Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹84.4 L
EMD Value
₹1.5 L
Closing Date
9 Nov 2026, 6:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
CWE Panagarh
HQ CWE PANAGARH, MES, PO-PANAGARH, DIST-BURDWAN, WB, PIN-713420
SPECIAL REPAIRS OF ROAD FROM DRDO GATE TO FAD GATE AT PMS UNDER GE PANAGARH
2026_MES_793313_1
8300-102/E8
Open Tender
Civil Works - Roads
Item Rate
Panagarh
Please refer tender documents
7 documents required · 7 mandatory
₹1,000
GE PANAGARH
₹1.5 L
Yes
10 Oct 2026
10 Oct 2026
17 Nov 2026
10 Oct 2026
9 Nov 2026
1 Nov 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Scarifying or picking gravelled, macadam or bituminous macadam surfaces in area not exceeding 400 sqm, depth exceeding 50mm and not. exc 100mm deep (Scarifying include racking over and grading the broken up surface to the proper camber etc. as required) and rolling and consolidating formation surfaces in filling by power roller exc 8 tonne & n exc 12 tonne capacity to required gradient and camber, complete all as specified and directed.
[Note: Arrangement for removal of scarified materials immediately after execution shall be done by the bidder being credited to him.] | 185.2 | 10 Sqm | 100 | ₹18,520 |
| 2 | Excavating over areas in soft/loose soil, not exceeding 1.50 m deep and getting out for road work to required slope, gradient, camber & super elevation, complete all as specified and directed. | 911.5 | Cum | 100 | ₹91,150 |
| 3 | Removing excavated material of soil n. exc 50m and depositing where directed, complete all as specified and directed. | 911.5 | Cum | 10 | ₹9,115 |
| 4 | Rolling and consolidation formation surfaces in cutting rolled with 8 to 12 tonne power roller and consolidated to required gradient and camber, complete all as specified and directed. | 91.15 | 10 Sqm | 10 | ₹911.5 |
| 5 | M&L nearly 600mm thick in each layer of each 100mm thick in pavings with mix of fly ash, clinker & stone dust in proportion of 1:3:6 (i.e. 10% fly ash, 30% clinker and 60% stone dust) laid in layers incl watering ramming and compacted with vibratory / power roller of 8 to 12 tonne capacity at required camber and gradient to get min 95% proctor density complete all as specified and directed.
[Note: (i) Rate shall be quoted by the bidders for full thickness and measured as one composite layer after rolling.
(ii) Test report of Proctor Density of compacted soil shall be submitted for claiming of payment.
(iii) Road Roller Register shall be prepared to keep record of rolling hours and shall be submitted before claiming payment.
(iv) Stack measurement shall be entered in MB of fly ash, klinker and stone dust separately.
(v) All test report charges included in quoted rate. No extra claim shall be entertained later on. Bidder shall note these aspect while quoting the bid.] | 572.25 | Cum | 10 | ₹5,722.5 |
| 6 | M&L SOLING (or Sub base) of 150mm thick spread thickness with broken boulders or quarried stone (size not exceeeding 150mm in any direction in length, width or height) interstices filled surface formed and rolled and consolidated with 8 to 12 tonne power roller to required gradient and camber complete all as specified and directed. | 91.15 | 10 Sqm | 11 | ₹1,002.65 |
| 7 | M&L, laying and compacting total 150mm compacted thickness (laid in two layers of 75mm thick each) Wet Mix Macadam (WMM) grading as per table 400-12 & 400-13 of MoRTH specifications for Road and Bridge Works 2013 manufactured in WMM plant, material comprising of clean, crushed, graded aggregate and granular material premixed with water to a dense mass, spreading with sensor paver and rolling with vibratory roller of capacity 8 to 12 tonne static weight till the density acheived at least 98% of the maximum dry density for the materialsa as as determined by the method outlined in IS: 2720 (Part-8) and consolidating to required gradient and camber, complete all as specified and directed.
[Note: (i) The finished surface tolerances to be as per Table 900-1 of MoRTH specifications for Road and Bridge Works 2013.
(ii) Raw materials for work shall exclusively prepared for laying by latest calibrated WMM Plant. Valid Calibration Certificate of WMM Plant to be submitted to Engr-in-Charge before execution of work. No manual mixing of coarse aggregate are allowed.
(iii) Lorry no & qty brought at site of WMM materials shall be entered in MB as "Not to be abstracted" before execution of work.
(iv) Approved certificate of mixing properties & proportion of qty of WMM materials, Calibration Certificate of WMM Plant shall be obtained from GE before execution of work.
(v) Unit rate quoted by bidder shall inclusive testing charges as above & as per MoRTH & no extra claim against testing charges shall be entertained later on.] | 91.15 | 10 Sqm | 11 | ₹1,002.65 |
| 8 | Preparation of unsurfaced Water Bound Macadam (WBM)/ Wet Mix Macadam (WMM) surfaces by brushing with wire brushes for removing caked mud, sweeping with brooms and finally fanning the cleaned surface with gunny bags to remove all loose dust or dirt etc., complete all as specified and directed. | 68.95 | 10 Sqm | - | - |
| 9 | M&L & applying evenly a prime coat of Cationic Bitumen emulsion SS-1 conforming to IS: 8887 at a rate of application of 0.7-1.0 kg/sqm on surface of WMM/WBM as specified in Table 500-3 of MoRTH specification for Road and Bridge Works 2013, using mechanical sprayer after cleaning of existing surface, complete all as specified and directed. | 254.15 | 10 Sqm | 100 | ₹25,415 |
| 10 | M&L premixed bituminous macadam over primed surface of road using paving bitumen VG-30 & temperature as per table 500-1 & 500-2 of MoRTH & as per IS: 73, laid/rolled by 8 to 10 tonne capacity roller and compacted to required gradient and camber (consolidated thickness 75 mm or less) including preparation of area before laying of Macadam with mechanical paver, binder contents of premixed macadam shall be 4% by weight of total mix (Design Mix), complete all as specified and directed.
[Note: (i) Work shall be executed after approval of design mix of bituminous macadam by GE.
(ii) Calibration of Hot Mix Plant shall be submitted to Engr-in-Charge for approval.
(iii) Payment shall be made to Contractor after submission of approved design mix, bitumen extraction report, Road Roller register & calibration report.
(iv) Exact qty of binder to be used shall be ascertained by Design Mix.
(v) Minimum 4% binder shall be used. However, in case more than 4% of binder content is required as per design mix, the same shall be provided by the contractor at no extra cost to dept
(vi) Course aggregate's physical property as per MoRTH table 500-6 & mixing of all aggregates as per table 500-7 of MoRTH.
(vii) Unit rate quoted by bidder shall inclusive testing charges as above & as per MoRTH & no extra claim against testing charges shall be entertained later on.] | 190.61 | Cum | 100 | ₹19,061 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.58 MB
Tender_8300-102.pdf
Tender Documents • 0.84 MB
BOQ_889640.xls
BOQ • 0.55 MB
SitePlan_102.pdf
Additional Documents • 0.54 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .