Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1st₹71.0 LAccepted-AOC ROOM NO 220 2ND FLOOR DEVGIRI BUILDING NO 65 B LALLU BHAI COMPOUND MANKHURD MUMBAI 400043 | MUMBAI SUBURBAN | MAHARASHTRA | 400043 | 1st | Accepted-AOC The M/s MP Construction is being L1 and accepted please. | |
| 2 | 2nd₹74.9 L+₹2.4 L (3.37%)Rejected-Finance SHOP NO 4 SUN STAR CHS LTD PLOT NO 309 SECTOR 21 NERUL EAST NAVI MUMBAI 400 706 | THANE | MAHARASHTRA | 400706 | 2nd | Rejected-Finance Not being L1 | |
| 3 | 3rd₹75.3 L+₹2.9 L (4.01%)Rejected-Finance | 3rd | Rejected-Finance Not being L1 | |
| 4 | 4th₹79.6 L+₹7.2 L (9.94%)Rejected-Finance | 4th | Rejected-Finance Not being L1 | |
| 5 | 5th₹85.8 L+₹13.4 L (18.5%)Rejected-Finance A 303 SHREE KRISHNA COMPLEX CO OP HSG SOC LTD WESTERN EXPRESS HIGHWAY OPP NATIONAL PARK BORIVALI E MUMBAI 400066 | MUMBAI SUBURBAN | MAHARASHTRA | 400066 | 5th | Rejected-Finance Not being L1 |
| Sl No | Description | Qty | Unit | Shetty Construction Co L3 | the bhimani group of companies L8 | Vishal Builders L7 | RSG INFRASTRUCTURE L4 | mp construction co L1 | Parmatma Enterprises L2 | Nilesh Construction L5 | LUCKY DECOR L6 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Demolition cement concrete (unreinforced) in ground floors and pavings not exc 15 cm thickness (below or above ground level), incl tiles complete all as specified and directed. | 22 | Cum | 600 ₹13,200 | 1,000 ₹22,000 | 1,000 ₹22,000 | 650 ₹14,300 | 100 ₹2,200 Lowest | 300 ₹6,600 | 230 ₹5,060 | 500 ₹11,000 |
| 2.00 | M&L chequered cement concrete tiles of size 200x200x25mm thick in floor set jointed and pointed in neat cement slurry in floors with grey cement and pigment with and including cement scred bed 20 mm thick in CM 1:6 complete all as specified and as directed by Engr-in-Charge. | 90 | Sqm | 650 ₹58,500 Lowest | 1,500 ₹1,35,000 | 1,100 ₹99,000 | 800 ₹72,000 | 900 ₹81,000 | 730 ₹65,700 | 890 ₹80,100 | 1,100 ₹99,000 |
| 3.00 | M&L for 75mm thick cement concrete (1:4:8) type D-2 using 40 mm graded stone aggregate as in sub base of flooring/ hard standing path and finishing the surface even and fair without using extra cement all as specified and directed. | 140 | Sqm | 250 ₹35,000 | 800 ₹1,12,000 | 350 ₹49,000 | 350 ₹49,000 | 180 ₹25,200 Lowest | 250 ₹35,000 | 256 ₹35,840 | 280 ₹39,200 |
| 4.00 | M&L for 75 mm thick (1:2:4) Type B-1, Plain cement concrete with using 20mm graded aggregate as in ground floors finished even and smooth without using extra cement, complete all as specified and directed. | 30 | Sqm | 350 ₹10,500 | 800 ₹24,000 | 500 ₹15,000 | 450 ₹13,500 | 300 ₹9,000 Lowest | 300 ₹9,000 Lowest | 383 ₹11,490 | 350 ₹10,500 |
| 5.00 | M&L for 75mm thick cement concrete (1:36) type C-2 using 40 mm graded stone aggregate as in Plinth protection of flooring finishing the surface even and fair without using extra cement all as specified and directed. | 45 | Sqm | 300 ₹13,500 | 900 ₹40,500 | 300 ₹13,500 | 400 ₹18,000 | 300 ₹13,500 | 250 ₹11,250 Lowest | 290 ₹13,050 | 320 ₹14,400 |
| 6.00 | Demolition of brick work built in cement mortar including all quoins, arches, pillars, PCC coping etc, but excluding ashlar facings, dressed stonework and precast concrete articles and removing of debris outside MD land complete all as specified and as directed by Engineer-in-Charge. | 3 | Cum | 450 ₹1,350 | 1,000 ₹3,000 | 900 ₹2,700 | 500 ₹1,500 | 100 ₹300 Lowest | 300 ₹900 | 110 ₹330 | 500 ₹1,500 |
| 7.00 | M&L for brick work with sub class 'B' bricks straight or curved on plan exc 6m mean radius built in cement mortar 1:6 complete all as specified and as directed. | 2 | Cum | 5,200 ₹10,400 | 10,000 ₹20,000 | 8,000 ₹16,000 | 6,000 ₹12,000 | 3,000 ₹6,000 Lowest | 7,000 ₹14,000 | 5,900 ₹11,800 | 4,000 ₹8,000 |
| 8.00 | M&L brick work with sub class 'B' bricks, straight or curved on plan to any radius in 1/2 brick thick walls, built in cement morter 1:4 complete complete all as specified and as directed. | 10 | Sqm | 650 ₹6,500 | 800 ₹8,000 | 900 ₹9,000 | 500 ₹5,000 Lowest | 800 ₹8,000 | 600 ₹6,000 | 800 ₹8,000 | 560 ₹5,600 |
| 9.00 | M & L for Treating (Anti Tremite Treatment) the soil along with external perimetar of building at the rate of 2.25 litre of emulsion per metre of the perimeter wall complete all as specified and directed by Engineer -in-charge. | 270 | Sqm | 140 ₹37,800 | 150 ₹40,500 | 80 ₹21,600 | 80 ₹21,600 | 56 ₹15,120 | 120 ₹32,400 | 50 ₹13,500 Lowest | 50 ₹13,500 Lowest |
| 10.00 | M & L for Treating (Anti Tremite Treatment) the soil along with intrnal perimeter of wall at the rate of 2.25 litre of emulsion per metre of the perimeter wall complete all as specified and directed by Engineer -in-charge. | 500 | RM | 75 ₹37,500 | 150 ₹75,000 | 80 ₹40,000 | 90 ₹45,000 | 35 ₹17,500 Lowest | 120 ₹60,000 | 53 ₹26,500 | 36 ₹18,000 |
Tender Value
₹1.0 Cr
EMD Value
₹1.8 L
Closing Date
9 Aug 2025, 6:00 pmClosed
Shri Vinay Kumar, IDSE, SE (SAG), CWE.
Headquarters Commander Works Engineer (Army) 24 Assaye Building, Colaba Mumbai-400 005
SPECIAL REPAIR TO BLDG NO B 8 OF DGQA RESIDENTIAL COMPLEX GHATKOPER UNDER GE NORTH SANTACRUZ MUMBAI
2025_MES_717146_1
85196/N/E8
Open Tender
Civil Works
Item Rate
270 days
Santacruz
As per NIT
8 documents required · 8 mandatory
₹1,000
GE North Santacruz
₹1.8 L
Yes
15 Nov 2025
27 Jun 2025
11 Aug 2025
27 Jun 2025
9 Aug 2025
28 Jul 2025
27 Jun 2025 - 4 Jul 2025
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .