| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAccepted-AOC | ₹1.5 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.9 Cr+₹41.7 L (27.3%)Rejected-AOC | ₹1.9 Cr+₹41.7 L (27.3%) | L2 | Rejected-AOC L2 |
| 3 | L3₹2.0 Cr+₹44.6 L (29.3%)Rejected-AOC | ₹2.0 Cr+₹44.6 L (29.3%) | L3 | Rejected-AOC L3 |
| 4 | L4₹2.1 Cr+₹54.5 L (35.7%)Rejected-AOC | ₹2.1 Cr+₹54.5 L (35.7%) | L4 | Rejected-AOC L4 |
| 5 | L5₹2.2 Cr+₹62.6 L (41.0%)Rejected-AOC CHANDAULI | UTTAR PRADESH | 221009 | ₹2.2 Cr+₹62.6 L (41.0%) | L5 | Rejected-AOC L5 |
Tender Value
Refer Docs
EMD Value
₹5.1 L
Closing Date
1 Nov 2022, 5:00 pmClosed
Superintending Engineer
Superintending Engineer Gandak Flood Circle Basti
Construction of Balance work between km 17.100 to km 17.400, km 17.760 to km 18.800, km 21.000 to km 22.000 and km 23.500 to km 24.200 and Construction of Double Barrel Regulator at km 17.300 at Bhojpur-Shahpur Bund on Left Bank of River Rapti in Dis
2022_UPIDC_742060_12
02/SE/2022-23
Open Tender
Civil Works
Item Wise
60 days
Siddharthnagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹8,614
₹5.1 L
Yes
Superintending Engineer Gandak Flood Circle Basti
21 Jan 2023
25 Oct 2022
2 Nov 2022
25 Oct 2022
1 Nov 2022
25 Oct 2022
25 Oct 2022
Amount
E/w in filling for Construction of bund between km. 17.100 km. 17.400, km. 17.760, km. 18.800, km. 21.200, km. 22.000 and km. 23.500, km. 24.200 of bhojpur-shahpur bund including all lead, lift in all type of soil with labour t&p etc.
Earth Work in excavation of foundation including all lead & lift, labour T&P etc. complete.
C.C. 1:4:8 with Dalla grit 20-40 mm & Chopan Sand including all cost of material, labour T& P etc Complete.
1st Class B.W. 1:4 C.M. with Chopan Sand including all cost of material, labour T& P etc Complete.
Steel in reinforcement including all cost of material, labour cutting bending and bindibg T& P etc Complete.
Centering & Shuttering for R B. work including all cost of material, labour T& P etc Complete.
1st class R.B work 1:3 C.M. including all cost of material, labour T& P etc Complete.but excluding cost of reinforcement .
CC. 1:2:4 with Dalla 10-20 mm grit & Chopan Sand including all cost of material, labour T& P etc Complete.
Cement pointing 1:2 C.M. including all cost of material, labour T& P etc Complete.
Cement Plaster 1:3 C.M. including all cost of material, labour T& P etc Complete.
Supplying and laying coarse sand in filter including all cost of material, loading , carriage, un loading, Royalty, labour T&P etc complete.
Supplying and laying 10-20 mm stone grit in filter in filter including all cost of material, loading , carriage, un loading, Royalty, labour T&P etc complete.
Supplying and laying 20-40 mm stone grit in filter including all cost of material, loading , carriage, un loading, Royalty, labour T&P etc complete.
Centering & Shuttering for C.C. blocks. including all cost of material, labour T& P etc Complete.
C.C. 1:3:6 in Blocks with Dalla grit 10-20 mm & Chopan Sand including all cost of material, labour T& P etc Complete.
Supplying & Laying Jhanwa Brick in Apron including all cost of material, loading , carriage, un loading, Royalty, labour T&P etc complete.
Supplying & Fixing & flapper gate 1700mm dia including all cost of material, labour T& P etc Complete.
Making Temp. Hutment.
M/S ASHISH KUMAR PANDEY
M/S BHOLU CONSTRUCTION COMPANY
M/s Prakash And Pratap Associates
ARVIND KUMAR SINGH
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .