| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.0 LAccepted-AOC | L1 | Accepted-AOC accepted | |
| 2 | L2₹20.2 L+₹17,896.85 (0.90%)Rejected-Finance | L2 | Rejected-Finance rejected |
| Sl No | Description | Qty | Unit | MR.JOHN BRITTO, CONTRACTOR L2 | MR.A.VIJAY ANANTH L1 |
|---|---|---|---|---|---|
| 1.00Construction of 60000 litre OHT(12m Staging Height) at KM Achampatti Village in Ariyanayagipuram Panchayat | |||||
| 2.00Earthwork excavation and depositing on bank with an initial lead of 10m and lift of 2m in the following classification of soils as directed by TWAD Board officers. Hard stiff clay, block cotton, hard red earth shales, murram, ordinary gravel, stoney earth | |||||
| 3.00 | First depth of 2m | 59.47 | cum | 300 ₹17,841 | 263 ₹15,640.61 Lowest |
| 4.00 | 2 nd Depth | 10.21 | cum | 300 ₹3,063 | 276 ₹2,817.96 Lowest |
| 5.00 | Sand filling for foundation with clear M sand including cost of sand watering, ramming and consolidation etc complete as directed by TWAD Board officers. | 2.92 | cum | 2,100 ₹6,132 | 2,035 ₹5,942.2 Lowest |
| 6.00 | Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete as directed by TWAD Board officers. | 4.37 | cum | 5,450 ₹23,816.5 | 5,406 ₹23,624.22 Lowest |
| 7.00Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum. | |||||
| 8.00 | For footing below G.L. ( 1,50 to 4,50 below GL ) | 10.53 | cum | 9,200 ₹96,876 | 9,157 ₹96,423.21 Lowest |
| 9.00 | For Column and Brace upto G.L ( 0 to1,50 below GL ) | 2.65 | cum | 9,050 ₹23,982.5 | 9,018 ₹23,897.7 Lowest |
| 10.00 | For column and brace I 0 to 4.5m from GL | 4.11 | cum | 9,200 ₹37,812 | 9,159 ₹37,643.49 Lowest |
Tender Value
₹24 L
EMD Value
₹24,000
Closing Date
12 Nov 2025, 4:00 pmClosed
THE BLOCK DEVELOPMENT OFFICER SANKARANKOVIL
THE BLOCK DEVELOPMENT OFFICE SANKARANKOVIL
CONSTRUCTION OF 60000LIT OHT AT KM ACHAMPATTI VILLAGE OF ARIYANAYAGIPURAM PANCHAYAT IN SANKARANKOVIL BLOCK
2025_RDTN_596616_7
COLRD/2024/2025-A3
Open Tender
Civil Works - Buildings
Works
sankarankovil
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹24,000
Yes
SANKARANKOVIL
16 Dec 2025
3 Nov 2025
12 Nov 2025
3 Nov 2025
12 Nov 2025
3 Nov 2025
3 Nov 2025
Amount
Construction of 60000 litre OHT(12m Staging Height) at KM Achampatti Village in Ariyanayagipuram Panchayat
Earthwork excavation and depositing on bank with an initial lead of 10m and lift of 2m in the following classification of soils as directed by TWAD Board officers. Hard stiff clay, block cotton, hard red earth shales, murram, ordinary gravel, stoney earth
First depth of 2m
2 nd Depth
Sand filling for foundation with clear M sand including cost of sand watering, ramming and consolidation etc complete as directed by TWAD Board officers.
Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete as directed by TWAD Board officers.
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum.
For footing below G.L. ( 1,50 to 4,50 below GL )
For Column and Brace upto G.L ( 0 to1,50 below GL )
For column and brace I 0 to 4.5m from GL
For column and brace II 4.5m to 7.32m from GL
For column and brace III 7.32 to 10.98m from GL
For column beam floor slab side wall from 10.98m to 14.64 m from GL
For side wall, hance and Roof slab from 14.64 m to 18.30 m from GL
Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding
PLANE SURFACES
Below GL
For column footing and GL Brace
GL 0 to 3.30 M
For Brace I
For Brace II
For Brace III
Roof slab
For Floor Beam and Bottm of Floor slab
CURVED SURFACE
For Side Wall, & Floor slab sides and Haunch
For Side Wall, Roof Slab sides
SQUARE COLUMN
For column Below GL
For column GL 0 to 3.30M
For column ( 3.31m to 4.30m ).
For column ( 4.31m to 5.30m).
For Column (5.31m to 6.30m )
For Column (6.31m to 7.30m )
For Column (7.31m to 8.30m )
For Column (8.31m to 9.30m )
For Column (9.31m to 10.30m )
For Column (10.31m to 11.30m )
For Column (11.30m to 11.31m )
Exterior Emulsion painting two coats with best approved quality and colour paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete.
Supplying, fabricating and placing in position of HSD steel rods for Reinforcement including the cost of steel and binding wire etc., complete and as directed by Deparment officers.
Refilling the foundation with excavated earth including consolidation as directed by the TWAD Board officers.
Providing MS Ladder & Hand rails arrangements in 60,000 Lits. Capacity OHT With 12.00m Staging Height.
Providing and fixing of RCC inner access ladder in RCC 1:1.5:3 (one cement, one and half sane! and three aggregates) using 20mm HBG stone for OHT including cost of reinforcement, placing grill in position, centering shuttering charges, mixing concrete cur
Providing GI ventilating arrangements mosquito proof nylon net with 50 mm GI pipes and cowl and as directed by Deparment officers
Providing manhole cover of size 1x1 0.75 X 0.75 M in RCC 1: 1.5:3 with suitable reinforcement and 5O x 5O x 6mm MS angle fixed along edges and as directed by Department officers. SFRC
Supply & Delivery of following Pipes and specials for OHT connection
Supply of GI Pipes for OHT Connections 65 mm dia
65mm Ø GI Elbow
65mm Ø GI coupling
65mm Ø GI Flange Set
65mm Ø GM Gate valve
Provision for Rainwater harvesting Structure and Platform
Earth work excavation in all clauses of soils with initial lead and lift except hard rock requiring blasting etc., complete for foundation as per SS 20B.
For first depth of 2m
For Core wall
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete
Brick work in CM 1:5 mix using third class country bricks of size 8 3/4 x 4 1/4 x 2 3/4 including all cost and conveyance of materials and labour charges etc., complete
Plastering with CM 1:5 mix using to 12mm thick including all cost and conveyance of all materials and all labour charges etc., complete.
Collection and supply of 40mm HBG metal and filling in to the recharge pits including cost and conveyance to the site and all labour charges for filling as per standard specifications.
Cement concrete 1:2:4 mix using 20mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete
DISTRIBUTION SYSTEM
Supply and Delivery of 75mm PVC Pipes 4Ksc
Supply and Delivery of 65mm GM Gate Valve
Earth work excavation with an initial lead and lift in hard stiff clay, black cotton, hard red earth, sub murram gravel, stone and earth mixed boulders as per SS20B for pipe laying work.
Refilling the excavated portions for Pipe Laying works with excavated earth as per ss20 B etc., complete.
Labour charges for Laying of GI, PVC rigid pipes with lead of 200m lowering into trench, laying in proper grade, alignment, jointing PVC coupler with specials and tested to the required pressure including conveyance of water upto 1km lead during the testi
75mm PVC Pipes 4Ksc
MR.JOHN BRITTO, CONTRACTOR (BID ID -1510286)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_740645.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Document
1.45 MB
Tender Documents
Tender Documents • 0.48 MB
BOQ
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .