Loading…
Loading…
Tender Value
₹2.4 Cr
EMD Value
₹4.9 L
Closing Date
5 Oct 2026, 3:00 pm
EE CD XVI IFCD
Office of EE CD XVI IFCD
Protection of Govt. Land by Construction/Restoration of Boundary Wall at various locations between RD 8000m to RD 14100m of Supplementary Drain
2026_IFC_299027_1
EE/CD-XVI/2026-27/39
Open Tender
Civil Works
Percentage
120 days
Delhi
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹4.9 L
Yes
26 Sept 2026
26 Sept 2026
5 Oct 2026
26 Sept 2026
5 Oct 2026
26 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 720 | Cum | 260.87 | ₹1,87,826.4 |
| 2 | Centering and shuttering including strutting, propping etc. and removal of form work for : Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. | 1,896 | Sqm | 844.35 | ₹16,00,887.6 |
| 3 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.In cement mortar | 518 | Cum | 2,064.71 | ₹10,69,519.78 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 80 | Cum | 6,826.92 | ₹5,46,153.6 |
| 5 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 coarse sand) | 912 | Cum | 7,147.87 | ₹65,18,857.44 |
| 6 | Available Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 coarse sand) | 130 | Cum | 3,820.65 | ₹4,96,684.5 |
| 7 | Removing mortar from bricks and cleaning bricks including stacking within a lead of 50 m (stacks of cleaned bricks shall be measured): From brick work in cement mortar | 64,750 | Each | 6.71 | ₹4,34,472.5 |
| 8 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure in all shapes and sizes in : Cement mortar 1:6 (1 cement : 6 coarse sand) From floor I level up to floor II level. | 199 | Cum | 8,414.39 | ₹16,74,463.61 |
| 9 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 248 | Cum | 9,065.56 | ₹22,48,258.88 |
| 10 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses,
parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor two level, excluding the cost of centering, shuttering and finishing: 1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 36 | Cum | 8,972.46 | ₹3,23,008.56 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 16.35 MB
BOQ_398999.xls
BOQ • 0.43 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .