Tender ID
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹18.2 LAccepted-AOC | 1 | Accepted-AOC The lowest rate quoted by the contractor SAKTHI PRABAKARAN | |
| 2 | 2₹19.7 L+₹1.5 L (8.43%)Rejected-Finance | 2 | Rejected-Finance Admitted | |
| 3 | 3₹20.8 L+₹2.6 L (14.4%)Rejected-Finance | 3 | Rejected-Finance Admitted | |
| 4 | 4₹21.1 L+₹2.9 L (15.9%)Rejected-Finance | 4 | Rejected-Finance Admitted |
| Sl No | Description | Qty | Unit | M.MURUGAN L3 | SAKTHI PRABAKARAN L1 | M/S.REVATHY CONSTRUCTIONS L2 | AMP ELECTRICALS L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | Open well earth work open well excavation complying with relevant clauses of T.N.D.S.S. Well sinking and with lead upto 10 metre in Hard stiff clay, stiff black coton soil, hard red earth, shales, murram, gravel, toney earth and earth mixed with small size boulders and hard gravely soil - First depth of 2 metre | 189.97 | cum | 131 ₹24,886.07 | 130 ₹24,696.1 | 123.8 ₹23,517.34 Lowest | 140 ₹26,595.8 |
| 2.00 | Open well excavation in soft disintegrated rock complying not requiring blasting with standard specification. second depth 2.00-4.00 | 189.97 | cum | 405 ₹76,937.85 | 400 ₹75,988 | 382.73 ₹72,706.27 Lowest | 441 ₹83,776.77 |
| 3.00 | Open well excavation in DMR not requiring blasting soil copmlying with standard specification. third depth 4.00-6.00 | 189.97 | cum | 978 ₹1,85,790.66 | 900 ₹1,70,973 Lowest | 924.21 ₹1,75,572.17 | 980 ₹1,86,170.6 |
| 4.00 | Open well excavation in DMR requiring blasting soil copmlying with standard specification. Fourth depth 6.00-8.00 | 56.52 | cum | 1,951 ₹1,10,270.52 | 1,500 ₹84,780 Lowest | 1,843.69 ₹1,04,205.64 | 2,000 ₹1,13,040 |
| 5.00 | Open well excavation in hard rock requiring blasting complying with standard specification Fifth depth 8.00-10.00 | 47.49 | cum | 4,780 ₹2,27,002.2 | 4,000 ₹1,89,960 Lowest | 4,517.1 ₹2,14,517.08 | 4,900 ₹2,32,701 |
| 6.00 | Open well excavation in hard rock requiring blasting complying with standard specification Sixth depth 10.00-12.00 | 35.33 | cum | 5,736 ₹2,02,652.88 | 5,000 ₹1,76,650 Lowest | 5,420.52 ₹1,91,506.97 | 5,800 ₹2,04,914 |
| 7.00 | CC 1:4;8 mix using 40mm HBG metal including cost and conveyance and all other labor charges | 2.3 | cum | 5,344 ₹12,291.2 | 5,300 ₹12,190 | 5,050.08 ₹11,615.18 Lowest | 5,400 ₹12,420 |
| 8.00 | RCC 1:1:5:3 mix using 20mm HBG metal including cost and conveyance and all other labor charges | 53.05 | cum | 9,066 ₹4,80,951.3 | 8,000 ₹4,24,400 Lowest | 8,567.37 ₹4,54,498.98 | 9,100 ₹4,82,755 |
| 9.00 | Providing centering for all RCC item of including cost and conveyance and all other labour charges | 390.2 | sqm | 547 ₹2,13,439.4 | 500 ₹1,95,100 Lowest | 516.91 ₹2,01,700.23 | 550 ₹2,14,610 |
| 10.00 | supply and fabrication of including cost and conveyance an all other labour charges | 1.5 | mt | 91,858 ₹1,37,787 | 80,000 ₹1,20,000 Lowest | 86,805.81 ₹1,30,208.71 | 92,000 ₹1,38,000 |
Tender Value
₹21 L
EMD Value
₹21,000
Closing Date
18 Feb 2026, 3:00 pmClosed
Block Development Officer BP Acharapakkam
Block Development Office BP Acharapakkam
Construction of Openwell with Motor to Kaliyakunnam village at Siruperpondi Panchayat in Acharapakkam Panchayat Union in Chengalpattu District under SFC- District Panchayat (General Fund) 2025-26
2026_RDTN_655942_1
DIPR/181/2025 A2 dt 10.02.2026
Open Tender
Civil Construction Goods
Item Rate
180 days
Siruperpondi
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹21,000
Yes
7 Mar 2026
12 Feb 2026
18 Feb 2026
12 Feb 2026
18 Feb 2026
12 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Open well earth work open well excavation complying with relevant clauses of T.N.D.S.S. Well sinking and with lead upto 10 metre in Hard stiff clay, stiff black coton soil, hard red earth, shales, murram, gravel, toney earth and earth mixed with small size boulders and hard gravely soil - First depth of 2 metre | 1 | cum | - | - |
| 2 | Open well excavation in soft disintegrated rock complying not requiring blasting with standard specification. second depth 2.00-4.00 | 1 | cum | - | - |
| 3 | Open well excavation in DMR not requiring blasting soil copmlying with standard specification. third depth 4.00-6.00 | 1 | cum | - | - |
| 4 | Open well excavation in DMR requiring blasting soil copmlying with standard specification. Fourth depth 6.00-8.00 | - | cum | - | - |
| 5 | Open well excavation in hard rock requiring blasting complying with standard specification Fifth depth 8.00-10.00 | - | cum | - | - |
| 6 | Open well excavation in hard rock requiring blasting complying with standard specification Sixth depth 10.00-12.00 | 1 | cum | - | - |
| 7 | CC 1:4;8 mix using 40mm HBG metal including cost and conveyance and all other labor charges | 1 | cum | - | - |
| 8 | RCC 1:1:5:3 mix using 20mm HBG metal including cost and conveyance and all other labor charges | 1 | cum | - | - |
| 9 | Providing centering for all RCC item of including cost and conveyance and all other labour charges | 1 | sqm | - | - |
| 10 | supply and fabrication of including cost and conveyance an all other labour charges | - | mt | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_786567.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.57 MB
Technical.pdf
Tender Documents • 1.22 MB
BOQ_786567.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .