pipe, power supply boards, filled & empty drums:
Centrifuging of 30MVA Station transformer with OLTC:
Following works are to be carried out during preventive maintenance of GT,UAT,1.6MVA,6.9/0.4KV service transformer (UST,ESP, SST,WTP,AHP, CHP transformers),15.75KV bus duct outside T. G. hall & cleaning of various power transformers:
Preventive maintenance of GT, UATs, 15.75KV bus duct outside T.G.hall.
Replacement of all the 3 phases LV bushing gasket of UATs.
Replacement of HV bushing oil seals of UATs
Replacement of LV bushing oil seals of service transformers (UST, SST, ESP, AHP, WTP and CHP transformers):
Cleaning of following power transformer with help of water jet, mild detergent and old clothes for removing the oil and dust scales accumulated on transformer tank, its cooling banks, oil pipe lines, conservator etc and arresting oil leakage.
250/240MVA,15.75/420KV GT
315/240MVA, 400/220/33KV ICT
1.6MVA, 6.9/0.4KV service transformer (UST,ESP,SST,CHP,AHP,WTP & stacker reclaimer transformer)
50MVAR shunt reactor & NGR
30MVA, 220KV/6.9KV station transformer
15MVA, 15.75/6.9KV UAT
Following works are to be carried out in connection with round the clock supervision & maintenance work of various power & service transformers of BTPS, Obra:
Round the clock supervision & maintenance of various power transformers and service transformers:
Following works shall be carried out connection with Overhauling & preventive maintenance work of mulsifire installation, 400KV MCB panels, 400KV PLCC panel switchyard compressor panel, service transformer marshalling box etc. of 5X200MW BTPS Obra
Complete O/H of mulsifire system with deluge valve including water and air line
Painting of mulsifire pipe line with one coat red oxide and 2 coat apcolite synthetic enamel paint after thoroughly cleaning the surface of equipment with help of zero size emery paper etc. for complete removal of dust & rust (Approx. area 88 Sq.M.)
Preventive maintenance of MCB control and relay panels
Preventive maintenance of 400KV/220KV S/Y mulsifire compressor, GT mulsifire compressor control panels
Preventive maintenance of 400/220KV S/Y compressor control panels, motor J.B. bus bar chamber etc.
Preventive maintenance of marshalling boxes of 1.6MVA,6.6KV/0.4KV service transformers of WTP, Ash handling, Coal handling, SST, UST, ESP etc.
Preventive maintenance of 400KV transmission line PLCC control & relay panel
Following works are to be carried out on cooling fans, Dismantling of cooling fan from place of mounting on transformer, shifting to staff shed in 400KV S/Y, removing fan blade, fan guard, cleaning them, shifting the burnt motor to the workshop of bidder, rewinding, testing, assembly of fan guard, fan blade and installation on transformer if required of 5x200MW power transformer
750 Watt, 415V, 3 phase, 50 C/S.
1200 Watt, 415V, 3phase, 50 C/S.
Repair of damage slot portion of fan motors by staggering the core.
750 Watt motor.
1200 Watt motor.
Repair of bearing housing of fan motor
Following works are to be carried out on Dismantling of cooling fans from place of mounting ,removing fan blades, fan guard, shifting the burnt motors, to workshop of the firm , rewinding, testing, its assembly and mounting as per requirement
700W,3-phase,415V,50C/s
370W,3-phase,415V,50C/s
132 to 250W,3-phase,415V,50C/
Routine maintenance of cooling fan of dry type transformers. For this job one skilled and one unskilled person must be depute for eight hours (10:00 AM to 18:00 PM) daily. If problem raised in other time of this slot , person has to made available by firm . If needed, more and efficient person must be deployed by firm to accomplish the job. If any problem rose in odd hours.
Breakdown maintenance of cooling fan of dry type transformer. If fan is not running, checking of electrical circuit and removing the fault as and when required. It also includes replacement of cables of fan as and when required
Replacement of OTI, WTI, relay, starter, coil, etc. On transformers. if any alteration needed in mounting of same , it has to be done by firm
Replacement of rubber pads and unbalanced fan blades in case of vibration as per requirement
Greasing , oiling of bearing of fan
Overhauling of fan motor. Which may include dismantling, cleaning, Replacement of bearing, greasing, oiling, adjustment, varnishing, assembling, etc of fan motor.
Following works shall be carried out connection with Preventive and Breakdown maintenance work in 15.75KV Bus duct, NGR and Stator water system of 5x200MW units of BTPS, Obra:
Preventive maintenance of expansion tank and its gauge glass:
Checking & attending abnormal H2 gas leakage in 5x200MW Generators and its associated piping’s and H2 gas coolers.
Preventive maintenance of 15.75KV bus duct inside T.G.hall:
Changing excitation polarity in all 5x200MW units:
Preventive maintenance of slip ring carbon brushes, brush holder, neutral grounding transformer and reactor in 5x200MW units:
Dismantling and replacement of brush rocker assembly of slip ring for testing of rotor and remounting:
Preventive maintenance of earthing transformer and neutral grounding reactors of 5X200MW Units.
Isolation of 15.75KV bus duct outside T.G. Hall from man hole near A-Axis wall for identification of stator E/F:
Preventive maintenance of seal oil filters, stator water filter, damper tank, hydraulic seal oil tank, ILI, expansion tank H2 & CO2 gas manifolds, H2 and seal oil pipe lines & valves,H2 gas driers etc.
Attending leakage of oil from AC/DC seal oil pumps including replacement of seal if required.
Preventive maintenance and greasing of bearings in A.C. seal oil pump in 5x200MW units:
Preventive maintenance & hydraulic testing of H2 gas coolers.
Preventive maintenance and hydraulic testing of seal oil coolers in 5x200MW units.
Decoupling, removal, remounting alignment and coupling of AC/DC seal oil pumps:
Preventive /Cleaning work of 15.75 KV duct at 4 meter.
Following works shall be carried out in connection with Emergency & preventive maintenance of Generator and its auxiliary equipments in 5X200MW units of ‘B’TPS, Obra
Reconditioning of all six no. 15.75KV bus duct perplex containers in 5x200MW units.
H2 gas purging and re-charging
Monitoring and maintaining the level of hydraulic seal oil tank round the clock manually by opening and closing the adjacent valve after float valve in emergency.
Normalizing seal oil system and draining oil from Gen. casing and hydraulic seal oil tank round the clock in emergency.
Filling H2 gas cylinders in Generator casing of 5x200MW units to maintain H2 pressure in Gen. casing upto 3.0Kg/cm2 pressure or as per instruction of concerned AE/JE in running units.
Following works are to be carried out in connection with To & Fro transportation of filled and empty hydrogen gas and carbon-di-oxide gas cylinders from hydrogen generating plant/ stores of WTP/Central stores, ATPS to the units of 5x200MW ,BTPS, Obra.
To & Fro transportation of filled and empty hydrogen gas and carbon-di- oxide gas cylinders in normal working hours including Sunday/Holiday from hydrogen generating plant/ stores of WTP/ Central stores ,A,TPS to the units of 5x200MW BTPS on normal working days including Sunday & holiday. NOTE: - Average 70 cylinders per day shall be transported
To & Fro transportation of more than 100 nos. filled & empty hydrogen gas and carbon-di-oxide gas cylinders in emergency (During odd hours) from hydrogen generating plant/ stores of WTP/ Central stores, ATPS to the units of 5x200MW BTPS.
Following works are to be carried out in connection with Preventive and Breakdown maintenance work of GT cooling control cabinets, PT cubicles ,stator water, seal oil and Gen. relay panels in 5X200MW, BTPS, Obra
Preventive maintenance of GT cooling control cabinet, UAT-A & B,MB etc.
Preventive maintenance of PT cubical:
Preventive maintenance of stator water panel.
Preventive maintenance of seal oil panel.
Preventive maintenance of Generator relay panel.
M/S SCINTECS PROCESS CONTROL
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .