Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.8 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹12.8 L+₹2,230 (0.17%)Rejected-AOC | L2 | Rejected-AOC L2 |
Tender Value
₹12.8 L
EMD Value
₹12,800
Closing Date
19 Sept 2024, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
BDO VP Vallam
Vallam
TNVPM/VLM/IDPHIS/2024-25/Pack4
2024_RDTN_482347_1
TNVPM/VLM/IDPHIS/2024-25/Pack4
Open Tender
Civil Works
Works
60 days
Vallam
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹12,800
Yes
9 Oct 2024
9 Sept 2024
19 Sept 2024
9 Sept 2024
19 Sept 2024
9 Sept 2024
Amount
1)STRENGTHENING THE ROAD FROM BURIAL GROUND ROAD IN KADAMBUR 0/0-0/210
Clearing the scrub jungles including all labour charges for all labour charges etc complete.
Laying US GRAVEL including cost and conveyance and stacking at site to departmental gauge for taking pre measurements by departmental officers and including labour charges for spreading the gravel as per standard specification etc. complete.
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all
Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat 'A' over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in Central Hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com. Km 0/0 - 0/210
Provision for labour welfare fund 1.00%
Provision for Photographic Charges
Condegencies charges & PS charges
2)CONSTRUCTION OF COMPOUND WALL @ADHI THIRAVIDAR BURIAL GROUND 50M IN KADAMBUR PANCHAYAT
Earthwork excavation in Hard Gravelly Soil with initial lead and depositing on bank as per ss20B for narrow excavation for foundation.
Filling the Basement and Foundation with good River Sand including cost and conveyance of all materials etc.
Cement Concrete 1:4:8 mix using 40mm ISS HBG Metal including cost and conveyance of all materials to site labour for laying curing etc.
RCC 1:11/2:3mix using 20mm ISS HBG Metal including cost and conveyance of all materials to site labour for laying curing etc.
Brick work in C.M. 1:5 mix using Country Bricks including cost and conveyance of all materials to site labour for laying curing etc.
Centring charges for soffits of RCC slab or plain surface including cost and conveyance of planks and posts etc for strutting.
Supplying and fabrication of Steel including cost and conveyance of steel and binding wire and labour charges for cutting, bending and tying in position etc.
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc complete.
Colour Washing two coats with Emulsion paint including cost and conveyance of all materials to site labour charges etc.
Provition for LWF 1%
Providing Photographic charges
Providing Name Board including painting and lettering
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
R Anbarasu (BID ID -1139976)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .