Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹80.0 LAccepted-AOC | L1 | Accepted-AOC AGREEMENT ACCEPTED | |
| 2 | L2₹81.9 L+₹1.3 L (1.66%)Rejected-Finance 302 88 F 15 EZHIL NAGAR 3RD STREET ARANTHANGI PUDUKKOTTAI 614616 | ARANTHANGI | PUDUKKOTTAI | TAMIL NADU | 614616 | L2 | Rejected-Finance SECOND LOWEST TENDERER FOR L2 | |
| 3 | Rejected-Technical | - | Rejected-Technical PRODUCED INSUFFICIENT DOCUMENTS |
| Sl No | Description | Qty | Unit | V.MEYYANATHAN L2 | Shivanagammai engineering contractors L3 | JOHN KENNADY L1 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work open excavation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the excavated earth with a lead of 10 mts. within the compound in places shown by the departmental officers and clearing and levelling the site, etc., complete complying with standard specification. | 889.5 | M3 | 105 ₹93,397.5 | 107 ₹95,176.5 | 103 ₹91,618.5 Lowest |
| 2.00 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification | 17 | M3 | 5,362 ₹91,154 | 5,467 ₹92,939 | 5,300 ₹90,100 Lowest |
| 3.00Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid) | ||||||
| 3.01 | For plane surfaces such as RCC floor slab, roof slab, beams, lintels, bed blocks, landing slab, waist slab, portico slabs and beams, etc. | 87.4 | m2 | 1,057 ₹92,381.8 | 1,078 ₹94,217.2 | 1,040 ₹90,896 Lowest |
| 3.02 | For plane surfaces such as vertical slab, side slabs of boxing, vertical drops, facia, vertical wall, etc. | 673.1 | M2 | 1,163 ₹7,82,815.3 | 1,186 ₹7,98,296.6 | 1,160 ₹7,80,796 Lowest |
| 4.00Providing and laying in position, Standardised Concrete Mix M-25 Grade in accordance with IS:456-2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cementcontent of 400 kg/m3 and maximum water cement ratio of 0.45, including admixture (plasticiser / superplasticiser) in recommended proportions as per IS:9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability with about (5.0 cu.m.) 7730 kg. of 20mm machine crushed stone jelly and with about (3.3 cu.m.) 5156 kg. of 10-12mm machine crushed stone jelly and with about (4.79 cu.m') 7670 kg. of crushed stone sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor/ roof slabs wherever necessary without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS Standards. (No separate payment will be made by the Department for the excess usage of materials).. | ||||||
| 4.01 | Foundation and Basement | 110 | M2 | 8,838 ₹9,72,180 | 9,012 ₹9,91,320 | 8,700 ₹9,57,000 Lowest |
| 5.00 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire) | 110 | Qtl | 9,400 ₹10,34,000 | 9,500 ₹10,45,000 | 9,200 ₹10,12,000 Lowest |
| 6.00Brick work in following Cement Mortar using best quality Fly ash bricks of size 23x11x7cm for foundation and basement including curing etc.,complete complying with standard specification. | ||||||
| 6.01 | Ground Floor | 12.3 | M3 | 7,606 ₹93,553.8 | 7,755 ₹95,386.5 | 7,500 ₹92,250 Lowest |
Tender Value
₹80.0 L
EMD Value
₹50,000
Closing Date
20 Feb 2025, 3:00 pmClosed
Superintending Engineer
Office of the Superintending Engineer, PWD., Building Construction and Maintenance Circle, Thanjavur-1
Construction of Sewage Treatment Plant 150KLD and 5 KLD ETP and Strengthening Existing Drainage System in District Head Quarters Hospital at Aranthangi in Pudukkottai District
2025_PWD_523253_1
25-03-2024-25
Open Tender
Civil Works - Buildings
Lump-sum
150 days
Aranthangi
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹50,000
27 Oct 2025
6 Feb 2025
21 Feb 2025
6 Feb 2025
20 Feb 2025
6 Feb 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .