Tender Value
Refer Docs
Closing Date
5 May 2021, 4:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer PMGSY Division Pulwam
Office of Executive Engineer PMGSY Division Pulwama near R and B Complex Main chowk Pulwama
Providing and Laying of Renewal Coat on road from Pompore Wuyon KM7th RD750 to Gundbal Block Pampora District Pulwama Length 1.50Kms Pompore Wuyon KM7th RD10 to Dusoo Block Pampora District Pulwama Length 1.0Kms T03 to Herpatal Block Pampora
2021_KSRRD_108803_3
E-NIT no. 01/EE/PMGSY/PUL of 2021-22 dt 20-04-21
Open Tender
Civil Works - Roads
Item Rate
180 days
Pulwama
Please refer Tender documents.
14 documents required · 14 mandatory
₹0
Exempted
Office of Executive Engineer PMGSY Division Pulwam
28 May 2021
20 Apr 2021
7 May 2021
23 Apr 2021
5 May 2021
27 Apr 2021
24 Apr 2021
135 days
Amount
Part A (Dussoo)
Pavement
Scarifying the existing bituminoous road surface to a depth upto 50 mm by mechanical means & disposal of scarified material with a lift up to 3m.& lead up to 1000m as per technical specification clause 301 .4 .including cost and carriage of all materials from approved source to site of work, with all leads, lifts, loading, unloading, stacking and octori.(Finished work to be measured, complete Job)
Water Mix Macadam (WMM)Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. including cost and carriage of all materials from approved source to site of work, with all leads, lifts, loading, unloading, stacking and octori.(Finished work to be measured, complete Job)
Tack Coat: Providing and Laying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 Kg per Sqm on the prepared bituminous surface cleaned with Hydraulic broom ar per technical specification clause 503. including cost and carriage of all materials from approved source to site of work, with all leads, lifts, loading, unloading, stacking and octori.(Finished work to be measured, complete Job)
Bituminous Macadam :- P/L Bituminous Macadam with Hot mix plant using crushed aggregate of grading as per Table 500.4 premixed with bituminous binder, transported to site upto a lead of 1000 m laid over a previously prepared surface with paver finisher to the rquired grade, level and alignment and rolled to achieve the desired compaction as per technical specification clause 504.including cost and carriage of all materials from approved source to site of work, with all leads, lifts, loading, unloading, stacking and octori.(Finished work to be measured, complete Job)
25mm thick SDBC :- Providing and laying semi- dense Bituminous concrete using crushed stone aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site by tippers, laying with paver finisher equiped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction and density as per specification, complete and as per directions of Engineer-in- Charge. 25 mm compacted thickness with bitumen of grade VG-30 @ 5% (percentage by weight of total mix) and lime filler @ 2% (percentage by weight of Aggregate) prepared in Drum Type Hot Mix Plant of 60-90 TPH capacity including cost and carriage of all materials from approved source to site of work, with all leads, lifts, loading, unloading, stacking and octori.(Finished work to be measured, complete Job)
Seal Coat :- Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A ,Type B and Type C as per Technical Specification Clause 510.specification 1995) By Mechanical Means Type B Bitumen (S-90). including cost and carriage of all materials from approved source to site of work, with all leads, lifts, loading, unloading, stacking and octori.(Finished work to be measured, complete Job)
Shoulders :- Development of shoulders using naturally occuring granular material/Khak Bajri including spreading in uniform thickness, rolling with smooth wheel roller 80-100 KN in stages to proper grade, watering and compacting to the required density including cost and carriage of all materials from approved source to site of work with all leads lifts loading and octroi complete job.( finished work to be measured
Part B (Gundbal)
Pavement
Scarifying the existing bituminoous road surface to a depth upto 50 mm by mechanical means & disposal of scarified material with a lift up to 3m.& lead up to 1000m as per technical specification clause 301 .4 .including cost and carriage of all materials from approved source to site of work, with all leads, lifts, loading, unloading, stacking and octori.(Finished work to be measured, complete Job)
Water Mix Macadam (WMM)Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. including cost and carriage of all materials from approved source to site of work, with all leads, lifts, loading, unloading, stacking and octori.(Finished work to be measured, complete Job)
Tack Coat: Providing and Laying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 Kg per Sqm on the prepared bituminous surface cleaned with Hydraulic broom ar per technical specification clause 503. including cost and carriage of all materials from approved source to site of work, with all leads, lifts, loading, unloading, stacking and octori.(Finished work to be measured, complete Job)
Bituminous Macadam :- P/L Bituminous Macadam with Hot mix plant using crushed aggregate of grading as per Table 500.4 premixed with bituminous binder, transported to site upto a lead of 1000 m laid over a previously prepared surface with paver finisher to the rquired grade, level and alignment and rolled to achieve the desired compaction as per technical specification clause 504.including cost and carriage of all materials from approved source to site of work, with all leads, lifts, loading, unloading, stacking and octori.(Finished work to be measured, complete Job)
25mm thick SDBC :- Providing and laying semi- dense Bituminous concrete using crushed stone aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site by tippers, laying with paver finisher equiped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction and density as per specification, complete and as per directions of Engineer-in- Charge. 25 mm compacted thickness with bitumen of grade VG-30 @ 5% (percentage by weight of total mix) and lime filler @ 2% (percentage by weight of Aggregate) prepared in Drum Type Hot Mix Plant of 60-90 TPH capacity including cost and carriage of all materials from approved source to site of work, with all leads, lifts, loading, unloading, stacking and octori.(Finished work to be measured, complete Job)
Seal Coat :- Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A ,Type B and Type C as per Technical Specification Clause 510.specification 1995) By Mechanical Means Type B Bitumen (S-90). including cost and carriage of all materials from approved source to site of work, with all leads, lifts, loading, unloading, stacking and octori.(Finished work to be measured, complete Job)
Shoulders :- Development of shoulders using naturally occuring granular material/Khak Bajri including spreading in uniform thickness, rolling with smooth wheel roller 80-100 KN in stages to proper grade, watering and compacting to the required density including cost and carriage of all materials from approved source to site of work with all leads lifts loading and octroi complete job.( finished work to be measured
Part C: (T03 to Herpatal)
Pavement
Granular sub-base :- Granular sub-base / base / surface course with local materials (Table 400.13)by mix in place method normal Construction of granular sub-base by providing local material spreading in uniform layers manually on prepared surface , mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408.Using naturally occuring gravel. including cost and carriage of all materials from approved source to site of work, with all leads, lifts, loading, unloading, stacking and octori.(Finished work to be measured, complete Job)
WBM Grading 3 :-Providing , laying , spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 3 as per Technical Specificatoin Clause 405. including cost and carriage of all materials from approved source to site of work, with all leads, lifts, loading, unloading, stacking and octori.(Finished work to be measured, complete Job)
Tack Coat: Providing and Laying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 Kg per Sqm on the prepared bituminous surface cleaned with Hydraulic broom ar per technical specification clause 503. including cost and carriage of all materials from approved source to site of work, with all leads, lifts, loading, unloading, stacking and octori.(Finished work to be measured, complete Job)
Bituminous Macadam :- P/L Bituminous Macadam with Hot mix plant using crushed aggregate of grading as per Table 500.4 premixed with bituminous binder, transported to site upto a lead of 1000 m laid over a previously prepared surface with paver finisher to the rquired grade, level and alignment and rolled to achieve the desired compaction as per technical specification clause 504. including cost and carriage of all materials from approved source to site of work, with all leads, lifts, loading, unloading, stacking and octori.(Finished work to be measured, complete Job)
25mm thick SDBC :- Providing and laying semi- dense Bituminous concrete using crushed stone aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site by tippers, laying with paver finisher equiped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction and density as per specification, complete and as per directions of Engineer-in- Charge. 25 mm compacted thickness with bitumen of grade VG-30 @ 5% (percentage by weight of total mix) and lime filler @ 2% (percentage by weight of Aggregate) prepared in Drum Type Hot Mix Plant of 60-90 TPH capacity including cost and carriage of all materials from approved source to site of work, with all leads, lifts, loading, unloading, stacking and octori.(Finished work to be measured, complete Job)
Seal Coat :- Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A ,Type B and Type C as per Technical Specification Clause 510.specification 1995) By Mechanical Means Type B Bitumen (S-90). including cost and carriage of all materials from approved source to site of work, with all leads, lifts, loading, unloading, stacking and octori.(Finished work to be measured, complete Job)
Shoulders :- Development of shoulders using naturally occuring granular material/Khak Bajri including spreading in uniform thickness, rolling with smooth wheel roller 80-100 KN in stages to proper grade, watering and compacting to the required density including cost and carriage of all materials from approved source to site of work with all leads lifts loading and octroi complete job.( finished work to be measured
Maintenance for Five Years
1st Year
2nd Year
3rd Year
4th Year
5th Year
The Contractor has to quote the rates for Construction part without GST and GST @12% shall be added at the time of Allotment.
M/S S l Road COnstruction
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .