Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.6 CrAccepted-AOC WARD NO 07 D K ROAD LAKHIMPUR ASSAM | ₹23.6 Cr | L1 | Accepted-AOC Work Order Issued |
| 2 | L2₹25.8 CrRejected-AOC R K PATH ITACHALI HOUSE NO 22 CITY TOWN NAGAON P O NAGAON P S SADAR DISTRICT NAGAON PIN 782003 | NAGAON | ASSAM | 782003 | ₹25.8 Cr | L2 | Rejected-AOC L2 |
| 3 | L3₹26.2 CrRejected-AOC BAKOLA JAMUGURIHAT SONITPUR ASSAM PIN 784182 | SONITPUR | ASSAM | 784182 | ₹26.2 Cr | L3 | Rejected-AOC L3 |
| 4 | Not Admitted-Fee/PreQual/Technical F A ROAD KUMARPARA PANCHALI KUMARPARA GUWAHATI PIN 781001 | KAMRUP METRO | ASSAM | 781001 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹26.2 Cr
EMD Value
₹52.4 L
Closing Date
19 Dec 2020, 2:00 pmClosed
C.E. PWD (Roads), Assam, Chandmari, Guwahat
O/o the C.E. PWD (Roads), Assam, Chandmari, Guwahati, 781003
SOPD-G/BR/2020-21/Lakhimpur/01 Construction of RCC Bridge No. 5/1 over river Ranganadi at Phatasutighat on Panigaon Kharkati Ahomoni Mirigaon Road under SOPD-G for the year 2020-21 under Lakhimpur LAC
2020_PWD_19391_1
CE/STBR/SOPD-G/25/2020-21/3
Open Tender
Civil Works
1080 days
Lakhimpur
Please refer Tender documents.
6 documents required · 6 mandatory
₹10,000
Empowered Officer, Assam State Road Board
₹52.4 L
Yes
7 Mar 2022
24 Nov 2020
21 Dec 2020
28 Nov 2020
19 Dec 2020
28 Nov 2020
28 Nov 2020 - 19 Dec 2020
Amount
RCC BRIDGE:'Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. 'I. Ordinary soil 'B. Mechanical Means (I) Without dewatering '(i) Depth upto 3 m
Providing and constructing temporary island 16 m diameter for construction of well foundation for 8m dia. Well. 'B. Assuming depth of water 4.0 m and height of island 4.5 m.
Providing and constructing temporary island 16 m diameter for construction of well foundation for 8m dia. Well. - 'C. Providing and constructing one span service road to reach island location from one pier location to another pier location
Providing and laying cutting edge of mild steel weighing 40 kg per metre for well foundation complete as per drawing and technical specification.
Plain/Reinforced cement concrete, in well foundation complete as per drawing and technical specification including steel shuttering formwork. (N). Without plasticiser 'A. Well curb '(ii) . RCC M25 Grade 'Case I. Using concrete mixer
Plain/Reinforced cement concrete, in well foundation complete as per drawing and technical specification including steel shuttering formwork. (N). Without plasticiser 'B. Well steining '(v). RCC M25 Grade 'Case I. Using concrete mixer
Plain/Reinforced cement concrete, in well foundation complete as per drawing and technical specification including steel shuttering formwork.(N). Without plasticiser 'C. Bottom Plug '(ii). PCC Grade M25 'Case I. Using Concrete Mixer
Plain/Reinforced cement concrete, in well foundation complete as per drawing and technical specification including steel shuttering formwork.(N). Without plasticiser 'D. Intermediate plug (ii). Grade M25 PCC 'Case I. Using Concrete Mixer
Plain/Reinforced cement concrete, in well foundation complete as per drawing and technical specification including steel shuttering formwork.(N). Without plasticiser 'E. Top plug '(iii). Grade M25 PCC 'Case I. Using Concrete Mixer
Plain/Reinforced cement concrete, in well foundation complete as per drawing and technical specification including steel shuttering formwork.(N). Without plasticiser 'F. Well cap (ii). RCC Grade M25'Case I. Using concrete Mixer
Sinking of 6 m external diameter well ( other than pneumatic method of sinking ) through all types of strata namely sandy soil, clayey soil and rock as shown against each case, complete as per drawing and technical specifications. Depth of sinking is rekonewedfrom bed level. 'A. Sandy soil '(i). Depth below bed level upto 3.0 M
Sinking of 6 m external diameter well ( other than pneumatic method of sinking ) through all types of strata namely sandy soil, clayey soil and rock as shown against each case, complete as per drawing and technical specifications. Depth of sinking is rekonewedfrom bed level. 'A. Sandy soil '(ii). Beyond 3m upto 10m depth
Sinking of 6 m external diameter well ( other than pneumatic method of sinking ) through all types of strata namely sandy soil, clayey soil and rock as shown against each case, complete as per drawing and technical specifications. Depth of sinking is rekonewedfrom bed level. 'A. Sandy soil '(iii). Beyond 10m upto 20m
Sinking of 6 m external diameter well ( other than pneumatic method of sinking ) through all types of strata namely sandy soil, clayey soil and rock as shown against each case, complete as per drawing and technical specifications. Depth of sinking is rekonewedfrom bed level. 'A. Sandy soil '(iv). Beyond 20m upto 30 m'a. For sinking
Sinking of 7 m external diameter well ( other than pneumatic method of sinking ) through all types of strata namely sandy soil, clayey soil and rock as shown against each case, complete as per drawing and technical specifications. Depth of sinking is rekonewed from bed level. 'A. Sandy soil '(i). Depth below bed level upto 3.0 M
Sinking of 7 m external diameter well ( other than pneumatic method of sinking ) through all types of strata namely sandy soil, clayey soil and rock as shown against each case, complete as per drawing and technical specifications. Depth of sinking is rekonewed from bed level. 'A. Sandy soil '(ii). Beyond 3m upto 10m depth
Sinking of 7 m external diameter well ( other than pneumatic method of sinking ) through all types of strata namely sandy soil, clayey soil and rock as shown against each case, complete as per drawing and technical specifications. Depth of sinking is rekonewed from bed level. 'A. Sandy soil '(iii). Beyond 10m upto 20m
Sinking of 7 m external diameter well ( other than pneumatic method of sinking ) through all types of strata namely sandy soil, clayey soil and rock as shown against each case, complete as per drawing and technical specifications. Depth of sinking is rekonewed from bed level. 'A. Sandy soil '(iv). Beyond 20m upto 30 m 'a. For sinking
Sand filling in wells complete as per drawing and technical specifications
Reinforcement in Foundation: Supplying, fitting and placing TMT IS:1786 Fe500 D bar reinforcement in foundation complete as per drawing and technical specifications (a). TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent)
Plain/Reinforced cement concrete, in sub structure complete as per drawing and technical specification and steel shuttering formwork (N). Without plasticiser F. RCC Grade M25 a. Height upto 5m 'Case I. Using concrete Mixer
Supplying, fitting and placing TMT IS:1786 (Fe 500) bar reinforcement in sub-structure complete as per drawing and technical specifications (a). TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent)
Supplying, fitting and fixing in position true to line and level cast steel rocker bearing conforming to IRC: 83(Pt.-1) section IX and clause 2003 of MoRTH specifications complete including all accessories as per drawing and Technical Specifications.
Supplying, fitting and fixing in position true to line and level forged steel roller bearing conforming to IRC: 83(Pt.-1) section IX and clause 2003 of MoRTH specifications complete including all accessories as per drawing and Technical Specifications.
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification 'A. Granular material
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specification.
SUPER-STRUCTURE- 'Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification' including steel shuttering formwork. (N). Without Plasticiser 'E. PSC Grade M-40 'Case 1 Using concrete mixer. '(ii) . For T-beam & slab a. Height upto 5m
Reinforcement in Super Structure: Supplying, fitting and placing TMT conforming to IS:1786 Fe 500 D reinforcement in super-structure including splicing complete as per drawing and technical specifications (a). TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent)
High tensile steel wires/strands including all accessories for stressing, stressing operations and grouting complete as per drawing and Technical Specifications
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications
Construction of precast RCC railing of M30 Grade, aggregate size not exceeding 12 mm, true to line and grade, tolurence of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequat space between vertical posts for expansion, complete as per approved drawings and technical specifications.
Strip Seal Expansion Joint (Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instruction for installation).
Drainage Spouts complete as per drawing and Technical specification
Reinforced cement concrete approach slab including reinforcement and formwork complete as per drawing and Technical specification (a). TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent)
Construction of cold weather Bamboo bridge overall width of 3.70m and clear road way 3m with jungle wood post 20cm to 25cm dia 5nos. In each rows and rows being 2.1m. apart except for the navigable span which should be 3m. Post to be driven at least 180cm. or more below ground level including providing 20cm to 25cm center to center and placed over 20 cm dia, jungle wood dham, 15cm dia. jungle wood bracing collar fixed by bolts and nuts, straps etc. mature bholuka Bamboo cross groth all closely packed and tied 75cm wide track way made from 38mm thick 1st class local plank fixed on 75mmx100mm first class local wood battens 120cm apart and 3 lines of jati bamboo horizantal railing fixed in bholuka bamboo post placed at 210cm apart and white washed including all necessary nuts and bolts, coir ropes, struts, nails etc. complete with a layer of brushwood to exposed portion out-side trackway with earth topping complete as per direction of the department.
Carrying out Sub Soil investigation (SSI) for all type of soil (except boring in rock) upto depthof 30 m or refusal (N=100) for each foundation location as per IRC 78-2014 and submission of SSI report to the Engineer in charge for approval . Preparation & submission of Design calculation & Drawings of foundation , sub structure,Super structure as relevant IRC Codes and SSI Report , 2( two) each of Design& Drawing of each bridge to be submitted for approval and 8 ( eight)copies after approval of competent authority. including providing and erecting informatory sign board as per norms .
Protection work: Earthwork in excavation in key cage of size 1.00m x 1.00m x 1.00m for anchoring geo fabrics mat including supply and filling of geo bags (bags are filled with sand/silt from flood plain or adjacent char within a distance of 90 m of the work site), filling geo bags with sand weighing 126kg after filling, stitching mouth with polyster/ polypropylene thread by power driven double needle machine, carrying the same to the site including all handling charges and local carriage from a distance of 150m complete as per technical specifications and as directed.
Supplying, laying, fitting and fixing g-mat in doubled layer composite geo textile fabricated to form a three dimensional mattresses after filling sand by pump, the upper layer of mattress being heavily woven with polyproplyne fabric needle punched with a mixture of U.V. stabilized green fibres and cut tape yarns (Typical value of mass per unit area ASTM D5261) is 650g/sqm, tensile strength (ASTMD4595)is 45kn/m, pore size (ASTMD4751) is less than 0.35mm and UV stability (strength retained per ASTMD4355-92 @ 500hrs is 80%) the lower layer of the mattress being polypropyline wooven fabric, UV stabilized (Typical value of mass per unit area (ASTM D 4595) is greater than 80kn/m, pore size (ASTMD4751) is less than 0.35mm and UV stability (strength retained per ASTM4355-92 @ 500hrs is 80%). The sewing thread being of high tenacity polyster, continued parrell stitches positioned 350mm apart with a stitch length not exeeding 40mm anchoring by cutting trenches of 1.5m x 1m placing the mat filling earth filled cement bags anchorage at lower end, double locking chain stitch 3 stitch/inch including all charges complete. (Approved rate of CWC for the FMP scheme under WRD)
Boulder apron laid in wire crates (Providing and laying of boulder apron laid in wire crates made with 4mm dia GI wire conforming to IS: 280 & IS:4826 in 100mm x 100mm mesh (weaved diagonally) including 10% extra for laps and joints laid with stone boulders weighting not less than 40Kg each.)
Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification
Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications 'A. Stone/Boulder
Road work: 'Clearing and Grubbing Road Land -.(Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable materials to beused or auctioned up to lead of 1000metres including removal and disposal of top organic soil not exceeding 150mm thickness.' (i) By Manual Means:- 'A.In area of light jungle
Embankment Construction with Material Obtained from Borrow Pits (Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirment of table 300-2 ( Including cost of testing of materials at site and laboratory as directed by the deptt.) (a) from private land
Construction of Subgrade and Earthen Shoulders (Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table (300-2) (a), ( Including cost of testing of materials at site and laboratory as directed by the deptt.) '(a) from private land
Granular Sub-Base with Coarse Graded Material ( Table:- 400- 2) (Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC,and compacting with vibratory roller to achieve the desired density,complete as per cl. 401 including all lead and lift and payment of FR ,GST etc complete'(ii). for grading- II Material
Wet Mix Macadam (Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sb-base/base course on well prepared surface and compacting with vibratory roller to achieve the desired density (including carriage of material from quarry to plant and carriage of mixed materials from mixing plant to site of work including payment of FR, GST ETC complete and as directed by the department
Prime coat (Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means.)( Including cost of testing of materials at site and laboratory as directed by the deptt.) '(i) With bitumen emulsion-CSS-1h
Tack coat - 'Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom.( Including cost of testing of materials at site and laboratory as directed by the deptt.) '(I)With Bitumen emulsion CSS-1h '(c) Granular surfaces treated with primer
Dense Graded Bituminous Macadam (Providing and laying dense bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 to 4.5% by weight of total mix and filler transporting the hot miox to work site,laying with a hydrostatic paver finisher with sensor control to the reqd. grade, lavel and alignment,rolling with smooth wheeled,vibratory and tandem rollers to achieve the desired compaction as per MoSRT&H cl. no. 507. complete in all respect. (including all lead and lift upto site of work and payment of FR & GST etc complete )( Including cost of testing of materials at site and laboratory as directed by the deptt.) '(a) With hydrated lime/cement as filler ( refer table 500-9 of MoSRT&H specification)(A)(I)'with 60/70 or VG-30 grade bitumen '(ii). for GradingII(19 mm nominal size)
Bituminous Concrete (Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 % of mix and filler transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the reqd. grade, lavel and alignment,rolling with smooth wheeled,vibratory and tandem rollers to achieve the desired compaction as per MoSRT&H cl. no.509. complete in all respect. (including all lead and lift upto site of work and payment of FR & GST etc complete )( Including cost of testing of materials at site and laboratory as directed by the deptt.) A'(a) With hydrated lime/cement as filler ( refer table 500-9 of MoSRT&H specification)(I)'with 60/70 or VG-30 grade bitumen'(i) for Grading-I ( 19 mm nominal size )
Type - A, "W" : Metal Beam Crash Barrier (Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2m center to center, 1.8 m high, 1.1m below ground/road level, all steel parts and fitments to be galvanized by hot dip process, all fitting to conform to IS:1367 and IS:1364, metal beam rail to be fixedon the vertical post with a spacer of channel section 150mmX75mmX5mm, 330mm long complete as per clause 810.)
'Direction and place identification sign more than 0.9sqm size board. Providing and erecting direction and place identification retro-Reflectrorised sign as per IRC:67 made of encapsulated lens type reflective sheeting vide clause 801.3 fixed over aluminium sheeting, 2mm thick with area exceeding 0.9sqm fixed on an angle iron of 25x25x4mm supported on a mild steel angle iron post 75mm x 75mm x 6mm, 2 nos. firmly fixed to the ground by means of properly design foundation with M-15 grade Cement concrete 45cm x 45cm x 60cm, 60cm below ground level as per approved drawing and sign. . ( All the Steel work must be Tata/Sail/or any other approved brand)
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes and conforming to the MoSrt&H specifications
Providing and fixing Globemarker with dimensions120x60x16.5 (b) Two- way reflective with 2x39 glass elements.
Box culvert: 'Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. 'I. Ordinary soil A. Manual Means (I) Without dewatering '(i) upto 3 m depth
Sand Filling in Foundation Trenches as per Drawing & Technical Specification
Plain/Reinforced cement concrete, in open foundation complete as per drawing and technical specification including steel shuttering formwork. (N) Without plasticiser 'A. 'PCC Grade M15
Plain/Reinforced cement concrete, in open foundation complete as per drawing and technical specification including steel shuttering formwork. (N) Without plasticiser 'C '(I)RCC Grade M20 'Case I. Using concrete mixer
Reinforcement in Foundation: Supplying, fitting and placing TMT IS:1786 Fe500 D bar reinforcement in foundation complete as per drawing and technical specifications (b). TMT-IS 1786 ( Fe-500 D) Secondary Producer (ISI approved)
Plain/Reinforced cement concrete, in sub structure complete as per drawing and technical specification and steel shuttering formwork (N). Without plasticiser A. PCC Grade M15 i) Height upto 5m A. PCC Grade M15
Plain/Reinforced cement concrete, in sub structure complete as per drawing and technical specification and steel shuttering formwork (N). Without plasticiser E. RCC Grade M20 a. Height upto 5m 'Case I. Using concrete Mixer
Curtain wall complete as per drawing and Technical specification 'B. Cement concrete Grade M15
Supplying, fitting and placing TMT IS:1786 (Fe 500) bar reinforcement in sub-structure complete as per drawing and technical specifications (b). TMT-IS 1786 ( Fe-500 D) Secondary Producer (ISI approved)
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification 'B. Sandy material
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specification.
Flexible Apron :Construction of flexible apron 1 m thick comprising of loose stone boulders weighing not less than 40 kg beyond curtain wall.
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications
Construction of RCC railing of M30 Grade in-situ with 20 mm nominal size aggregate, true to line and grade, tolurence of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequat space between vertical posts for expansion, complete as per approved drawings and technical specifications.
UCN CONSTRUCTION COMPANY PRIVATE LIMITED
Sri Babul Nath
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid