Loading…
Loading…
Tender ID
Tender Value
₹4.3 Cr
EMD Value
₹6.1 L
Closing Date
13 Feb 2026, 10:30 pmClosed
Shivamogga Bhadravathi Urban Development Authority
G R Basavarajappa
Development of Lake in Alkola Sy No.05 And Kashipur Sy No.62 Shivamogga.
SBUDA/2025-26/OW/WORK_INDENT102
SBUDA/2025-26/OW/WORK_INDENT102
Open
Other Works
Two Tender Document System(Two Cover)
SBUDA Commissioner Office Shivamogga
7 documents required · 7 mandatory
Banker Details for reference
Satisfactoriy completed (atleast 90%) as prime contractor at-least one such similar work of value not less than Rs. 203.20lakhs (50% of estimated cost of tender)
Executed in any one year the following minimum quantities of work (Desilting in Dry condition 14269.45 Cum, Earthwork excavation/ Embankment formation 22855.66 Cum, PCC/RCC 645.45 Cum, Reinforcement Steel (TMT steel) 17.94 Tonne, RCC SPUN / VIBRATED CAST PIPES (REINFORCED) NP3 pipes 650.00 m, Steel work welded in built up sections/ framed work (MS Pipes / Angles ) 33193.57 Kgs, Revetment / Pitching 1820.15 Cum)(80% of peak rate of construction)
Owning the following key and critical equipment for this work(1)Hydraulic Excavator- 4 No 2 No Own & 02 No Hire/Lease, (2) Tipper- 8 No -4 No Own and 4 No Hire/Lease, (3) Motor Grader- 01 No Hire/Lease, (4)Vibratory Roller - 2 No 1 No Own & 01 No Hire/Lease, (5) Self-Loading Concrete Ajax Machine - 2 No 1 No Own & 01 No Hire/Lease, (6) Water Tanker-4 No - 2No Own and 2No Hire/Lease)
Liquid assets and /or availability of credit facilities of no less than Rs. 121.93 Lakhs (estimated cash flow for 3 months of peak construction period)
KPWD Contractor Registration Certificate
KPWD Contractor Registration Certificate
Minimum financial turnover (civil engineering construction works) not less than two times the annual payments from this contract (Rs. 812.80 Lakhs)
Total value of civl engineering works executed and payments received in the last five years (year-wise)
Audited CA Certificate of Annual Turnover
Reports on the financial standing of the tenderer, such as profit and loss statements and auditors reports for the last five years
Tenderer or his identified Sub Contractor should possess valid Electrical License for executing building electrificatio works and should have executed similar electrical works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one year not applicable
Tenderer or his identified Sub Contractor should possess valid license for executing water supply / sanitary engineering works and should have executed similar works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one year not applicable
Construction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awarded
List of Financial Resources with Certificates Not applicable
₹5,000
₹6.1 L
12 Jan 2026
12 Jan 2026
17 Feb 2026
29 Jan 2026
29 Jan 2026
Development of Lake in Alkola Sy No.05 And Kashipur Sy No.62 Shivamogga.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
Alkola Kashipura Lake estimation.pdf
Others - Sanctioned Estimate • 19.20 MB
03 K W- 4 - Alkola-Kashipura lake draft RFP.doc
Tender Document • 1.48 MB
Alkola Kashipura_compressed.pdf
Others - Drawings • 69.67 MB
Alkola Kashipura.pdf
Others - Lake Site Ariel View • 0.87 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .