Loading…
Loading…
Tender Value
₹5.6 Cr
EMD Value
₹11.2 L
Closing Date
6 Jul 2026, 2:00 pm
Similar tender results from the same govt authority in the past 3 years.
Salem Division : FS+CS+CMSC-36, TWS+WCMSC-14, CS+CMSC-35, DS-15, TTR(TSR) - 3, Glued Joints - 570 sets & TWSEJ - 188 sets
SA-OT-06-2026-07
SA-OT-06-2026-07
Open
12 Months
Salem, Tamil Nadu
₹0
₹11.2 L
13 Jun 2026
13 Jun 2026
22 Jun 2026
applicable to SALEM Division with all correction slips issued upto date
Item- 1 PLEASE SEE THE DETAILS IN THE ITEM BREAK UP
S No. Item Description of Item Unit Qty Rate Amount
Dismantling and removing rail of all section &
length from track, laid on any type & density
of sleeper by removing fish plates, fastenings
& fish bolts and other materials including
stacking all released materials within an
average distance of 500 metres as directed by
Engineer in-charge. Note: 1.Cutting of rails
shall be paid separately. 2.Work to be done
under traffic block.
SALEM DIVISION-ENGINEERING/SOUTHERN RLY
Insertion of rails of all types & length in track,
laid on any type & density of sleeper to the
specified gauge under traffic block. Rates
include fastening of rail with sleepers with
standard set of fastenings and fixing of fish
plates and bolts or, if required, providing gap
for welding and stacking of released material
without infringement within 250m as directed
by Engineer-in-Charge. Note: Rail drilling and
cutting to be paid separately.
Through Sleeper Renewal (TSR) with PSC
sleepers involving removal existing sleepers
of any type along with fittings from track,
insertion of PSC sleepers lying along the cess /
formation / slope / toe within 5 metres height
with all fittings to specified spacing, gauge
and squareness, one round of through packing
to make track fit for 20 kmph speed, dressing
of ballast to standard profile, all in accordance
with the latest provisions of IRPWM and
stacking of all released material neatly at
specified places within an average lead of 100
m as directed by Engineer in-charge.
3 062011 For location of work not involving deep Each 4680.00 379.28 1775030.40
Fixing of fish plates with fish bolts on a joint of
all rail sections duly lubricating fish
plates/bolts with contractor's grease graphite
in running track condition including
transportation of fish plates and fish bolts
from nearest station / store / level crossing.
Note: Rail cutting & drilling to be paid
5 063070 Lubrication of Elastic Rail Clips on PSC ERC 39154.00 4.71 184415.34
sleepers with contractor's grease, conforming
to Railway's specifications, labour etc.
complete as per procedure prescribed in latest
edition of IRPWM.
Lubrication of Plate/Rail screws of Points and
crossings, SEJs, Bridges, Curves etc., with
greases graphite, including removal of screws
carefully without damaging sleepers, cleaning
with wire brush etc., both screws and dowel
hole, applying grease graphite, refixing the
screw and sealing the top and sides of screw
with grease graphite to prevent ingress of
moisture and corrosion with contractors
labour, tools, consumables under traffic
condition all lead and lift complete.
6 063122 By using Contractor's Grease Graphite Each 13853.00 42.74 592077.22
Gas cutting of rail of various sections with
contractor's tools & plants, as directed by
engineer in-charge :
SALEM DIVISION-ENGINEERING/SOUTHERN RLY
8 065020 Renewal of existing SEJ with improved SEJ with Set 188.00 9598.52 1804521.76
PSC sleepers under traffic block conditions as
per approved drawing including fixing of
special size bearing plate, rubber pad and
other sleeper / rail fittings, greasing to the
fittings, leading rails, sleepers & fittings to
site, leading and stacking of released
materials within a lead of 250m, cutting of
Rails, drilling of holes, fixing of related fittings,
providing temporary connection with
fishplates till welding of SEJ is done and
sleepers shall be given initial packing to make
track fit for 20KMPH speed. Note: (1) Rail
cutting and hole drilling shall be paid
separately. (2) One set comprise complete SEJ
on both rails at SEJ.
Under conditions not requiring Traffic Block:
Dismantling of existing BG turnouts, diamond
crossings and derailing switches with all types
of rails and sleeper layout, removing rails,
switches, crossings, sleepers & fastenings,
leveling of ballast to correct profile & stacking
all the released materials, sleepers,
fastenings, rails, switches & crossings
including segregating & stacking at specified
locations in a neat and countable manner,
within the lead of 250m & all lift, clear of
infringements, crossing of track, if any
complete, as directed - Note: 1. This item shall
be operated only when existing turnout is
replaced either with new turnout in case of
TTR or with plain track when existing turnout
is no more required at that location. 2. Rail
cutting will be paid extra under relevant item.
3. Laying of new turnout or plain track on
prepared ballast bed, as required, shall be
paid separately under relevant item.
9 071026 Derailing Switch (Under conditions not Set 15.00 6967.49 104512.35
requiring Traffic Block).
Assembling complete BG Turnout on staging,
clear of infringements, to correct gauge and
alignment as per standard drawings with all
types of rail sections over PSC sleepers at
specified locations, duly leading rails, special
sleepers, switches, crossings with a maximum
lead of 500m, all lift & crossing of track as
required and testing points with S&T staff for
throw of switch etc. at station yard after
levelling surface complete including
lubrication of all fastenings, complete in all
respect. Note: 1.Rail cutting and Drilling shall
be paid separately 2. Required P.Way
fittings/fastenings shall be supplied at the
SSE/P.Way stores.
SALEM DIVISION-ENGINEERING/SOUTHERN RLY
Assembling on temporary staging and
insertion of all types of turnouts including
diamond crossings and derailing switches on
prepared ballast bed during traffic block,
manually or by contractor's cranes, at
specified location with 52Kg / 60Kg rail section
on PSC sleepers with Railways rails/sleepers
available anywhere within 500m as per
standard drawing, duly leading sleepers, rails,
switches, crossings, fastenings etc. including
rail cutting, drilling, fixing of all components,
fittings etc. with housing of tongue rails as per
requirement of signaling including crossing of
track, filling and spreading of ballast in crib
and shoulder as required, linking of turnout
with existing track, attending track
parameters including lifting, providing one
round of packing to make track fit for 20 kmph
speed including lubrication of
fittings/fastenings, complete in all respect and
as directed by Engineer in-charge. Note:
Required P.Way fittings shall be supplied at
the SSE/P.Way stores.
Lifting for increase in ballast cushion of
existing points & crossing layouts up to 75mm
or part thereof including approach and exit
sleepers including one round of through
packing, correcting the disturbed sleeper
spacing, tightening of fittings, boxing of
ballast and ramping out on either side at
slope not steeper than 1 in 1000 or as
directed. Note: Item will be paid only when
lifting is 50mm or more.
Casual renewal of PSC sleepers on points and
crossings, derailing switches and diamonds
portion of any layout including packing under
new sleepers. All the released materials shall
be stacked at specified location in a countable
manner within the lead of 250m & all lift, clear
of infringements, crossing of track, if any
complete, as directed with contractor's
vehicles, consumables, stores, labour etc.
complete, as directed by Engineer in-charge.
Note: Approach and Exit sleepers shall be paid
as normal sleepers under relevant item.
15 074012 Sleepers of length more than 2.85 m and up to Each 12.00 933.14 11197.68
Renewal of CMS Crossing of all rail sections
with CMS crossing or with WCMS crossing
complete with fastenings including
replacement of worn-out rubber pads, liners
and ERC, as required. All the released
materials shall be stacked at specified
location in a countable manner within the lead
of 500m & all lift, clear of infringements,
crossing of track, if any complete, as directed.
with contractor's vehicles, consumables,
stores, labour etc. complete, as directed by
engineer in-charge. Note: Rail cutting and
drilling shall be paid separately under relevant
SALEM DIVISION-ENGINEERING/SOUTHERN RLY
Through Switches Renewals of existing
curved/Thick web switches with Thick Web
Switches on 60Kg Points and crossings
including approach rails as required, on PSC
sleepers, removing and re-fixing or replacing
fittings, fastenings, stretcher bar, blocks etc.,
with housing of tongue rails as per
requirement of signaling etc. including
preparation for operation of traffic block,
under line block conditions and packing of any
disturbed sleepers and boxing of ballast to
profile, picking of slacks of track at switch
portion, crossing of track wherever necessary.
All the released materials shall be stacked at
specified location in a countable manner
within the lead of 250m & all lift, clear of
infringements, crossing of track, if any
complete, as directed with contractor's
vehicles, consumables, stores, labour etc.
complete, as directed by engineer in-charge.
Note: Rail cutting and Hole Drilling shall be
paid under relevant item.
Manual deep screening of Plain track/ turnouts
as per procedure prescribed in IRPWM, June
2020 or latest, on PSC sleepers of any density
and throwing away screened muck arising out
of screening on toe of bank or on cess, if low
or on spoil banks above top of cutting
(including throwing and leveling, if required
beyond minimum 5m from the edge of cutting
which are up to 3m deep or alternatively
carting it up to 50m for disposing it off beyond
cutting or platforms) as per direction of
Engineer in-charge, including cutting cess for
effective drainage on both sides, one round of
kutcha packing with screened ballast and
further attending to track parameter to make
track fit for 20 kmph speed complete in all
respect. Note : Payment shall be made for
length along main line only for turnouts.
22 081028 Depth of 300 mm below bottom of sleeper for TRM 292.50 1035.46 302872.05
from 081021 to 081028 for disposal of muck
at a distance beyond 50m for every additional
lead of 50 metres or part thereof up to 500
metres for 1 TRM in station yard / cutting.
from 081021 to 081028 for disposal of muck
for additional lift of 1 metre or part thereof
beyond 3 metre lift in case of disposal of
muck from track f o r 1 TRM in station yard /
SALEM DIVISION-ENGINEERING/SOUTHERN RLY
25 092030 25mm gap 'in-situ' welding during traffic block Each 4928.00 1806.57 8902776.96
using Railway's welding portion & Welder and
finishing of weld to meet the prescribed
tolerances and pass all stipulated tests with all
required labour, materials, consumables,
tools, equipments etc. to complete the work in
all respect as per IR's "Manual for Fusion
Welding of Rails by Alumino - Thermic
Process" with latest correction slips, including
marking of welded joint, painting weld collar
with anticorrosive paint, restoration of track
near weld joint to original position and fixing
of joggled fish plate at new weld, to be
removed after passing of weld in USFD test as
directed by Engineer in charge. Note: 1. Only
welding portion and related accessories as per
Annexure - I and Welder shall be supplied by
Railways. 2. Hydraulic Weld trimmer shall be
used for chipping and profile Grinder for
finishing. 3. Required nos. of Joggled fish
plates shall be supplied by Railway at nearest
P. Way Stores and the same shall be returned
at nearest P. Way Store or at other location as
per direction of Engineer-in-Charge after
release from track.
First or Second Through Packing of track of all
sleeper density including giving a general lift,
as desired to eliminate sag after Deep
Screening work, lifting of track, lowering of
track and major realignment of curves and
formation rehabilitation as per procedure
prescribed in latest edition of IRPWM. Note:
General lift is normally 25 mm and isolated lift
may be up to 50 mm.
26 131032 For PSC Sleeper Track with Sleeper Density of TRM 5640.00 153.04 863145.60
Through packing of points and crossings,
derailing switches including gauging, fittings
recoupment, ballasting as required,
elimination of sag and to the required
alignment after Deep Screening as per
procedure prescribed in latest edition of
IRPWM complete as per direction of Engineer-
in-charge. Note: This work shall be operated in
exceptional cases with written approval at
DEN level when UNIMAT is not available and
immediate packing is required to pass train
SALEM DIVISION-ENGINEERING/SOUTHERN RLY
De-stressing of LWR/CWR track of any density
under traffic line block with contractor's
labours, tools, equipments and consumables
inclusive of all lead & lift. Activities include
cutting of LWR/CWR into convenient panels of
specified length, removal of ERCs, liners,
greasing of ERCs and liner contact area, lifting
rails and keeping them on rollers provided at
every 15 sleepers, working out elongation of
rail ends depending on prevailing site
conditions, pulling rails with the help of
Hydraulic Tensor to achieve the desired
elongation, cutting rails, as required,
removing rollers and placing rail in position,
re-fixing ERCs & liners and adjustment of gap
at SEJs : Note: (1) Welding of rail joints will be
paid separately. (2) Rail cutting and Hole
drilling shall be paid separately. (3) Opening
and closing of LC if required will be paid
separately. (4) As per procedure prescribed in
latest edition of IRPWM & CE's Circulars for
destressing of LWR/CWR, if any.
30 135011 With Railway's Hydraulic Rail tensor TRM 47000.00 52.78 2480660.00
Fixing Joggled Fish Plates with bolt / clamp
(supplied by Railway from nearest SSE Store)
in running track conditions at welds on rail, as
directed by engineer in-charge (drilling of
holes in rail, if required, shall be paid
33 136020 Providing wooden blocks under weld joint duly Each 2090.00 179.78 375740.20
transporting Railway's released wooden blocks
with rail screw / dog spikes and doing packing,
as directed under traffic condition. Note:
Wooden blocks, rail screws/dog spikes will be
supplied free at SSE/P.Way depot.
34 136030 Removing the existing wooden blocks under Each 2090.00 61.69 128932.10
joint, duly removing fittings, transporting and
stacking material wise in a countable manner
and handing over the wooden blocks & fittings
a t PWI's Depot or as directed by Engineer in
35 136060 Replacing existing glued joint rail with cut rails Each 1055.00 1999.79 2109778.45
or with glued joint rail or insertion of glued
joint by cutting existing track under traffic
condition by cutting rails, refixing with all rail
sleeper fastenings and providing required
gaps for carrying out welding as an alternative
to drilling holes or joining rails with fish plates
duly drilling holes as required including
stacking of released material and as directed
by engineer in-charge. Note: (1) Drilling holes
& rail cutting will be paid separately. (2)
Transportation of materials to the site of work
from supply points, if more than 250m, shall
be paid separately.
Anti-corrosive painting of rail outside track on
rail bottom, web, foot and fishing plane with
two coats of thickness of 100 microns each by
bituminous black paint confirms to IS-9862 of
reputed make including surface preparation,
as a complete job as per procedure prescribed
in latest edition of IRPWM.
SALEM DIVISION-ENGINEERING/SOUTHERN RLY
37 137030 Anti-corrosive painting to weld collar for Each 1128.00 28.51 32159.28
Thermit welded rail joints on track or on cess
for new welded joints to protect against
normal corrosion for any rail section with two
coats of ready mixed bituminous black paint
of reputed make confirming to latest IS:9862
on welded area up to 10cm on either side
including on the underside of rail foot by
brush including surface preparation as per
Railway's AT Weld Manual including lettering /
weld numbering with approved enamel paint
as directed Note: Before painting, dust, loose
rust and mill scale and dirt shall be removed
thoroughly by wire brushing. Scrubbing
welded area with water to make it free from
slag and other water soluble compounds to
Marking, inscribing, painting, writing,
bordering etc. on new / old iron surface at
various locations of Points & Crossings with
details of turn-in / turn-out reference station
mark on rail web for one set, duly preparing
surface with contractor's wire brush and
applying two coats of yellow synthetic enamel
paint of approved quality as background and
stenciling the details to suitable size, as
described for every curve reference station
mark / switch / crossing details with black
enamel paint of approved quality complete, as
directed : Note: Stenciling of letters is only
perm itte d. No hand written letters are
Dismantling of existing Turnout by removing
switches, rails, crossings, check rails, sleepers
and all fixtures and stacking all released
materials, removing ballast and muck by
excavating up to required depth, preparation
of formation bed, laying of pre assembled
Turnout by Railway's T-28 machine, linking of
track with all fittings, filling up of ballast duly
s c r e e n e d , packing, adjusting, opening &
housing of switch, testing operation of switch
assembly and attending track parameters, so
as to make track fit for 20 kmph speed
including disposing off muck to indicated
places up to free lead after the block working
etc. complete. Note: Rate includes making
necessary preparation for T-28 machine
movement like preparation of approaches,
transportation and laying of wooden
sleepers/blocks, etc.
SALEM DIVISION-ENGINEERING/SOUTHERN RLY
44 154080 Ballast equalisation & ballast profiling after TRM 1560.00 41.10 64116.00
completion of deep screening work by BCM
and/or after unloading of ballast by DMT
(Ballast Train), as directed by Site Engineer as
per IRPWM including heaping of ballast in
tamping zone keeping rails & sleeper top free
from ballast, spacing and squaring of sleeper,
gauging, cleaning of muck, proper fixing of
fastening, attention during each round of
sleeper tamping in relation to pre & post
working Note: Payment shall be made only
once in irrespective of numbers of TTRM
packing round and after restoration of normal
speed and restoration of complete ballast
profile and cess profile.
45 154090 Making cess in deep screened track by using TRM 1560.00 36.60 57096.00
screened muck discharged by BCM where
cess is low or cutting cess to required depth
up to 4m from centre of track, where cess is
high and disposing off extra muck beyond 5m
from edge of cutting which are up to 3m deep
or alternatively carting it up to 50m for
disposing it off beyond cutting or platforms, so
as to make cess as per standard profile
including providing proper slope.
SALEM DIVISION-ENGINEERING/SOUTHERN RLY
46 154120 Pre, during, and post BCM works for deep TRM 1560.00 465.49 726164.40
screening of ballast in Points and crossings
with all contractor's labour, tools and plants as
required to carry out the work to the standards
in specific time including crossing of tracks
etc. complete and as directed by the Engineer
- in - charge. I. Pre-BCM Operation : a) making
trenches for insertion of cutter bars at various
locations as per the directions of engineer in
charge. i.e.., one trench ahead of one rail
length from SRJ and second trench near
sleeper No 62 ( 1in 12) etc., b) Filling up
ballast up to sleeper level. c) Tightening of
fittings/ plate screws, ERCs, Stud bolts, check
rail bolts. II. During BCM Operation : a)
Assistance to S&T Department : Opening of
cables at approach of Points & Crossings, TLD
Boxes/ removing of Point motor and refixing
the same and covering cables after passing of
BCM in block period with S&T Staff. b)
Engineering : c) Removing of two long
sleepers i.e.., sleeper No 3 & 4 and refixing the
same in position during block after passage of
BCM. d) Removing obstruction i.e.., S&T CC
block duly digging with crow bars and
breaking with chisel/ hammer, cutting of rail
pegs with gas. e) To remove, excess ballast
on rail table for free movement of BCM and for
packing purpose. f) Extension of cutter bar
wherever required in assisting machine staff.
g) Removing of cutter bar/ Chain links from the
trenches after screening work by BCM. III .
Post BCM Operation : a) Packing switch portion
including Motor long sleeper i.e.., SRJ to heel
joint to reset Point for train movement & initial
packing of lead portion to allow train at
20KMPH and lifting the track in two stages
(50mm to 75mm in each lift) wherever
required for correcting the longitudinal
surfacing b) Dumping of ballast in the
deficient portion in crib, on main line turnout
side for initial packing purpose. c) Boxing /
Levelling of muck duly ensuring levelling of
muck on cess side and lowering of cess to the
deep screened depth and removing of muck in
between the lines and leading up to 250mts.
Note: 1. For technical reasons, some of the
points and crossings cannot be deep screened
either fully or partially by BCM, in which case,
the left over length will be deep screening
manually. 2. The length of points and
crossings assembly for payment of this item
should be taken from SRJ to longest concrete
sleeper available just beyond heel of crossing
along main line.
SALEM DIVISION-ENGINEERING/SOUTHERN RLY
Carrying out pre-tamping, during tamping and
post-tamping work for tamping track with all
types of rails, sleepers & sleeper density by
various Track Tamping machines, like
CSM,DUO/3X Machines which include : (1) Re-
adjustment of ballast, heaping-up of ballast,
filling-up of cavities in tamping zone by
picking ballast from stacks / shoulders / crib of
adjoining track up to lead of 50 m to ensure
effective packing; (2) Clearing of ballast on
sleepers to make them visible to operator, (3)
Clearing of ballast over rail foot to facilitate
holding of rail by rollers of TTRM; (4) Digging,
screening and replenishment of ballast at mud
pumping / rounded ballast in sleeper crib
location; (5) Tightening of loose fittings
immediately before & after tamping; (6)
Replacement of broken / missing fittings
supplied by Railway; (7) Correcting displaced
sleepers to position along with squaring; (8)
Re-setting of worked-out / fallen fittings. (9)
Removing and re-fixing joggled fish plates &
wooden blocks, wherever necessary; (10)
Manual consolidation of ballast in crib /
shoulders; (11) Removing and refixing of
traction bonds during the block in electrified
sections (12) Dressing of ballast Note: 1.
Tamping blocks are not identical & it may be
given at any time either during day or night.
2. Stages of payment a) 30% of the rate will
be paid on completion of pre tamping
attention, b) Balance 70% of the rate will be
paid on completion of post tamping. 3.
Recovery at the rate of twice the above
applicable rate will be effected in case
contractor fails to carry out pre/during/post
operation. 4.Payment shall be made only once
in irrespective of numbers of TTRM packing
round and after restoration of normal speed
and restoration of complete ballast profile.
SALEM DIVISION-ENGINEERING/SOUTHERN RLY
Carrying out pre-tamping, during tamping and
post-tamping works for tamping of Turnouts of
all types Under Traffic Block Conditions which
include :(1) Re-adjustment of ballast, heaping-
up of ballast, filling-up of cavities in tamping
zone by picking ballast from stacks / shoulders
/ crib of adjoining track up to lead of 50 m to
ensure effective packing; (2) Clearing of
ballast on sleepers to make them visible to
operator; (3) Clearing of ballast over rail foot
to facilitate holding of rail by rollers of
UNIMAT; (4) Digging, screening and
replenishment of ballast at mud pumping /
rounded ballast in sleeper crib location; (5)
Tightening of loose fittings including check
rails immediately before & after tamping; (6)
Replacement of broken / missing fittings
supplied by Railway; (7) Correcting displaced
sleepers to position along with squaring; (8)
Re-setting worked-out / fallen fittings; (9)
Removing and re-fixing joggled fish plates &
wooden blocks, OHE bonds & other
obstructions, wherever necessary ;(10)
Removing and re-fixing stretcher bar, as
directed; (11) Adjustment in opening and
housing of switch for testing operation of
points (12)Manual consolidation of ballast in
cribs and shoulders; (13) Stages of payment a)
30% of the rate will be paid on completion of
pre tamping attention, b) Balance 70% of the
rate will be paid on completion of post
tamping; (14) Recovery at the rate of twice
the applicable rate will be effected in case
contractor fails to carry out any of the
pre/during/post operation.
51 157010 Carrying out various miscellaneous works, for Shift 118.00 1552.01 183137.18
proper upkeep of crew rest van / rest room as
directed by machine in-charge of Track
Machines by providing a team of 2 labours for
12 hours shift, broadly mentioned hereunder:
(1) Bringing water from nearby source and
cleaning machine with water jet or any
suitable means; (2) Fuelling machine duly
bringing diesel / hydraulic oil from the stacked
drums; (3) Bringing water to staff rest van or
staff rest room, cleaning rest van / rest room,
cooking food for Track Machine staff or
bringing food from outside (cost of food shall
be borne by the staff concerned).; (4)
Guarding & watching machines, spare parts,
oils, grease etc. during day and night time at
all locations, wherever necessary, as
instructed by the machine in-charge; (5) In
case, contractor provides less no. of
Labour/Mate, payment will be deducted for
each such person @ 75% of the accepted item
SALEM DIVISION-ENGINEERING/SOUTHERN RLY
Quick cutting with abrasive rail cutter of all
types of rail sections including wear resistant,
head hardened rails up to 110 UTS, with
contractors tools & plants, equipment,
consumable with all lead & lift etc. complete
as directed by Engineer in-charge. Abrasive
Rail Cutter will be as per RDSO Specification
No. TM/SM/1 (Rev. 01 of 2012) with latest
status of RDSO; Rail Cutting Wheel Abrasive
Disc will be as per RDSO Specification
No.TM/SM/2 (Rev. 01 of 2020)
Drilling holes of 16 mm to 32 mm dia. with
Rail Drilling machine including chamfering
with appropriate chamfering tools in all types
of rail section with contractor's tools & plants,
equipment, consumable with all lead & lift etc.
complete, as directed by Engineer in-charge.
Rail Drilling Machine will be as per RDSO
Specification No. TM/SM/3, dated 24.04.1991.
57 161050 Drilling holes of specified size for bond holes Each 18292.00 53.93 986487.56
with 7.2mm dia drill twist to correct spacing
and location on 60kg/52kg rails on cess or
under traffic block with contractor's tools and
plant, equipment, consumable, labour etc
complete as directed by the Engineer in
charge at site.
Loading of rails of any section and length up
t o 1 3 metres in Wagons / Truck / trailer
including lead up to 50 metres and lift up to 5
58 171014 I n Wagon where mechanical handling is MT 1474.07 165.78 244371.32
possible and traffic block is not required or in
Loading of tongue rail, stock rail, switch
assembly and crossings of any section and
length, SEJ, Glued joint etc. with / without
P.Way fittings and fastenings, in Wagon /
Truck / trailer including lead up to 250 metre
and lift up to 5 metre.
59 171024 I n Wagon where mechanical handling is MT 1722.97 161.36 278018.44
possible and traffic block is not required or in
Loading, leading and unloading of 52Kg / 60Kg
rail up to 13 metre length by Railway's Rail
Dolly / Dip Lorry to the nominated location
under traffic with line protection in case road
carriage is not possible with different lead with
a lift up to 5 metre during block period.
Unloading of rails of any section and length up
to 13 metre, in neat manner for Railway usage
from departmental material train (DMT) or
contractor's / Railway's Truck/trailer including
lead up to 50 metre, lift up to 5 metre and
stacking in prescribed manner.
61 171053 From Wagon where mechanical handling is MT 1474.07 121.63 179291.13
possible and traffic block is not required or in
Truck / trailer.
SALEM DIVISION-ENGINEERING/SOUTHERN RLY
Loading of 52kg / 60kg PSC normal line and
special sleepers up to 2.75 metre length in
Depot / Station / Mid-section between stations
in a neat manner to departmental material
train (DMT) or contractor's / Railway's
Truck/Trailer with crane or any other means
including crossing of one track with free lead
up to 250 metre and lift up to 5 metre, if
required with contractor's labour, tools &
plants, machinery, consumables etc. Note: In
case of any damage to sleeper during loading,
penalty @ 50% of the all inclusive cost of
sleeper shall be levied.
62 172014 I n Wagon where mechanical handling is MT 2368.36 132.26 313239.29
possible and traffic block is not required or in
Truck / trailer
Loading of 52kg / 60kg PSC line and special
sleepers beyond 2.75 metre length including
existing fittings and fastenings in Depot /
Station / Mid-section between stations in a
neat manner to departmental material train
(DMT) or contractor's / Railway's Truck/trailer
with crane or any other means including
crossing of one track with free lead up to 250
metre and lift up to 5 metre, if required with
contractor's labour, tools & plants, machinery,
consumables etc. Note: In case of any damage
to sleeper during loading, penalty @ 50% of
the all inclusive cost of sleeper shall be levied.
63 172024 I n Wagon/Truck / trailer where mechanical MT 74.34 160.92 11962.79
handling is possible a n d traffic block is not
Loading, leading and unloading of PSC
Sleepers of 52Kg / 60Kg by Railway's Rail
Dolly/ Dip Lorry to the nominated location
under traffic in case road carriage is not
possible for different leads and lift up to 5
Loading, leading and unloading of all types of
P.Way fittings and all other miscellaneous
material except Rails, sleepers, switches,
crossings, SEJs and Glued Joints by road
vehicles for different leads. Note: Lead shall
be the shortest motorable road length
between the points of loading and unloading.
over item no. 172047
Transportation of Rails, sleepers, switches,
crossings, SEJs and Glued Joints by road
vehicles for different leads. Note: 1. Lead shall
be the shortest motorable road length
between the points of loading and unloading.
2. Loading and unloading shall be paid extra
under relevant items.
over item no. 172057
SALEM DIVISION-ENGINEERING/SOUTHERN RLY
Unloading of 52kg / 60kg PSC line and special
sleepers up to 2.75 metre length in Depot /
Station / Mid-section between stations in neat
manner for Railway usage from departmental
material train (DMT) or contractor's / Railway's
Truck/Trailer with crane or any other means
including crossing of one track and lead up to
250 metre & lift up to 5 metre with
contractor's labour, tools & plants, machinery,
consumables etc. Note: In case of any damage
to sleeper during loading, penalty @ 50% of
the all inclusive cost of sleeper shall be levied.
Unloading of 52kg / 60kg PSC special sleepers
beyond 2.75 metre length in Depot / Station /
Mid-section between stations in neat manner
for Railway usage from departmental material
train (DMT) or contractor's / Railway's
Truck/Trailer with crane or any other means
including crossing of one track and lead up to
50 metre & lift up to 5 metre with contractor's
labour, tools & plants, machinery,
consumables etc. Note: In case of any damage
to sleeper during loading, penalty @ 50% of
the all inclusive cost of sleeper shall be levied.
Unloading of Switches / Crossings / SEJ Rails /
Glued Joints of any rail section and length with
or without P.Way fittings & fastenings in neat
manner for Railway usage from departmental
material train (DMT) or contractor's / Railway's
Truck/Trailer with lead up to 250 metre & lift
up to 5 metres.
Collection, segregation and stacking of
various scattered P.Way materials at
nominated stacking location with serviceable
and un-serviceable ones separately within a
lead up to 500 metre and lift up to 5 metre
including crossing of track(s) wherever
necessary as directed by Engineer-in-Charge.
72 173031 Rails, switches, crossings, SEJ, Glued Joints, MT 1769.07 500.78 885914.87
Check Rails etc.
74 173033 P.Way fittings of all types and other similar MT 367.38 430.26 158068.92
75 202030 Manufacturing, supplying and fixing Curve Each 188.00 1181.15 222056.20
Indicator / Point Indicator / SEJ Boards to be
provided at various locations on formation,
made out of MS sheet 2mm thick of size
450mm x 300mm duly fixed with MS frame of
25mm x 25mm x 3mm angle welded to 50mm
x 50mm x 3mm MS angle, 1000mm long post
split and bent 100mm at bottom end with all
lead & lift as per specification and including
painting of details with enamel paint, as
directed by Engineer in-charge (Earthwork &
concreting will be paid separately)
Erection or removal of temporary Engineering
Indicator Board or any other board at
specified locations without causing
infringement to track etc. complete and as
SALEM DIVISION-ENGINEERING/SOUTHERN RLY
78 211180 Galvanisation of Railway's stretcher bars, MT 187.65 24335.57 4566569.71
M.S.Liners, ERCs and Plate screws by hot dip
process with Zinc Coating and mass of Zinc
coating shall not be less than 705 g/sqm and
galvanisation thickness shall not be less than
100 microns including necessary surface
preparation as per Clause-4 of IS:2629-1985.
Galvanisation shall be done as per IS:2629-
1985 and IS:4759-1996 with Zinc conforming
to IS:209-1992, duly taking all the measures
for safeguarding against embrittlement of hot-
dip galvanised iron and steel products as per
IS:6158-1984 with all contractor's labour,
material, tools, plant, all lead, lift and crossing
of tracks etc. complete and as directed by the
Engineer in-charge.
Hiring of machinery for minor miscellaneous
works for short duration including
operator/driver, fuel, lubricants and
consumable. The contractor shall arrange all
statutory permits as required by rules and
regulations prevailing in the area of work.
Payment shall be made for actual working
79 211201 JCB Backhoe Loaders 3DX Plus or similar with Hour 72.00 867.49 62459.28
minimum 1.10 cum bucket capacity
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
ANNEXUREIIIFORPOLICEVERIFICATION.pdf
ATTACHMENT
ACS112026_compressed.pdf
ATTACHMENT
NewFormatofBG.pdf
ATTACHMENT
ACS1to10.pdf
ATTACHMENT
RBCECEICTImplementationofContractoremb.pdf
ATTACHMENT
ANNEXUREVVAVIAVIB.pdf
ATTACHMENT
TrackStandardDocument20122022.pdf
ATTACHMENT
GCCApril2022NEW.pdf
ATTACHMENT
INSTRUCTIONSTOTHETENDERER.pdf
ATTACHMENT
ProcedureforLetterofCredit.pdf
ATTACHMENT
Workonhanddetails.pdf
ATTACHMENT
SafetyprecautionstobeadoptedwhileworkinginElectrifiedArea.pdf
ATTACHMENT
Splconditionsofcontractformovementofvehicle.pdf
ATTACHMENT
CheckListandNEFTform.pdf
ATTACHMENT
RlyBdletterClarificationofAnnexureV.pdf
ATTACHMENT
Download all tender documents and submit your bid