Tender Value
₹36.5 Cr
EMD Value
₹73.1 L
Closing Date
3 Sept 2026, 12:00 pm
Yes (up to 3 members)
No
Two Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
90 days
Expenditure
Capital (Works)
Above/Below/Par
WORKS
13 conditions · 2 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet. Important Note :- For Detail Regarding Financial Eligibility Criteria, Please visit Please visit Para No 2.2, TENDERER'S CREDENTIALS & ELIGIBILITY CRITERIA of Instructions to tenderer & conditions of contract Chapter of Approved Tender Document.
Technical Eligibility Criteria: The tenderer must have successfully completed or substantially completed any of the following during last 07(seven) years, ending last day of month previous to the one in which tender is invited: Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, OR Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, OR One similar work each costing not less than the amount equal to 60% of advertised value of the tender. Note:-Work experience certificate from private individual shall not be considered. However, in addition to work experience certificates issued by any Govt. Organization, work experience certificate issued by Public listed company having average annual turnover of Rs 500 crore and above in last 3 financial years excluding the current financial year, listed on National Stock Exchange or Bombay Stock Exchange, incorporated/registered at least 5 years prior to the date of closing of tender, shall also be considered provided the work experience certificatehas been issued by a person authorized by the Public listed company to issue such certificates. In case tenderer submits work experience certificate issued by public listed company, the tenderer shall also submit along with work experience certificate, the relevant copy of work order, bill of quantities, bill wise details of payment received duly certified by Chartered Accountant, TDS certificates for all payments received and copy of final/last bill paid by company in support of above work experience certificate. The similar work mean having experience of the following types of works -"Design, Supply, Erection, Testing & Commissioning of EHV (110 kV or above voltage) Transmission Line.The conditions for the subject work are: a). Bidders should be either manufacturer or should have valid authorization by manufacturer for supply of High-Performance Conductor (HPC) at the time of bid submission.b). Bidders have to submit Guarantee Technical Particulars (GTP) of offered Conductor along with the offer for complying the requirements of the conductors mentioned in the Annexure-A.c). Bidders should have specific tools and plants, machineries for High Performance Conductor required for transmission line stringing work, the list of the same shall be submitted by bidders." Important Note:-For Annexure-A & Detail Regarding Technical Eligibility Criteria, Please visit Para No 2.2, TENDERER'S CREDENTIALS & ELIGIBILITY CRITERIA of Instructions to tenderer & conditions of contract Chapter of Approved Tender Document."
25 conditions · 19 needing a document upload
As mentioned in the Tender Document No.PUNE_ELECT_TRD_2025_18R1.
Bid Capacity:-The tender/technical bid will be evaluated based on bid capacity formula detailed as Annexure-VI of tender document. If not submitted along with the technical bid, bid will be summarily rejected.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
As mentioned in the Tender Document No.PUNE_ELECT_TRD_2025_18R1.
Augmentation of existing 3 Phase 110 KV transmission line SE-I & SE-II between Lonavla to Talegaon section & Provision of 1 nos. line sectioning Equipment (LSE) for 110KV transmission line, in SE-1 & SE-2 feeders between KK-LNL of Pune Division Central Railway.
PUNE_ELECT_TRD_2025_18R1~CR
PUNE_ELECT_TRD_2025_18R1
Open
Works - General
24 Months
Pune, Maharashtra
₹0
₹73.1 L
3 Aug 2026
3 Aug 2026
20 Aug 2026
308 items across 3 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | 1.00 | Lumpsum 238434.92 | — | ||
| Check Survey | — | — | — | 2,38,434.92 | |
| — | 1.00 | Lumpsum 710914.29 | — | ||
| Preparation of design & drawing | — | — | — | 7,10,914.29 | |
| — | 174.00 | — | — | ||
| Supply of single conductor (HTLS) | — | — | — | 15,21,35,923.86 | |
| — | 58.00 | — | — | ||
| Erection of single circuit 3 phase conductor (HTLS) | — | — | — | 2,09,83,603.66 | |
| — | 531.00 | — | — | ||
| Supply of SSN Hardware : ("Hardware & accessories suitable for HTLS conductor at item.No.2, Erection cost included in item.No.3") | — | — | — | 95,71,386.51 | |
| — | 252.00 | — | — | ||
| Supply of DSN Hardware:("Hardware & accessories suitable for HTLS conductor at item.No.2, Erection cost included in item.No.3" ) | — | — | — | 47,85,464.88 | |
| — | 261.00 | — | — | ||
| Supply of STN Hardware:("Hardware & accessories suitable for HTLS conductor at item.No.2, Erection cost included in item.No.3") | — | — | — | 2,53,62,711.54 | |
| — | 210.00 | — | — | ||
| Supply of DTN Hardware :("Hardware & accessories suitable for HTLS conductor at item.No.2, Erection cost included in item.No.3" ) | — | — | — | 2,55,66,147.6 | |
| — | 20.00 | — | — | ||
| Supply of Mid span joint :("Hardware & accessories suitable for HTLS conductor at item.No.2, Erection cost included in item.No.3") | — | — | — | 24,98,231 | |
| — | 20.00 | — | — | ||
| Supply of Repair Sleeve:("Hardware & accessories suitable for HTLS conductor at item.No.2, Erection cost included in item.No.3") | — | — | — | 2,84,137.4 | |
| — | 586.00 | — | — | ||
| Supply of PA Rods Suspension clamp:("Hardware & accessories suitable for HTLS conductor at item.No.2, Erection cost included in item.No.3") | — | — | — | 13,55,716.86 | |
| — | 1776.00 | — | — | ||
| Supply of PA Rods Vibration Dampers:("Hardware & accessories suitable for HTLS conductor at item.No.2, Erection cost included in item.No.3.") | — | — | — | 38,69,584.32 | |
| — | 1776.00 | — | — | ||
| Supply of Vibration Dampers :("Hardware & accessories suitable for HTLS conductor at item.No.2, Erection cost included in item.No.3") | — | — | — | 1,24,97,019.36 | |
| — | 20.00 | — | — | ||
| Supply of T-clamp :("Hardware & accessories suitable for HTLS conductor at item.No.2, Erection cost included in item.No.3") | — | — | — | 4,19,294.4 | |
| — | 20.00 | — | — | ||
| Supply of Connector for T-Clamps/Bus bar socket with hole :("Hardware & accessories suitable for HTLS conductor at item.No.2, Erection cost included in item.No.3") | — | — | — | 3,78,213.2 | |
| — | 20.00 | — | — | ||
| Supply of Connector for T-Clamps/Bus bar socket without hole :("Hardware & accessories suitable for HTLS conductor at item.No.2, Erection cost included in item.No.3.") | — | — | — | 2,19,572.4 | |
| — | 10180.00 | — | — | ||
| Disk Insulator 70/90KN :("Hardware & accessories suitable for HTLS conductor at item.No.2, Erection cost included in item.No.3") | — | — | — | 1,08,90,055 | |
| — | 5550.00 | — | — | ||
| Supply of Disk Insulator 120KN :("Hardware & accessories suitable for HTLS conductor at item.No.2, Erection cost included in item.No.3") | — | — | — | 62,00,016 | |
| — | 30.00 | — | — | ||
| Supply of galvanised wire/earth wire along with fixtures. | — | — | — | 19,97,507.4 | |
| — | 30.00 | — | — | ||
| Erection of galvanised wire/earth wire along with fixtures. | — | — | — | 2,37,675.6 | |
| — | 23.00 | — | — | ||
| Supply of copper jumper for connecting ground wire with tower along with all fixtures. | — | — | — | 20,655.38 | |
| — | 23.00 | — | — | ||
| Erection of copper jumper for connecting ground wire with tower along with all fixtures. | — | — | — | 2,957.57 | |
| — | 23.00 | — | — | ||
| Supply of Tension clamp/Anchor fittings for Earthwire | — | — | — | 23,635.95 | |
| — | 23.00 | — | — | ||
| Erection of Tension clamp/Anchor fittings for Earthwire | — | — | — | 11,806.36 | |
| — | 32.00 | — | — | ||
| Supply of 96Fibre (DWSM) OPGW Cable. | — | — | — | 1,35,28,000 | |
| — | 32.00 | — | — | ||
| Erection of 96 Fibre (DWSM) OPGW Cable. | — | — | — | 44,08,000 | |
| — | 134.00 | — | — | ||
| Supply of Single Suspension Clamp Assembly( Hardware & accessories suitable for 96 Fibre OPGW at Item.No.5 B, Erection cost included in Item.No.6 B.) | — | — | — | 4,20,090 | |
| — | 26.00 | — | — | ||
| Supply of Tension Fitting Assembly (JB) ( Hardware & accessories suitable for 96 Fibre OPGW at Item.No.5 B, Erection cost included in Item.No.6 B.) | — | — | — | 1,45,002 | |
| — | 26.00 | — | — | ||
| "Supply of Tension Assembly for Dead end : ( Hardware & accessories suitable for 96 Fibre OPGW at Item.No.5 B, Erection cost included in Item.No.6 B.) | — | — | — | 72,618 | |
| — | 26.00 | — | — | ||
| "Supply of Tension Assembly Double Tension Pass Through : ( Hardware & accessories suitable for 96 Fibre OPGW at Item.No.5 B, Erection cost included in Item.No.6 B.)" | — | — | — | 1,40,062 | |
| — | 26.00 | — | — | ||
| "Supply of Tension Fitting Assembly on Tension Tower : ( Hardware & accessories suitable for 96 Fibre OPGW at Item.No.5 B, Erection cost included in Item.No.6 B.)" | — | — | — | 2,43,542 | |
| — | 294.00 | — | — | ||
| Supply of Vibration Dampers:( Hardware & accessories suitable for 96 Fibre OPGW at Item.No.5 B, Erection cost included in Item.No.6 B.) | — | — | — | 2,84,886 | |
| — | 13.00 | — | — | ||
| Supply of Joint Box:( Hardware & accessories suitable for 96 Fibre OPGW at Item.No.5 B, Erection cost included in Item.No.6 B.) | — | — | — | 1,76,358 | |
| — | 294.00 | — | — | ||
| "Supply of Down Lead Clamps:( Hardware & accessories suitable for 96 Fibre OPGW at Item.No.5 B, Erection cost included in Item.No.6 B.) | — | — | — | 1,06,134 | |
| — | 1.00 | — | — | ||
| "Supply of OPGW Fibre Optic Distribution Panel (FODP) Indoor Type : " | — | — | — | 2,32,513 | |
| — | 1.00 | — | — | ||
| Installation of FODP 96F | — | — | — | 84,645 | |
| — | 200.00 | — | — | ||
| "Supply of earth electrode. | — | — | — | 5,93,238 | |
| — | 200.00 | — | — | ||
| Erection of earth electrode. | — | — | — | 2,07,758 | |
| — | 25.00 | — | — | ||
| "Supply of Galvanised steel structures for gantry, 110 KV Towers and SPS | — | — | — | 22,30,113.5 | |
| — | 25.00 | — | — | ||
| Erection of Galvanised steel structures for gantry, 110 KV Towers and SPS | — | — | — | 1,17,374.5 | |
| — | 200.00 | — | — | ||
| Casting of foundation (M- 15) /Muffing. | — | — | — | 12,82,264 | |
| — | 300.00 | — | — | ||
| Supply of anticlimbing device | — | — | — | 2,72,064 | |
| — | 300.00 | — | — | ||
| Erection of anticlimbing device | — | — | — | 39,936 | |
| — | 5.00 | — | — | ||
| Dismantling of existing tower and their transportation | — | — | — | 1,15,420.75 | |
| — | 65.00 | — | — | ||
| "Dismantling of 3 phase i.e three conductors (phases) of existing 0.1 ACSR conductor and its all accessories safely including damaged/ broken insulators and transportation of the same from site location to Railway's nominated store including weighing of conductor as directed by Engineer incharge. | — | — | — | 45,29,838.3 | |
| — | 1.00 | — | — | ||
| Supply of 110 KV/132 KV D/C Tension Pole S + 0m (30 - 60 Degree)/DE | — | — | — | 21,95,592.91 | |
| — | 1.00 | — | — | ||
| Supply of 110 KV/132 KV D/C Tension Pole S + 6m (30 - 60 Degree)/DE | — | — | — | 31,51,415.68 | |
| — | 1.00 | — | — | ||
| Supply of Monopole Towers (vi)110KV Monopole (30-60d) Single Circuit - S (12+M) Ext | — | — | — | 16,62,707.03 | |
| — | 1.00 | — | — | ||
| Supply of Monopole Towers (vi)110KV Monopole (30-60d) Single Circuit - S (6+M) Ext | — | — | — | 16,62,707.03 | |
| — | 1.00 | — | — | ||
| Supply of Monopole Towers (vi)110KV Monopole (2-15d) Single Circuit - Q (0+M) Ext | — | — | — | 11,80,333.35 | |
| — | 1.00 | — | — | ||
| Supply of Monopole Towers (vi)110KV Monopole (15-30d) Single Circuit -R (3+M) Ext | — | — | — | 16,62,707.03 | |
| — | 1.00 | — | — | ||
| Foundation of 110 KV/132 KV D/C Tension Pole S + 0m (30 - 60 Degree)/DE | — | — | — | 17,56,474.32 | |
| — | 1.00 | — | — | ||
| Foundation of 110 KV/132 KV D/C Tension Pole S + 6m (30 - 60 Degree)/DE | — | — | — | 25,21,132.54 | |
| — | 1.00 | — | — | ||
| — | 1.00 | — | — | ||
| — | 1.00 | — | — | ||
| — | — | — | 7,82,311.25 | ||
| — | 1.00 | — | — | ||
| — | — | — | 11,17,018.67 | ||
| — | 1.00 | — | — | ||
| — | — | — | 4,39,118.59 | ||
| — | 1.00 | — | — | ||
| Erection of 110 KV/132 KV D/C Tension Pole S + 6m (30 - 60 Degree)/DE | — | — | — | 6,30,283.14 | |
| — | 1.00 | — | — | ||
| Erection of Monopole Tower (vi)110KV Monopole (30-60d) Single Circuit - S (12+M) Ext | — | — | — | 1,66,271.21 | |
| — | 1.00 | — | — | ||
| Erection of Monopole Tower (vi)110KV Monopole (30-60d) Single Circuit - S (6+M) Ext | — | — | — | 1,66,271.21 | |
| — | 1.00 | — | — | ||
| Erection of Monopole Tower (vi)110KV Monopole (2-15d) Single Circuit - Q (0+M) Ext | — | — | — | 1,18,033.34 | |
| — | 1.00 | — | — | ||
| Erection of Monopole Tower (vi)110KV Monopole (15-30d) Single Circuit - R (3+M) Ext | — | — | — | 1,66,271.21 | |
| — | 3.00 | — | — | ||
| Provision of retaining wall for tower safety | — | — | — | 3,80,812.47 | |
| — | 3.00 | — | — | ||
| Supply of phase plate along with fixtures | — | — | — | 2,077.56 | |
| — | 3.00 | — | — | ||
| Erection of phase plate along with fixtures | — | — | — | 346.26 | |
| — | 3.00 | — | — | ||
| Supply of danger plate along with fixtures | — | — | — | 1,731.3 | |
| — | 3.00 | — | — | ||
| Erection of danger plate along with fixtures | — | — | — | 346.26 | |
| — | 3.00 | — | — | ||
| Supply of number plate along with fixtures | — | — | — | 1,385.04 | |
| — | 3.00 | — | — | ||
| Erection of number plate along with fixtures | — | — | — | 346.26 | |
| — | — | — | 2,84,13,152.24 | ||
| — | 1.00 | — | — | ||
| Designing and supply of drawings for line sectioning equipments | — | — | — | 1,99,765.2 | |
| — | 35.00 | — | — | ||
| Supply of galvanised steel gantry & supporting structure for equipments & SPS. | — | — | — | 31,22,158.9 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
GCC_April-2022_2022_CE-I_CT_GCC-2022_POLICY_27_04_22.pdf
ATTACHMENT
2022_CE-I_CT_GCC-2022Policy14_07_2022CS-1.pdf
ATTACHMENT
Advance
ATTACHMENT
CTIndianRailwaysStandardGeneralConditionsofContractApril-
ATTACHMENT
CTIndianRailwaysStandardGeneralConditionsofContractApril-
ATTACHMENT
CTIndianRailwaysStandardGeneralConditionsofContractApril-
ATTACHMENT
GCC2022ACS-6_1.pdf
ATTACHMENT
2022-CE-I-CT-GCC-2022-POLICY-Pt.Idated25.09.2024_ACS-7.pdf
ATTACHMENT
2022_12_13RBCE_CE-I-CTIndianRailwaysStandardGeneralConditionsofContractApril2022ACSNo_2.pdf
ATTACHMENT
2023_04_26RBCE_CE-I-CTIndianRailwaysStandardGeneralConditionsofContractApril-2022AdvanceCorrectionSlipNo_3ACS-311.pdf
ATTACHMENT
2023_04_26RBCE_CE-I-CTIndianRailwaysStandardGeneralConditionsofContractApril-2022AdvanceCorrectionSlipNo_4ACS-4.pdf
ATTACHMENT
5-2023_10_20RBCE_CE-I-CTIndianRailwaysStandardGeneralConditionsofContractApril-2022AdvanceCorrectionSlipNo_5ACS-5.pdf
ATTACHMENT
2024_12_20IndianRailwaysStandardGeneralConditionsofContractApril-2022AdvanceCorrectionSlipNo_8ACS-8.pdf
ATTACHMENT
2025_01_09IIndianRailwaysStandardGeneralConditionsofContractApril-2022AdvanceCorrectionSlipNo_9ACS-9.pdf
ATTACHMENT
GCCACS-10-040325.pdf
ATTACHMENT
AnnexureVA.pdf
ATTACHMENT
AnnexureVIA.pdf
ATTACHMENT
Annexure-VIB.pdf
ATTACHMENT
bidcap.pdf
ATTACHMENT
Approved_TD_2025_18R1Part-1.pdf
ATTACHMENT
Approved_TD_2025_18R1Part-2.pdf
ATTACHMENT
GCCACS11_compressed.pdf
ATTACHMENT
2026_06_16Acceptanceofe-BankGuaranteee-BGinWorksContractsandPGMS_PMS_PSSAGC.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].