Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.0 LAccepted-Finance | ₹17.0 L | L1 | Accepted-Finance OK |
| 2 | L2₹17.4 L+₹48,196 (2.84%)Accepted-Finance | ₹17.4 L+₹48,196 (2.84%) | L2 | Accepted-Finance OK |
| 3 | L3₹19.8 L+₹2.8 L (16.8%)Accepted-Finance | ₹19.8 L+₹2.8 L (16.8%) | L3 | Accepted-Finance OK |
| 4 | L4₹20.1 L+₹3.1 L (18.4%)Accepted-Finance | ₹20.1 L+₹3.1 L (18.4%) | L4 | Accepted-Finance OK |
| 5 | Rejected-Technical | - | - | Rejected-Technical not ok |
| Sl No | Description | Qty | Unit | DEEPAK KUMAR L3 | M.S. SAROJ ENTERPRISE L4 | M/S SATTYAM CONTRACTORS L1 | M K TRADERS L2 |
|---|---|---|---|---|---|---|---|
| 1.00Providing/Supply and erection of the Following Decentralised Material by Contractor with all the Accessories to the site. Erection should be complete at site with all respect.(as per resspo norms), | |||||||
| 1.01 | LT Shackle Insulator | 22 | No. | 100 ₹2,200 | 200 ₹4,400 | 450 ₹9,900 | 60 ₹1,320 Lowest |
| 1.02 | Bolt & Nut For Shackle Insulator | 10 | Kg. | 100 ₹1,000 Lowest | 200 ₹2,000 | 180 ₹1,800 | 200 ₹2,000 |
| 1.03 | Concreating Of Pole | 35 | No. | 190 ₹6,650 Lowest | 200 ₹7,000 | 950 ₹33,250 | 1,500 ₹52,500 |
| 1.04 | Dead and clamp | 2 | No. | 190 ₹380 Lowest | 200 ₹400 | 350 ₹700 | 200 ₹400 |
| 1.05 | LT peircing connector for 95 sqmm | 12 | No. | 50 ₹600 Lowest | 100 ₹1,200 | 350 ₹4,200 | 200 ₹2,400 |
| 1.06 | HOLDING CLAMP | 268 | No. | 190 ₹50,920 Lowest | 200 ₹53,600 | 280 ₹75,040 | 250 ₹67,000 |
| 1.07 | STAY COMPLETE | 7 | No. | 790 ₹5,530 | 1,000 ₹7,000 | 650 ₹4,550 Lowest | 1,500 ₹10,500 |
| 1.08 | PRC | 1,152 | No. | 90 ₹1,03,680 Lowest | 100 ₹1,15,200 | 135 ₹1,55,520 | 250 ₹2,88,000 |
| 1.09 | Suspension clamp with I hook | 212 | No. | 125 ₹26,500 Lowest | 150 ₹31,800 | 350 ₹74,200 | 250 ₹53,000 |
Tender Value
₹20.5 L
EMD Value
₹21,000
Closing Date
11 Jun 2026, 10:00 amClosed
SE EDC Dhampur
SE EDC Dhampur
strengthening of LT lines in EDD Dhampur Under BP 2026-27
2026_PVVNL_1154150_1
13/2026-27
Open Tender
Electrical Works
Item Rate
90 days
EDC Dhampur
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,540
Yes
SE EDC Dhampur
₹21,000
Yes
20 Jun 2026
26 May 2026
11 Jun 2026
26 May 2026
11 Jun 2026
26 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Providing/Supply and erection of the Following Decentralised Material by Contractor with all the Accessories to the site. Erection should be complete at site with all respect.(as per resspo norms), | |||||
| 1.01 | LT Shackle Insulator | 22 | No. | - | - |
| 1.02 | Bolt & Nut For Shackle Insulator | 10 | Kg. | - | - |
| 1.03 | Concreating Of Pole | 35 | No. | - | - |
| 1.04 | Dead and clamp | 2 | No. | - | - |
| 1.05 | LT peircing connector for 95 sqmm | 12 | No. | - | - |
| 1.06 | HOLDING CLAMP | 268 | No. | - | - |
| 1.07 | STAY COMPLETE | 7 | No. | - | - |
| 1.08 | PRC | 1,152 | No. | - | - |
| 1.09 | Suspension clamp with I hook | 212 | No. | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.65 MB
TDoc13.pdf
Tender Documents • 1.44 MB
BOQ_2161964.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .