| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹57.1 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹58.1 L+₹95,098.80 (1.66%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹59.3 L+₹2.2 L (3.90%)Admitted-Finance 6TH FLOOR 602 SHIV SHRUSHTHI CHS LTD LINK ROAD KANDIVALI MUMBAI 400067 | MUMBAI | MUMBAI SUBURBAN | MAHARASHTRA | 400067 | L3 | Admitted-Finance | ||
| 4 | Rejected-Technical | - | Rejected-Technical As per committee report |
Tender Value
₹58.7 L
EMD Value
₹1.2 L
Closing Date
24 Sept 2026, 6:00 pmClosed
AGM(CE)
FCI Zonal Office West Rajendra Nagar, Borivali East 400066
ARMO of FCI Flats at Sky Scraper (Warden Road), Cuffe Castle (Colaba), and Sarita (Bandra), Mumbai for F.Y. 2026-27
2026_FCI_925779_1
01/2026-27
Open Tender
Civil Works
Percentage
365 days
Colaba Warden road Bandra
As per NIT
2 documents required · 2 mandatory
₹0
₹1.2 L
FCI ZO WEST
6 Oct 2026
10 Sept 2026
25 Sept 2026
10 Sept 2026
24 Sept 2026
10 Sept 2026
10 Sept 2026 - 24 Sept 2026
17 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of flushing cistern of all types (C.I./PVC/Vitreous China) including stacking of useful materials near the site and disposal of Unserviceable materials up to all lead and lift | 22 | Each | 112.05 | ₹2,465.1 |
| 2 | Dismantling W.C. Pan of all sizes including disposal of dismantled materials i/c malba all complete as per directions of Engineer-in- Charge | 18 | Each | 134.1 | ₹2,413.8 |
| 3 | Dismantling doors, windows and clerestory windows (steel or wood) shutter including chow hats, architrave, holdfasts etc. complete and stacking up to all lead and lift : Of area 3 sq. metres and below | 20 | Each | 367.2 | ₹7,344 |
| 4 | Dismantling tile work in floors and roofs/wall laid in cement mortar including stacking material up to all lead and lift. : for thickness of tiles 10 mm to 25 mm | 301.27 | Sqm | 73.4 | ₹22,113.22 |
| 5 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. | 200 | Sqm | 54.65 | ₹10,930 |
| 6 | 12 mm cement plaster of mix : 1:6 ( 1 Cement : 6 Fine Sand) | 250 | Sqm | 333.35 | ₹83,337.5 |
| 7 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, i/c fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and the cost of cutting chases and making good the same including testing of joints complete as per direction of Engineer in Charge. Concealed work, including cutting chases and making good the walls. 20 mm nominal outer dia Pipes. | 330 | meter | 537.6 | ₹1,77,408 |
| 8 | Providing and fixing Ist quality ceramic glazed wall tiles conforming to IS: 15622 (thickness to be specified by the manufacturer), of approved make, in all colours, shades except burgundy, bottle green, black of any size as approved by Engineer-in-Charge, in skirting, risers of steps and dados, over 12 mm thick bed of cement mortar 1:3 (1 cement : 3 coarse sand) and jointing with grey cement slurry @ 3.3kg per sqm, including pointing in white cement mixed with pigment of matching shade complete. | 190.74 | Sqm | 1,267.95 | ₹2,41,847.52 |
| 9 | Providing and laying water proofing treatment in sunken portion of WCs, bathroom etc., by applying cement slurry mixed with water proofing cement compound consisting of applying : (a) First layer of slurry of cement @ 0.488 kg/sqm mixed with water proofing cement compound @ 0.253 kg/ sqm. This layer will be allowed to air cure for 4 hours. (b) Second layer of slurry of cement @ 0.242 kg/sqm mixed with water proofing cement compound @ 0.126 kg/sqm. This layer will be allowed to air cure for 4 hours followed with water curing for 48 hours. The rate includes preparation of surface, treatment and sealing of all joints, corners, junctions of pipes and masonry with polymer mixed slurry. | 61.73 | Each | 617.05 | ₹38,090.5 |
| 10 | Providing and laying Vitrified tiles in floor in different sizes (thickness to be specified by the manufacturer) with water absorption less than 0.08% and conforming to IS:15622, of approved brand & manufacturer, in all colours and shade, laid on 20 mm thick cement mortar 1:4 (1 cement: 4 coarse sand) jointing with grey cement slurry @3.3 kg/sqm including grouting the joints with white cement and matching pigments etc. The tiles must be cut with the zero chipping diamond cutter only . Laying of tiles will be done with the notch trowel, plier, wedge, clips of required thickness, leveling system and rubber mallet for placing the tiles gently and easily.cement : 4 coarse sand), including grouting the joints with white cement and matching pigments etc., complete. Size of Tile 600x600 mm : Glazed vitified tiles Matt/Anti Skid finish of size 600 X 600. | 115.76 | Sqm | 1,464.85 | ₹1,69,571.04 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.81 MB
SignedNIT.pdf
Tender Documents • 0.48 MB
BOQ_972859.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .