Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹88.4 LAccepted-AOC 633 701 KANCHANPUR CHINHAT MATYARI LUCKNOW LUCKNOW UTTAR PRADESH 226018 | LUCKNOW | UTTAR PRADESH | 226018 | ₹88.4 L | 1 | Accepted-AOC L1 |
| 2 | 2₹90.0 LRejected-Finance 0 GARUN NAGAR PADRAUNA PADRAUNA KUSHINAGAR UTTAR PRADESH 274304 UDYAM UP 47 0029239 | KUSHI NAGAR | UTTAR PRADESH | 274304 | ₹90.0 L | 2 | Rejected-Finance Being Second Lowest |
Tender Value
₹1.1 Cr
EMD Value
₹2.1 L
Closing Date
10 Jun 2026, 2:00 pmClosed
General Manager (Zone-4) Agra
H.No A-121, Sec-13, Avas Vikas Colony Sikandra, Agra (U.P)
CONSTRUCTION OF KITCHEN, STORE AND DINING HALL (G Plus 1) AT VRINDAVAN RESEARCH INSTITUE VRINDADAVAN DISTRICT - MATHURA (U.P)
2026_UPPRC_1156447_1
19/GM-4/UPPCL/2026-27 Dated 30.05.2026
Open Tender
Miscellaneous Works
Percentage
180 days
Vrandavan District Mathura
Please refer Tender documents.
2 documents required · 2 mandatory
₹17,700
₹2.1 L
office of General Manager (Zone-4) Agra
3 Aug 2026
2 Jun 2026
10 Jun 2026
2 Jun 2026
10 Jun 2026
2 Jun 2026
3 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in- Charge: All Kind of Soil | 47.17 | Cum. | 126.46 | ₹5,965.12 |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lift. | 33.02 | Cum. | 139.65 | ₹4,611.24 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) (Base Concrete) | 14.09 | Cum. | 4,853.39 | ₹68,384.27 |
| 4 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 15.3 | Cum. | 1,513.12 | ₹23,150.74 |
| 5 | Treatment of soil under existing floors using chemical emulsion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1 :2 (1 cement : 2 Coarse sand) to match the existing floor: With Chlorpyriphos/Lindane E.C. 20% with 1% concentration | 101.97 | Sqm. | 220.9 | ₹22,525.17 |
| 6 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size) (Footing) | 31.58 | Cum. | 6,444.88 | ₹2,03,529.31 |
| 7 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size) (Column upto plinth) | 1.36 | Cum. | 6,444.88 | ₹8,765.04 |
| 8 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement 1:1.5:3 (1 cement : 1.5 coarse sand(zone-lll) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) Column Ground Floor | 8.15 | Cum. | 7,732.47 | ₹63,019.63 |
| 9 | First floor | 11.65 | Cum. | 7,732.47 | ₹90,083.28 |
| 10 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size) (Plinth Band) | 9.86 | Cum. | 6,444.88 | ₹63,546.52 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.57 MB
Bid_Reserch.pdf
Tender Documents • 4.82 MB
BOQ_2166924.xls
BOQ • 0.57 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].