Tender Value
₹11.8 L
EMD Value
₹12,000
Closing Date
24 Jun 2026, 1:00 pm
SE ETC Mathura
132 KV S/S Aurangabad Mathura
Work of Revetment on Tower No. 22 of 132 KV Kirawali 220-Mathura Line under ETD Mathura
2026_UPTCL_1156778_1
ET-08/ETC(M)/26-27
Open Tender
Electrical Works
90 days
Under ETC Mathura
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
EE ATT ETC Mathura
₹12,000
3 Jun 2026
3 Jun 2026
25 Jun 2026
3 Jun 2026
24 Jun 2026
3 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Excavation of earth with the help of T&P and labour, watering and ramming of excavated earth. | 123.14 | M3 | 133.71 | ₹16,464.51 | item1 |
| 2 | Cement concrete with 40 mm stone blast, coarse sand and cement mortar in ratio 1:4:8 in foundation and under floor including the cost of all labour and material required T&P for proper completion of sartisfactory work | 18.29 | M3 | 4,050.48 | ₹74,075.18 | item2 |
| 3 | First class brick work for construction of retaining wall in ratio 1:4 with cement and fine sand including the cost of all labour and material required T&P for proper completion of sartisfactory work | 0.6 | M3 | 4,632.49 | ₹2,779.49 | item3 |
| 4 | Cement concrete in plinth with 20mm stone ballast , coarse sand and cement mortar in ratio of 1:2:4 including the cost of all labour and material ,required T&P for proper completion of work | 8.35 | M3 | 5,426.85 | ₹45,297.92 | item4 |
| 5 | 12 mm thick plaster work on wall & top with cement and sand in ratio of 1:4 including the cost of all labour and material ,required T&P for proper completion of work | 289.76 | M2 | 149.44 | ₹43,301.73 | item5 |
| 6 | Earth filling under the floor in area between tower foundation and retaining wall in including the cost of soil to be obtained by the contractor from outside including waterning ramming and dressing of earth etc complete with the cost of earth royality, taxes, freight etc with cost of material labour and T&P etc for proper completion of work | 321.3 | M3 | 287.07 | ₹92,235.59 | item6 |
| 7 | First class brick work on edge floor laid including prepation of base to proper slope including supply of all material labour and T&P etc for proper completion of work | 132.25 | M2 | 287.07 | ₹37,965.01 | item7 |
| 8 | Tor steel in plain work such as reinforced concrete or reinforced brick work(when not included in all over rates )wrought to required shape as necessary including bending for proper completion of work and including supply of steel its wastage bend ,beam and authorized overlapping as required for proper completion of the work. 12 mm Midsteel ring 8 mm (Extra Bar) | 616.87 | KG | 70 | ₹43,181.18 | item8 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.40 MB
NITF.pdf
Tender Documents • 0.98 MB
BOQ_2167594.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid