Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.6 LAccepted-AOC | L1 | Accepted-AOC Qualified |
Tender Value
₹6.9 L
EMD Value
₹6,945
Closing Date
18 Apr 2026, 5:30 pmClosed
COMMISSIONER OF UJJAIN MUNICIPAL CORPORATION
CCHATRAPATI SHIVAJI BHAWAN, AGAR ROAD UJJAIN
CONSTRUCTION OF CC ROAD AND DRAIN BEHIND THE MULTI-STOREY BUILDING OF BHAIRAVGARH POLICE STATION UNDER WARD NO. 01
2026_UAD_474558_3
189/ZONE1/E-TENDER/202
Open Tender
Civil Works - Others
Percentage
60 days
MULTI-STOREY BUILDING OF BHAIRAVGARH POLICE STATIO
PLEASE REFER TENDER DOCUMENT
4 documents required · 4 mandatory
₹2,000
₹6,945
24 Jun 2026
3 Apr 2026
21 Apr 2026
3 Apr 2026
18 Apr 2026
3 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | EXCAVATION FOR ROADWAY IN SOIL BY MANUAL MEANS INCLUDING LOADING IN TIPPERS AND DISPOSAL WITH ALL LIFTS AND LEAD UPTO 1000 METERS AN D AS PER RELEVANT CLAUSES OF SECTION-300. | - | M3 | - | - |
| 2 | CONSTRUCTION OF EMBANKMENT/SUB GRADE/ EARTH SHOULDERS, AS PER CLAUSE 305 & ITS SUB- CLAUSES, WHERE REQUIRED BUT WITH APPROVED MATERI ALS/ SOIL LIKE MORRUM CBR VALUE NOT LESS THEN 7% I/C ALL LEAD & LIFTS I/C EXCAVATION, COST OF WATERING, COMPACTION BY VIBRATORY ROLLE R/ HEAVY PNEUMATIC TYPE ROLLER AND MAINTENANCE OF SURFACE DURING CONSTRUCTION TO ENSURE SHEDDING & PREVENTING PONDING OF WATER (CLAU SE 305.3.6) SHAPING & DRESSING (CLAUSE 305.3.7), FINISHING ETC. COMPLETE BUT EXCLUDING SCARIFYING EXISTING GRANULAR/BITUMINOUS | - | M3 | - | - |
| 3 | CONSTRUCTION OF GRANULAR SUB-BASE BY PROVIDING COARSE GRADED MATERIAL (CBR>30), SPREADING IN UNIFORM LAYERS WITH MOTOR GRADER ON PR EPARED SURFACE, MIXING BY MIX IN PLACE METHOD AT OMC AND COMPACTING WITH VIBRATORY ROLLER OF 80-100 KN STATIC WEIGHT TO ACHIEVE THE DESIRED DENSITY, COMPLETE IN ALL RESPECT AS PER RELEVANT CLAUSES OF | - | M3 | - | - |
| 4 | CONSTRUCTION OF DRY LEAN CEMENT CONCRETE SUB-BASE OVER A PREPARED SUB GRADE WITH COARSE AND FINE AGGREGATE CONFORMING TO IS: 383, T HE SIZE OF COARSE AGGREGATE NOT EXCEEDING 26.5MM, AGGREGATE CEMENT RATIO NOT TO EXCEED 15:1, AGGREGATE GRADATION AFTER BLENDING TO B E AS PER MORTH SPECIFICATIONS TABLE 600-1, CEMENT CONTENT NOT TO BE LESS THAN 150 KG/CUM, OPTIMUM MOISTURE CONTENT TO BE DETERMINED DURING TRIAL LENGTH CONSTRUCTION, CONCRETE STRENGTH NOT TO BE LESS THAN 10 MPA AT 7 DAYS, MIXED IN A BATCHING PLANT, TRANSPORTED TO SITE, LAID WITH PAVER WITH ELECTRONIC SENSOR/ MECHANICAL PAVER, COMPACTING WITH 8-10 TONNES VIBRATORY ROLLER, FINISHING AND CURING AN D AS PER | - | M3 | - | - |
| 5 | PROVIDING AND LAYING CEMENT CONCRETE GRADE M-20 (NOMINAL MIX 1:1.5:3) WITH 20 MM GRADED CRUSHED STONE AGGREGATE, MIXING SHALL BE IN MECHANICAL MIXER, LAYING WITH PAVER COMPACTING BY USE OF PIN, PLATE / SCREED VIBRATORS INCLUDING FORM WORK BY STRONG STEEL GIRDERS FIXED BY SPIKES, SEPARATION MEMBRANE 125 MICRON THICK, I/C CUTTING OF JOINTS @ 4 TO 5 M INTERVAL & FILLING IT WITH HOT APPLIED BITUM INOUS SEALANT (WITHOUT DOWEL BARS). (MAX. | - | M3 | - | - |
| 6 | exvation work with 05KM Extra lead | - | M3 | - | - |
| 7 | MOORUM/HARD COPRA- "SUPPLYING AND FILLING IN PLINTH UNDER FLOORS INCLUDING, WATERING, RAMMING CONSOLIDATING AND DRESSING COMPLETE." | 1 | M3 | - | - |
| 8 | CEMENT CONCRETE GRADE M-10 (NOMINAL MIX) WITH 20 MM MAXIMUM SIZE OF STONE AGGREGATE- PROVIDING AND LAYING IN POSITION CEMENT CONCRETE OF SPECIFIED GRADE EXCLUDING THE COST OF CENTERING AND SHUTTERING ALL WORK UP | 1 | M3 | - | - |
| 9 | CEMENT CONCRETE GRADE M-20 (NOMINAL MIX) WITH 20 MM MAXIMUM SIZE OF STONE AGGREGATE.- "PROVIDING AND LAYING IN POSITION SPECIFIED GRA DE OF REINFORCED CEMENT CONCRETE EXCLUDING THE COST OF CENTERING, SHUTTERING, FINISHING AND REINFORCEMENT - ALL WORK UP TO PLINTH LE | 1 | M3 | - | - |
| 10 | WALLS (ANY THICKNESS) INCLUDING ATTACHED PILASTERS, BUTTERESSES, PLINTH AND STRING COURSES ETC"- "CENTERING AND SHUTTERING INCLUDING STRUTTING, PROPPING STRETCHING ETC. COMPLETE FOR AND REMOVAL OF FORM WORK BY SHEET PLATE OR PLY | - | M2 | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.06 MB
tender.pdf
Tender Documents • 1.85 MB
NIT.pdf
Other Document • 0.04 MB
BOQ_596242.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .