Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance NO 29 A SADASIVAM STREET ETHIRAJUPURAM TAMBARAM WEST CHENNAI 600 045 | CHENNAI | CHENNAI | TAMIL NADU | 600045 | Admitted-Finance |
| 5 | Admitted-Finance D NO 271D3 5 ANDAL PLOT NO 30 N0 76 DHARANI SQUARE PERAMANUR VILLAGE MARAMALI NAGAR CHENGALPATTU KANCHIPURAM 603 209 | CHENGALPATTU | KANCHIPURAM | TAMIL NADU | 603209 | Admitted-Finance |
Tender Value
₹41.5 L
EMD Value
₹41,600
Closing Date
22 Jun 2020, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE/GCC-I/Chennai
A-10, Thiru-vi-ka Industrial Estate, Guindy, Chennai -32
as per NIT
2020_EB_167235_1
PT-005/2020-21 SE/GCC-I/CNI
Open Tender
Civil Works
Works
120 days
Irungattukkottai
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹41,600
Yes
8 Jul 2020
6 Jun 2020
23 Jun 2020
6 Jun 2020
22 Jun 2020
6 Jun 2020
90 days
Amount
Labour charges for Clearing of juliflora jungle including cost of all labour, transport, T&P, lead lift etc., complete as directed by the department engineer at site.
Labour Charges for conducting check survey, pegging, marking of pits for tower foundation as per the apporved profile including chaining and carring theodolite instrument, measuring span length and pit marking including cost of all men and materials as directed by Department Engineer at site.
Earth work excavation soil and depositing on bank with initial lead of 10m and lift of 2m in Hard gravelly soil, stiff clay, block cotton,gravel, stoney earth and earth mixed with small size boulder etc., complete including cost of all materials lead lift etc complete as directed by the department engineer at site.
Labour charges for bailing out of water by using pumpset including the cost of heir charges for diesel pumpset 0.5HP, labour fuel charges, transport, T & P, lead, lift ect., complete as directed by the department engineer at site.
Providing shoring and shuttering including cost of all labour, materials, transport, leads, lift,etc., complete and as directed by the department engineer at site.
Plain Cement Concrete 1:3:6 using 20 mm HBG stone for padding and footing concrete without form work including cost of all materials, labour, transport, curing, lead, lift etc. complete as per standard specification and as directed by the dept. Engineer at site .
Labour charges for transport of template including assembling of template and shifting template from location to location and reassambling the same including cost of all labour, transport, lead, lift, etc., complete as directed by the department engineer at site.(The template will be make own arrangement by the contractor)
P:C:C 1:2:4 using 12 to 20mm HBG metal for footing concrete including cost of all materials, transport, lead, Lift, labour, for laying concrete curing etc., complete as directed by the department engineer at site. Without form work
Providing and laying P:C:C 1:2:4 using 20mm HBG metal for chiminey with form work using steel centering for soffits of reinforced cement concrete slabs or plain surfaces including stutting up to 3m high, using M.S. Sheets of size 90cm x 60cm. and 'B.G.10' guage, stiffened with welded M.S. angle of size 25mm x 25mm x 3mm laid over silver oak (Country wood) joists of size 10cm x 6.5cm. (spaced at about 90 cm c/c) and supported by casurina props of 10cm to 13cm. dia (spaced at 75cm c/c) complying with standard specification including cost of all materials, transport, curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site.
R.C.C. 1:1.5:3 using 12- 20mm metal with form work using steel centering for soffits of reinforced cement concrete slabs or plain surfaces including stutting up to 3m high, using M.S. Sheets of size 90cm x 60cm. and 'B.G.10' guage, stiffened with welded M.S. angle of size 25mm x 25mm x 3mm laid over silver oak (Country wood) joists of size 10cm x 6.5cm. (spaced at about 90 cm c/c) and supported by casurina props of 10cm to 13cm. dia (spaced at 75cm c/c) complying with standard specification including cost of all materials,transport, curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site.
Providing steel reinforcement for all RCC works including cost of all materilas steel, binding wire, labour, lead, lift, cutting, bending, typing and binding and placing in position etc., complete as directed by the department engineer at site.
Plastering in cement mortar 1:3, 12 mm thick for inside and outside walls including cost of all material scaffolding, curing, labour with all lifts etc., complete as directed by dept.Engineer at site
Labour charges for back filling of pits with excavated earth other then sand in layers of 150mm thick, including charges for spreading watering, consolidation as per standard specification and as directed by the engineer at site including all labour, transport charges, lead and lift etc., complete.
Supplying and providing Pipe type earthing with 40 mm dia GI pipe (medium class) as per specification and as direct by the site engineer including cost of all meterials, cutting of earth wire to the required length and connecting to the tower leg and earth pipe with 2 Nos. bolts, nuts, with washers, drilling charges etc., complete as per specification and as directed by the department engineer at site.
Labour charge for transporting and erection of tower parts including sorting out of tower parts at stores and site, rectification in tower parts if any, cost of T&P, labour, transport from stores, lead, lift, etc., complete as directed by the department engineer at site. under normal condition
Labour charge for transporting and erection of tower parts including sorting out of tower parts at stores and site, rectification in tower parts if any, cost of T&P, labour, transport from stores, lead, lift, etc., complete as directed by the department engineer at site. LC Condition
welding of exposed faces of bolts and nuts at two places 1 cm each diagonally opposite each other after tightening and puching to avoid theft of tower parts with one coat of painting zinc coat in the welded portion including cost of welding rod, hire charge for generators, painting the bolts and nuts transporting labour, lead, lift etc complete as per instrution incharge of department engineer at site
Labour charges for Transporting and hoisting of 7 units 90 KN Anti fog suspension insulators with fittings from store to site including cost of all labour, transport, lead, lift, etc., complete as directed by the department engineer at site. Under Normal Condition
Labour charges for Transporting and hoisting of 08 units tension insulators 120 KN with fittings from store to site including cost of all labour, transport, lead, lift, etc., complete as directed by the department engineer at site. Under Normal condition
Labour charges for transporting and paying out of 3 Nos. of Panther conductor with fittings including sorting out of conductor according to drum schedule and loading and unloading at site providing trussels cost of T&P lead and lift etc., complete.
Labour charges for transporting and paying out of 6 Nos. of Panther conductor with fittings including sorting out of conductor according to drum schedule and loading and unloading at site providing trussels cost of T&P lead and lift etc., complete.
Labour charges for rough sagging tensioning, clipping of 3 Nos. Panther conductor with fittings including cost of all T&P, labour, lead and lift etc., complete as directed by the department engineer at site. Normal Condition
Labour charges for rough sagging tensioning, clipping of 3 Nos. Panther conductor with fittings including cost of all T&P, labour, lead and lift etc., complete as directed by the department engineer at site. LC Condition
Labour charges for rough sagging tensioning, clipping of 6 Nos. Panther conductor with fittings including cost of all T&P, labour, lead and lift etc., complete as directed by the department engineer at site. LC Condition
labour charges for paying out and stringing of 1 no. GI 7/3.55 mm SWG steel earth wire with fittings cost of T&P lead and lift, etc., complete as directed by the department engineer at site.
Labour charges for rough sagging tensioning, clipping of for earth wire including cost of all T&P, labour, lead and lift etc., complete as directed by the department engineer at site. Under Normal condition
Labour charges for rough sagging tensioning, clipping of for earth wire including cost of all T&P, labour, lead and lift etc., complete as directed by the department engineer at site. Under LC condition
Providing temporary guys including the cost of all labour, transport, excavation fixing of rails, back filling, etc., complete and as directed by the department engineer at site.
Arranging and attending shutdowns work on HT / LT, EHT lines, dismandling and restringing of HT / LT / EHT lines after completion of line stringing work including charges for T&P, transport, lead, lift, etc., complete as directed by the department engineer at site
Painting tower legs using best qulity anticorroessive black paint two coats 1 m above coping including cost of all materials labour lead, lift etc., complete as directed by the department engineer at site.
Labour charges for fixing of Number board 200 mm X 200 mm including cost of paint, labour for fixing and all materials, labour, T&P, transport, lead, lift, etc., complete as directed by the department engineer at site.
Labour charges for fixing of Danger Board 100 mm x 500 mm including cost of paint, labour for fixing and all materials, labour, T&P, transport, lead, lift, etc., complete as directed by the department engineer at site.
Labour charges for fixing of phase plate (Set of three) 20 mm dia including cost of paint, labour for fixing and all materials, labour, T&P, transport, lead, lift, etc., complete as directed by the department engineer at site.
Labour charges for fixing of Name board 1500 mm x 600 mm (Circuit Name) including cost of paint, labour for fixing and all materials, labour, T&P, transport, lead, lift, etc., complete as directed by the department engineer at site.
Labour charges for dismantling of Conductor and devoluted to stores including cost of T&P, labour, transport, lead, lift etc., complete as directed by the department engineer at site. Under LC Condition (Single Span)
Labour charges for dismantling of Conductor and devoluted to stores including cost of T&P, labour, transport, lead, lift etc., complete as directed by the department engineer at site. Under LC Condition (Continous Span)
Labour charges for dismantling of GI Earth wire -1No and devoluted to stores including cost of T&P, labour, transport, lead, lift etc., complete as directed by the department engineer at site. Under LC Condition (Single Span)
Labour charges for dismantling of GI Earthwier - 1No and devoluted to stores including cost of T&P, labour, transport, lead, lift etc., complete as directed by the department engineer at site. Under LC Condition (Continous Span)
Dismanteling the insulator and devoluted to stores including cost of labour for releasing, tools and plants transporting charges from site etc complete for 120 KN disc insulators (Under LC Condition)
Dismanteling the insulator and devoluted to stores including cost of labour for releasing, tools and plants transporting charges from site etc complete for 90 KN disc insulators (Under LC Condition)
SCRAP - Dismantling of 110 KV existing DC tower and owing the same as is where is condition including cost of dismantling charges, transport, lead, lift etc., complete as directed by the department engineer at site.
GST for bidders within TamilNadu
GST for bidders outside TamilNadu (IGST)
alliraj contractor
Dillibabu
ULTRAPOWER BUILDERS
Dhinesh kumaar Enterprises
MK DHANALAKSHMI ENGINEERING PRIVATE LIMITED
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .