Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.0 CrAdmitted-Finance | ₹4.0 Cr | L1 | Admitted-Finance |
| 2 | Rejected-Technical | - | - | Rejected-Technical Technically not qualified as per NIT condition |
| 3 | Rejected-Technical | - | - | Rejected-Technical Technically not qualified as per NIT condition |
| Sl No | Description | Qty | Unit | GEOMETRY CONSTRUCTION CO. L1 |
|---|---|---|---|---|
| 1.01 | Supplying and Laying rubble stones weighing from 2000 to 4000 kg (class 'A' stones) having bulk density 1.8 MT/cum in the section of breakwater or such other structure as per drawing or as directed including quarrying , blastings, loading at quarry site , transporting, unloading at work site and arranging in layer with the help of crane of required capacity etc . complete with all labour, machinery, royalty, quarry lease charges etc. complete | 20,970 | MT | 1,125 ₹2,35,91,250 Lowest |
| 1.02 | Supplying and Laying rubble stones weighing upto 500 kg (class 'C' stones) having bulk density 1.7 MT/cum in the section of break water or such other structure as per drawing or as directed including quarrying , blastings, loading at quarry site , transporting, unloading at work site and arranging in layer with the help of crane of required capacity etc . complete with all labour , machinery, royalty, quarry lease charges etc . Complete | 14,800 | MT | 1,075 ₹1,59,10,000 Lowest |
Tender Value
₹2.5 Cr
EMD Value
₹1.2 L
Closing Date
11 Oct 2021, 5:00 pmClosed
CTO, DSCL
Office of DSCL, 2nd Floor, Diu Municipal Council, Diu
Construction of Seawall near INS Khukri under Item Rate Contract with Defect and Maintenance Liability Period for Three year (4th call)
2021_DIUDT_1849_1
55/2021-22/DSCL-DIU
Open Tender
Civil Works - Others
Item Rate
270 days
Diu
Please refer tender documents.
3 documents required · 3 mandatory
₹2,500
Yes
Chief Executive Officer, Diu Smart City Limited
₹1.2 L
Yes
DMC, Diu or via Video Conference
3 Dec 2021
15 Sept 2021
18 Oct 2021
15 Sept 2021
11 Oct 2021
15 Sept 2021
23 Sept 2021
Amount
Supplying and Laying rubble stones weighing from 2000 to 4000 kg (class 'A' stones) having bulk density 1.8 MT/cum in the section of breakwater or such other structure as per drawing or as directed including quarrying , blastings, loading at quarry site , transporting, unloading at work site and arranging in layer with the help of crane of required capacity etc . complete with all labour, machinery, royalty, quarry lease charges etc. complete
Supplying and Laying rubble stones weighing upto 500 kg (class 'C' stones) having bulk density 1.7 MT/cum in the section of break water or such other structure as per drawing or as directed including quarrying , blastings, loading at quarry site , transporting, unloading at work site and arranging in layer with the help of crane of required capacity etc . complete with all labour , machinery, royalty, quarry lease charges etc . Complete
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.07 MB
Tendernotice_2.pdf
PDF • 1.26 MB
BOQ_1953.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .