| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.1 CrAccepted-Finance | ₹1.1 Cr | 1 | Accepted-Finance Bid Accepted |
| 2 | 2₹1.2 CrAccepted-Finance | ₹1.2 Cr | 2 | Accepted-Finance Bid Accepted |
| 3 | 3₹1.3 CrAccepted-Finance | ₹1.3 Cr | 3 | Accepted-Finance Bid Accepted |
| 4 | 4₹1.4 CrAccepted-Finance | ₹1.4 Cr | 4 | Accepted-Finance Bid Accepted |
| 5 | 5₹1.4 CrAccepted-Finance | ₹1.4 Cr | 5 | Accepted-Finance Bid Accepted |
| Sl No | Description | Qty | Unit | ADMIRECON INFRASTRUCTURE PVT. LTD. L1 | APJ CONSTRUCTIONS L10 | Unique Rehab private limited L7 | SURENDRA SINGH RATHORE L8 | M S SHAH AND ASSOCIATES L4 | SHREE BALAJI EXTERIORS PRIVATE LIMITED L3 | BAWGE AND SONS L2 | Zindus Infra India Private Limited L5 | chauhan construction pvt ltd L6 | puja & co. L9 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00ENABLING WORKS | |||||||||||||
| 1.01 | Erecting single/double bamboo scaffolding includingfixing temporary plywood in min. thickness of 4mm to doors, windows etc. when work is in progress and dismantling the same when work is over..(Note:- Same scaffolding to be used for external painting works ) | 3,500 | SQM | 30 ₹1,05,000 | 178 ₹6,23,000 | 144 ₹5,04,000 | 361 ₹12,63,500 | 120 ₹4,20,000 | 128 ₹4,48,000 | 80 ₹2,80,000 | 100 ₹3,50,000 | 60 ₹2,10,000 | 90 ₹3,15,000 |
| 1.02 | Providing and fixing hessian cloth when work is in progress and dismantling the same when work is over. | 3,500 | SQM | 10 ₹35,000 | 70.25 ₹2,45,875 | 63 ₹2,20,500 | 133 ₹4,65,500 | 40 ₹1,40,000 | 58 ₹2,03,000 | 50 ₹1,75,000 | 50 ₹1,75,000 | 55 ₹1,92,500 | 30 ₹1,05,000 |
| 1.03 | Provide safety net for the safety purpose to prevent debris from falling the free movement of vehiclec ,remove the same after the completion of the work. | 990 | SQM | 10 ₹9,900 | 55.65 ₹55,093.5 | 225 ₹2,22,750 | 119 ₹1,17,810 | 350 ₹3,46,500 | 128 ₹1,26,720 | 130 ₹1,28,700 | 100 ₹99,000 | 100 ₹99,000 | 200 ₹1,98,000 |
| 2.00STRUCTURAL REPAIR WORKS (EXT & INTERNAL) | |||||||||||||
| 2.01 | Chipping off existing loose, damaged Concrete from RCC members of all affected RCC Columns, Beams, Slabs and Chajjas on External and internal facades, etc beyond main r/f. (if required in the opinion of the Consultant), carefully with chisel and hammer Providing and applying ‘Rusticide SS’ Rust passivator or equivalent as specified in the Brand Names to existing r/f. bars Including wire brushing of reinforcement , cleaning washing of concrete etc complete as directed.Providing and applying two coats of rust preventor slurry made out of “Polyalk Fixoprime” or equivalent as specified in the Brand Names and cement in proportion 1:1.5 to existing r/f.bars as directed complete. Providing and applying bonding coat of slurry made out of “Polyalk EP” or equivalent as specified in the Brand Names and cement in proportion 1:1 to concrete and r/f substrates complete as directedProviding and applying “Polyalk EP” or equivalent as specified in the Brand Names and providing Ready mix Polymer modified cement mortar of minimum M40 grade ) to RCC members Including Hand packing, curing and making the surface rough for plastering. | 730 | SQM | 900 ₹6,57,000 | 4,100 ₹29,93,000 | 2,700 ₹19,71,000 | 1,218 ₹8,89,140 | 1,650 ₹12,04,500 | 1,451 ₹10,59,230 | 1,291.2 ₹9,42,576 | 1,300 ₹9,49,000 | 1,050 ₹7,66,500 | 1,500 ₹10,95,000 |
| 2.02 | RELIEVING STRUCTURAL MEMBERS
Relieving Structural members such as column, beam and slabs of their superimposed loads partially or fully by provision of adjustable steel props, frames etc. including providing necessary timber runners, bracing, jacking up arrangement all Complete to the satisfaction of Engineer in charge (Removing and redoing of brickwork, if required, shall be paid separately | 200 | Nos | 200 ₹40,000 | 250 ₹50,000 | 450 ₹90,000 | 285 ₹57,000 | 150 ₹30,000 | 480 ₹96,000 | 150 ₹30,000 | 200 ₹40,000 | 350 ₹70,000 | 200 ₹40,000 |
| 2.03 | FILLING AND REINSTATING OF SEPARATION CRACKS Opening the Separation Cracks at the Junction of RCC and Masonry where ever directed and instructed into ‘’V’’ Grooves 2’’ to 3’’ from the either side of the cracks by carefully marking the areas to be opened up using a Cutting machine and skillfully /carefully Chiseling with a well sharpened chisel and hammer as directed including Wire brushing and washing of concrete Substrata and masonry walls with water jet to the surfaces thus prepared to the entire satisfaction of the Consultant as instructed and directed. | 240 | RMT | 70 ₹16,800 | 785 ₹1,88,400 | 360 ₹86,400 | 95 ₹22,800 | 25 ₹6,000 | 135 ₹32,400 | 25 ₹6,000 | 100 ₹24,000 | 60 ₹14,400 | 70 ₹16,800 |
| 2.04 | Moistening the Cracks, Providing and applying priming/bonding coat of slurry made out of “Polyalk EP”and cement (or equivalent as specified in the List of Brand names) in proportion 1:1 to surfaces prepared as instructed and directed. Filling the Cracks /Grooves by Providing and applying “Polyalk EP” Polymer modified cement mortar (or equivalent as specified in the List of Brand names) in Proportion of 1: 20: 60 (Polyalk EP: Cement: Graded sand/quartz sand) on the prepared surfaces and finishing it in level with the existing plaster Including Hand packing, curing and making the surface similar to the external plastering using wooden floats/punch etc. complete as per specified and directed. | 240 | RMT | 50 ₹12,000 | 750 ₹1,80,000 | 270 ₹64,800 | 475 ₹1,14,000 | 125 ₹30,000 | 41 ₹9,840 | 45 ₹10,800 | 100 ₹24,000 | 200 ₹48,000 | 50 ₹12,000 |
| 2.05 | Drilling holes of required size upto 16 mm Diameter and up to 50mm depth in concrete and cleaning the same as directed. | 850 | Nos | 50 ₹42,500 | 450 ₹3,82,500 | 297 ₹2,52,450 | 166 ₹1,41,100 | 75 ₹63,750 | 38 ₹32,300 | 25 ₹21,250 | 80 ₹68,000 | 100 ₹85,000 | 100 ₹85,000 |
Tender Value
₹2.3 Cr
EMD Value
₹2 L
Closing Date
4 May 2026, 2:00 pmClosed
Alfreda Dsouza
Suraksha, 170, J Tata Road, Churchgate, Mumbai
The Corporation intends to invite applications from intrested and eligible bidders to Carryout Structural Repairs at GIC HO - Suraksha building
2026_GIC_274058_1
GIC-HO/OSD/431/2025-26
Open Tender
Civil Works
180 days
Suraksha, 170, J Tata Road, Churchgate
As per Bid Document
7 documents required · 7 mandatory
₹0
₹2 L
Yes
GIC HO
29 Jun 2026
8 Apr 2026
5 May 2026
9 Apr 2026
4 May 2026
17 Apr 2026
9 Apr 2026 - 16 Apr 2026
17 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1ENABLING WORKS | |||||
| 1.01 | Erecting single/double bamboo scaffolding includingfixing temporary plywood in min. thickness of 4mm to doors, windows etc. when work is in progress and dismantling the same when work is over..(Note:- Same scaffolding to be used for external painting works ) | - | SQM | - | - |
| 1.02 | Providing and fixing hessian cloth when work is in progress and dismantling the same when work is over. | - | SQM | - | - |
| 1.03 | Provide safety net for the safety purpose to prevent debris from falling the free movement of vehiclec ,remove the same after the completion of the work. | - | SQM | - | - |
| 2STRUCTURAL REPAIR WORKS (EXT & INTERNAL) | |||||
| 2.01 | Chipping off existing loose, damaged Concrete from RCC members of all affected RCC Columns, Beams, Slabs and Chajjas on External and internal facades, etc beyond main r/f. (if required in the opinion of the Consultant), carefully with chisel and hammer Providing and applying ‘Rusticide SS’ Rust passivator or equivalent as specified in the Brand Names to existing r/f. bars Including wire brushing of reinforcement , cleaning washing of concrete etc complete as directed.Providing and applying two coats of rust preventor slurry made out of “Polyalk Fixoprime” or equivalent as specified in the Brand Names and cement in proportion 1:1.5 to existing r/f.bars as directed complete. Providing and applying bonding coat of slurry made out of “Polyalk EP” or equivalent as specified in the Brand Names and cement in proportion 1:1 to concrete and r/f substrates complete as directedProviding and applying “Polyalk EP” or equivalent as specified in the Brand Names and providing Ready mix Polymer modified cement mortar of minimum M40 grade ) to RCC members Including Hand packing, curing and making the surface rough for plastering. | - | SQM | - | - |
| 2.02 | RELIEVING STRUCTURAL MEMBERS
Relieving Structural members such as column, beam and slabs of their superimposed loads partially or fully by provision of adjustable steel props, frames etc. including providing necessary timber runners, bracing, jacking up arrangement all Complete to the satisfaction of Engineer in charge (Removing and redoing of brickwork, if required, shall be paid separately | - | Nos | - | - |
| 2.03 | FILLING AND REINSTATING OF SEPARATION CRACKS Opening the Separation Cracks at the Junction of RCC and Masonry where ever directed and instructed into ‘’V’’ Grooves 2’’ to 3’’ from the either side of the cracks by carefully marking the areas to be opened up using a Cutting machine and skillfully /carefully Chiseling with a well sharpened chisel and hammer as directed including Wire brushing and washing of concrete Substrata and masonry walls with water jet to the surfaces thus prepared to the entire satisfaction of the Consultant as instructed and directed. | - | RMT | - | - |
| 2.04 | Moistening the Cracks, Providing and applying priming/bonding coat of slurry made out of “Polyalk EP”and cement (or equivalent as specified in the List of Brand names) in proportion 1:1 to surfaces prepared as instructed and directed. Filling the Cracks /Grooves by Providing and applying “Polyalk EP” Polymer modified cement mortar (or equivalent as specified in the List of Brand names) in Proportion of 1: 20: 60 (Polyalk EP: Cement: Graded sand/quartz sand) on the prepared surfaces and finishing it in level with the existing plaster Including Hand packing, curing and making the surface similar to the external plastering using wooden floats/punch etc. complete as per specified and directed. | - | RMT | - | - |
| 2.05 | Drilling holes of required size upto 16 mm Diameter and up to 50mm depth in concrete and cleaning the same as directed. | - | Nos | - | - |
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.36 MB
BOQ_319972.xls
BOQ • 0.42 MB
Cor_Rep.pdf
PDF • 0.18 MB
Download all tender documents and submit your bid